← Back to Dashboard

Tariff Master & Schedule of Rates

Official Government & Commercial Marine Repair Tariffs · Digitalized Authoritative Source: Jadual Kadar Untuk Kerja-Kerja Pembaikan Dan Penyelenggaraan Bot/Kapal Kerajaan 2012 (v)

SHA: 94c739f00151 75 Pages Indexed
Total Staged Items
169
Structurally Clean
167
Active Catalog Items
445
GANPS Verified
0
Review Required
1
Source Conflict
1

⚠️ Tariff Staging Exceptions Requiring Expert Review (2)

Preserved in staging without auto-promoting to active catalog
Para Description Source Page State Flags
Terms.b Cost of access work is not included in the Schedule of Rates unless specified Page 9 SOURCE_CONFLICT NON_PRICED_CONDITION
3.13 Araldite Coating (Cost plus 15% mark-up) Page 17 REVIEW_REQUIRED RATE_AS_MARKUP_PERCENTAGE,MISSING_NUMERIC_RATE

📖 Active Tariff Master Items (445)

Primary UX: FIND → COMPARE → VERIFY → USE
Para / Code Description / Specification Cat Official Rate Unit Source Verification Action
Terms
.all
Terms and Conditions - General Regulations
0 TERMS AND CONDITIONS
ALL — Clause Page 9 ↗ STRUCT CLEAN
View & Verify
Terms.b
.access_work
Cost of access work is not included in the Schedule of Rates unless specified
0 TERMS AND CONDITIONS
ALL — clause Page 9 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
A RM 58.40 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
A RM 25.64 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
A RM 29.88 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
B RM 50.40 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
B RM 21.64 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
B RM 25.88 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
C/D RM 45.40 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
C/D RM 19.14 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
C/D RM 23.38 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
E RM 38.90 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
E RM 15.89 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
E RM 20.13 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
2.0
.all
Docking Charges
2 DOCKING CHARGES
ALL — — Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
C/D RM 159.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
C/D RM 367.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
C/D RM 552.50 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
C/D RM 737.10 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
E RM 148.20 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
E RM 348.20 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
E RM 516.10 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
E RM 689.00 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
A RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
A RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
A RM 130.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
B RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
B RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
B RM 130.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
C/D RM 66.10 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
C/D RM 72.60 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
C/D RM 96.80 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
E RM 42.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
E RM 55.00 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
E RM 73.70 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.3
.all
Tug Boat Assistance - Tug Boat Rental (Per hour per tug)
2 DOCKING CHARGES
ALL — per hour Page 12 ↗ STRUCT CLEAN
View & Verify
2.4
.all
Remove and Replace Bilge or Keel Blocks
2 DOCKING CHARGES
ALL — per block Page 12 ↗ STRUCT CLEAN
View & Verify
2.5
.all
Propeller Shaft Coupling
2 DOCKING CHARGES
ALL — per coupling Page 13 ↗ STRUCT CLEAN
View & Verify
2.6
.all
Ship Deflection Reading
2 DOCKING CHARGES
ALL — per reading Page 13 ↗ STRUCT CLEAN
View & Verify
3.0
.all
Surface Preparation and Preservation
3 SURFACE PREPARATION AND PRESERVATION
ALL — — Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
A RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
B RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
E RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
A RM 4.80 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
B RM 4.32 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 3.96 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
E RM 3.00 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
A RM 7.26 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
B RM 6.60 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 6.12 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
E RM 4.56 m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.4
.all
Hydro Blasting to Standard ST 3 (Inclusive of labour and one coat primer)
3 SURFACE PREPARATION AND PRESERVATION
