Scope Revision Audit & Comparison
Job: JOB-PAC843-2026 (PAC 843) · Revision: All Revisions
PREVIOUS BASELINE QUOTATION
RM 37,859.04
53 scope lines (Original)
REVISED QUOTATION TOTAL
RM 37,859.04
53 active lines
NET QUOTATION VARIANCE
RM -0.00
Section A Revision Variance
HISTORICAL PCQ BASELINE (LOCKED)
RM 35,038.38
Hard-locked Section B · Untouched
📋 Detailed Item Comparison (Previous vs KK Revision)
Unchanged: 53
Modified: 0
Added: 0
Superseded: 0
| Item No. | Change Type | Description | Quantity & UOM | Rate (RM) | Line Total (RM) | Tariff Link | Revision Notes / Reason |
|---|---|---|---|---|---|---|---|
| 1.1 | UNCHANGED | Transport for sending and return. | 2 time | RM 516.10 | RM 877.37 | Para 2.1 | — |
| 1.2 | UNCHANGED | Docking Charges @ 30 Days | 30 days | RM 42.90 | RM 328.19 | Para 2.2 | — |
| 2.1 | UNCHANGED | Labour and material to remove, renew and welding aluminium plate, replating the whole underwater hull 4.72m x 0.74 m x 2 pcs and ship side plating 0.18 m x 3.66 m x 2 pcs - total 8.3 m² | 8.3 unit | RM 2,206.60 | RM 15,567.56 | Para 5.2 | — |
| 2.1 | UNCHANGED | Labour and material to remove, renew keel strake with aluminium angle bar 50.8mm x 50.8mm x 2.44 meter - 6 pcs | 2.44 X 6 unit | RM 103.40 | RM 1,930.06 | Para 5.3.2 | — |
| 2.2 | UNCHANGED | Labour and material to remove, repair and reinstall aluminium plate for transom and bracket port and stbd Aluminium plate 4mm - 1 m² | 1 unit | RM 2,206.60 | RM 1,875.61 | Para 5.2 | — |
| 2.3 | UNCHANGED | Labour and material to install wooden selangan batu for transom 2" X 8" X 1 meter - 1 pc | 16 m/h | RM 18.50 | RM 251.60 | Para 41 | — |
| 2.3 (i)) | UNCHANGED | Wooden Selangan batu 2" X 8" X 1 meter - 2 sheet | 2 sheet | RM 150.00 | RM 330.00 | Para 42 | — |
| 2.4 | UNCHANGED | Labour and material to power cup brush underwater hull, shipside and transom to bare metal. (9.44 m2) | 9.44 unit | RM 20.64 | RM 165.62 | Para 3.8 (a) | — |
| 2.5 | UNCHANGED | To wash down after grinding and before painting underwater hull area. (9.44m2) | 9.44 unit | RM 3.00 | RM 24.07 | Para 3.2 | — |
| 2.6 | UNCHANGED | Labour to paint underwater hull and transom at external area with of paint including 4 layer of full coat at antifouling.(Paint Supply by kontraktor) | 9.44 unit | RM 2.20 | RM 70.61 | Para 3.11 (a) | — |
| 2.6 (i)) | UNCHANGED | Hempel paint undercoat red - 1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 2.6 (ii)) | UNCHANGED | Hempadur quattro -1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 2.6 (iii)) | UNCHANGED | Yellowish grey - 1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 2.6 (iv)) | UNCHANGED | Anti fouling paint - 1 tin | 1 tin | RM 840.00 | RM 924.00 | Para 42 | — |
| 2.6 (v)) | UNCHANGED | Hempel Thinner - 1 tin | 1 kg | RM 105.00 | RM 115.50 | Para 42 | — |
| 2.7 | UNCHANGED | Labour to remove, renew and install drain plug. floorboard and transom area at defective area | 4 m/h | RM 18.50 | RM 62.90 | Para 41 | — |
| 2.7 (i)) | UNCHANGED | Drain plug - 3 pcs | 3 pcs | RM 55.00 | RM 181.50 | Para 42 | — |
| 3.1 | UNCHANGED | Labour and material to remove, grind, service and reused/ welding aluminium plate for floorboard. | 48 m/h | RM 18.50 | RM 754.80 | Para 41 | — |
| 3.1 (i)) | UNCHANGED | Argos Gas - 1 cyld | 1 cyl | RM 260.00 | RM 286.00 | Para 42 | — |
| 3.1 (ii)) | UNCHANGED | Welding Rod - 5 kg | 5 kg | RM 150.00 | RM 825.00 | Para 42 | — |
| 3.1 (iii)) | UNCHANGED | Repair kit - 4 set | 4 set | RM 60.00 | RM 264.00 | Para 42 | — |
| 3.2 | UNCHANGED | Labour and material remove old foam and refit new polystyrene, including cleaning internall hull. | 24 m/h | RM 18.50 | RM 377.40 | Para 41 | — |
| 3.2 (i)) | UNCHANGED | Polysterene thick 8'' x L6' x W4' - 2 sheets | 2 sheet | RM 480.00 | RM 1,056.00 | Para 42 | — |
| 3.3 | UNCHANGED | Labour and material remove renew hull frame bracket under floor board with aluminium flat bar 75 mm which are corroded and fitted - 10 pcs | 10 m | RM 84.70 | RM 719.95 | Para 5.3.1 | — |
| 3.4 | UNCHANGED | Labour to paint hull frame at external and floorboard, surrounding and rear floorboard and shipside area. (Paint Supply by kontraktor) | 9.44 unit | RM 2.20 | RM 70.61 | Para 3.11 (a) | — |
| 3.4 (i)) | UNCHANGED | Hempel paint undercoat red - 1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 3.4 (ii)) | UNCHANGED | Yellowish grey - 1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 3.4 (iii)) | UNCHANGED | Hempel paint blue - 1 tin | 1 tin | RM 368.00 | RM 404.80 | Para 42 | — |
| 3.4 (iv)) | UNCHANGED | Anti fouling paint - 1 tin | 1 tin | RM 840.00 | RM 924.00 | Para 42 | — |
| 3.4 (v)) | UNCHANGED | Hempel Thinner - 1 tin | 1 kg | RM 105.00 | RM 115.50 | Para 42 | — |
| 3.4 | UNCHANGED | Labour to paint hull frame at external and floorboard, surrounding and rear floorboard and shipside area. (Paint Supply by kontraktor) | 1 bag | RM 100.00 | RM 110.00 | Para 42 | — |
| 4.1 | UNCHANGED | Labour to grinding in all position to bare metal shipside port and stbd. | 8 M2 | RM 21.12 | RM 143.62 | Para 3.6 | — |
| 4.2 | UNCHANGED | Labour and material to check, repair and renew the defective scratch, broken and cracked of shipside beam. | 24 m/h | RM 18.50 | RM 377.40 | Para 41 | — |
| 4.2 (i)) | UNCHANGED | Welding Rod - 2 kg | 4 kg | RM 150.00 | RM 660.00 | Para 42 | — |
| 4.2 (ii)) | UNCHANGED | Argos Gas - 1 cyld | 1 cyl | RM 260.00 | RM 286.00 | Para 42 | — |
| 4.3 | UNCHANGED | To wash down after grinding and before painting shipside area. (8 m2) | 8 unit | RM 3.00 | RM 20.40 | Para 3.2 | — |
| 4.4 | UNCHANGED | Labour to paint according to scheme shipside port and stbd. (min.charge 10m2) (Paint Supply by Kontraktor) | 10 unit | RM 2.20 | RM 37.40 | Para 3.11 (a) | — |
| 4.4 (i)) | UNCHANGED | Hempel paint undercoat red - 1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 4.4 (ii)) | UNCHANGED | Yellowish grey - 1 tin | 1 tin | RM 280.00 | RM 308.00 | Para 42 | — |
| 4.4 (iii)) | UNCHANGED | Hempel paint blue - 1 tin | 1 tin | RM 368.00 | RM 404.80 | Para 42 | — |
| 4.4 (iv)) | UNCHANGED | Hempel Thinner - 1 tin | 1 kg | RM 105.00 | RM 115.50 | Para 42 | — |
| 4.5 | UNCHANGED | Labour to repaint boat number and draft mark. Boat number with the location. | 2 unit | RM 169.60 | RM 288.32 | Para 3.12 | — |
| 4.6 | UNCHANGED | Labour to remove, renew and install sst cleat bow. | 12 m/h | RM 18.50 | RM 188.70 | Para 41 | — |
| 4.6 (i)) | UNCHANGED | SST cleat 6" - 6 pcs | 6 pcs | RM 250.00 | RM 1,650.00 | Para 42 | — |
| 5.1 | UNCHANGED | Labour and material to remove, renew and install seat for passenger and boatman. Install the legs in the middle of each seat. | 8 m/h | RM 18.50 | RM 125.80 | Para 41 | — |
| 5.1 (i)) | UNCHANGED | Wooden selangan batu 2" x 8" x 6' - 3 pcs | 3 pcs | RM 250.00 | RM 825.00 | Para 42 | — |
| 5.1 (ii)) | UNCHANGED | SST bolt and nuts 4" - 12 pcs | 12 pcs | RM 25.00 | RM 330.00 | Para 42 | — |
| 7.1 | UNCHANGED | To carry out supply boat accessories on board. | 2 m/h | RM 18.50 | RM 31.45 | Para 41 | — |
| 7.1 (a)) | UNCHANGED | Paddle - 2 Unit | 2 unit | RM 150.00 | RM 330.00 | Para 42 | — |
| 7.1 (d)) | UNCHANGED | Fender F2 - 2 Pcs | 2 pcs | RM 245.00 | RM 539.00 | Para 42 | — |
| 7.1 (e)) | UNCHANGED | Boat Hook - 1 Pc | 1 pcs | RM 150.00 | RM 165.00 | Para 42 | — |
| 7.1 (f)) | UNCHANGED | First Aid Kit - 1 Set | 1 set | RM 120.00 | RM 132.00 | Para 42 | — |
| 7.1 (h)) | UNCHANGED | Nylon rope 16mm - 20 metre | 20 m | RM 20.00 | RM 440.00 | Para 42 | — |