ALL — per m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.5
.all
Grinding (In any position to sound paint)
3 SURFACE PREPARATION AND PRESERVATION
ALL — per m² Page 14 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 33.00 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 52.80 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 29.28 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 52.80 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 27.72 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 49.92 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 21.12 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 38.04 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 79.44 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 94.56 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 70.56 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 84.48 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 65.52 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 83.16 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 50.16 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 63.00 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 32.76 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 39.60 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 29.04 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 34.32 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 27.12 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 32.64 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 20.64 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 32.64 m² Page 15 ↗ STRUCT CLEAN
View & Verify
3.10
.all
Grit Blasting To SA 1 (Copper grit / Garnet)
3 SURFACE PREPARATION AND PRESERVATION
ALL — per m² Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 3.50 m² Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 3.12 m² Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 2.80 m² Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 2.20 m² Page 16 ↗ STRUCT CLEAN
View & Verify
3.9
.all
Grit Blasting To SA 2.5 (Copper grit / Garnet)
3 SURFACE PREPARATION AND PRESERVATION
ALL — per m² Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 5.30 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
A RM 7.40 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 4.70 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
B RM 6.60 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 4.30 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 6.10 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 3.40 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
E RM 4.70 m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
A RM 230.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
A RM 256.00 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
B RM 230.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
B RM 256.00 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 222.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 238.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
E RM 169.60 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
E RM 180.80 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.13
.araldite
Araldite Coating (Cost plus 15% mark-up)
3 SURFACE PREPARATION AND PRESERVATION
ALL RM 15.00 percent Page 17 ↗ STRUCT CLEAN
View & Verify
3.14
.all
Application of Rust Converter, seal (3 layers)
3 SURFACE PREPARATION AND PRESERVATION
ALL — per m² Page 17 ↗ STRUCT CLEAN
View & Verify
3.15
.all
Surface Preparations of GRP Painted Surfaces
3 SURFACE PREPARATION AND PRESERVATION
ALL — per m² Page 18 ↗ STRUCT CLEAN
View & Verify
4.0
.all
General Services
4 GENERAL SERVICES
ALL — — Page 18 ↗ STRUCT CLEAN
View & Verify
4.1
.all
Wharfage (Per day or part of a day)
4 GENERAL SERVICES
ALL — per day Page 18 ↗ STRUCT CLEAN
View & Verify
4.2
.all
Shore Power Supply
4 GENERAL SERVICES
ALL — — Page 19 ↗ STRUCT CLEAN
View & Verify
4.2.1
.all
Shore Power Supply - 415V, 3 Phase, 50Hz
4 GENERAL SERVICES
ALL — per kWh Page 19 ↗ STRUCT CLEAN
View & Verify
4.2.2
.all
Shore Power Supply - 440V, 3 Phase, 60Hz
4 GENERAL SERVICES
ALL — per kWh Page 19 ↗ STRUCT CLEAN
View & Verify
4.2.3
.a
Shore Supply Connection and Disconnection (Cat A)
4 GENERAL SERVICES
A RM 148.50 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.2.3
.b
Shore Supply Connection and Disconnection (Cat B)
4 GENERAL SERVICES
B RM 132.00 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.2.3
.c_d
Shore Supply Connection and Disconnection (Cat C/D)
4 GENERAL SERVICES
C/D RM 123.20 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.2.3
.e
Shore Supply Connection and Disconnection (Cat E)
4 GENERAL SERVICES
E RM 102.30 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.3
.all
Water
4 GENERAL SERVICES
ALL — — Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.1
.all
Fresh Water
4 GENERAL SERVICES
ALL — per ton Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.2
.a
Sea Water (Cat A)
4 GENERAL SERVICES
A RM 0.48 per ton Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.2
.b
Sea Water (Cat B)
4 GENERAL SERVICES
B RM 0.48 per ton Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.2
.c_d
Sea Water (Cat C/D)
4 GENERAL SERVICES
C/D RM 0.48 per ton Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.2
.e
Sea Water (Cat E)
4 GENERAL SERVICES
E RM 0.48 per ton Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.3
.a
Water Connection and Disconnection (Cat A)
4 GENERAL SERVICES
A RM 108.00 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.3
.b
Water Connection and Disconnection (Cat B)
4 GENERAL SERVICES
B RM 108.00 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.3
.c_d
Water Connection and Disconnection (Cat C/D)
4 GENERAL SERVICES
C/D RM 96.00 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.3
.e
Water Connection and Disconnection (Cat E)
4 GENERAL SERVICES
E RM 78.00 per connection Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.4
.a
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat A)
4 GENERAL SERVICES
A RM 21.60 per day Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.4
.b
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat B)
4 GENERAL SERVICES
B RM 21.60 per day Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.4
.c_d
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat C/D)
4 GENERAL SERVICES
C/D RM 21.60 per day Page 19 ↗ STRUCT CLEAN
View & Verify
4.3.4
.e
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat E)
4 GENERAL SERVICES
E RM 21.60 per day Page 19 ↗ STRUCT CLEAN
View & Verify
4.4
.all
Compressed Air
4 GENERAL SERVICES
ALL — — Page 20 ↗ STRUCT CLEAN
View & Verify
4.4.1
.all
Compressed Air Supply
4 GENERAL SERVICES
ALL — per day Page 20 ↗ STRUCT CLEAN
View & Verify
4.4.2
.a
Compressed Air Connection and Disconnection (Cat A)
4 GENERAL SERVICES
A RM 49.50 per connection Page 20 ↗ STRUCT CLEAN
View & Verify
4.4.2
.b
Compressed Air Connection and Disconnection (Cat B)
4 GENERAL SERVICES
B RM 44.00 per connection Page 20 ↗ STRUCT CLEAN
View & Verify
4.4.2
.c_d
Compressed Air Connection and Disconnection (Cat C/D)
4 GENERAL SERVICES
C/D RM 41.14 per connection Page 20 ↗ STRUCT CLEAN
View & Verify
4.4.2
.e
Compressed Air Connection and Disconnection (Cat E)
4 GENERAL SERVICES
E RM 31.90 per connection Page 20 ↗ STRUCT CLEAN
View & Verify
4.5
.all
Onboard Fire Precaution and Security
4 GENERAL SERVICES
ALL — — Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.1
.a
Fire Sentry (Per man per hour) (Cat A)
4 GENERAL SERVICES
A RM 70.00 per man hour Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.1
.b
Fire Sentry (Per man per hour) (Cat B)
4 GENERAL SERVICES
B RM 62.00 per man hour Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.1
.c_d
Fire Sentry (Per man per hour) (Cat C/D)
4 GENERAL SERVICES
C/D RM 58.00 per man hour Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.1
.e
Fire Sentry (Per man per hour) (Cat E)
4 GENERAL SERVICES
E RM 44.40 per man hour Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.2
.a
Gas Free Inspection (Per compartment) (Cat A)
4 GENERAL SERVICES
A RM 116.60 per compartment Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.2
.b
Gas Free Inspection (Per compartment) (Cat B)
4 GENERAL SERVICES
B RM 104.50 per compartment Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.2
.c_d
Gas Free Inspection (Per compartment) (Cat C/D)
4 GENERAL SERVICES
C/D RM 97.90 per compartment Page 20 ↗ STRUCT CLEAN
View & Verify
4.5.2
.e
Gas Free Inspection (Per compartment) (Cat E)
4 GENERAL SERVICES
E RM 74.80 per compartment Page 20 ↗ STRUCT CLEAN
View & Verify
4.6
.a
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat A)
4 GENERAL SERVICES
A RM 19.80 per day Page 20 ↗ STRUCT CLEAN
View & Verify
4.6
.b
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat B)
4 GENERAL SERVICES
B RM 17.60 per day Page 20 ↗ STRUCT CLEAN
View & Verify
4.6
.c_d
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat C/D)
4 GENERAL SERVICES
C/D RM 16.39 per day Page 20 ↗ STRUCT CLEAN
View & Verify
4.6
.e
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat E)
4 GENERAL SERVICES
E RM 12.54 per day Page 20 ↗ STRUCT CLEAN
View & Verify
4.7
.all
Cranes (Per hour - When requested)
4 GENERAL SERVICES
ALL — per hour Page 21 ↗ STRUCT CLEAN
View & Verify
4.7.1
.all
Shipyard Crane (Per hour - When requested)
4 GENERAL SERVICES
ALL — per hour Page 21 ↗ STRUCT CLEAN
View & Verify
4.7.2
.all
Mobile Cranes (Per hour - When requested)
4 GENERAL SERVICES
ALL — per hour Page 21 ↗ STRUCT CLEAN
View & Verify
4.8
.all
Transport in Country
4 GENERAL SERVICES
ALL — per trip Page 21 ↗ STRUCT CLEAN
View & Verify
4.9
.all
Split Unit Air Conditioning Hire (Per unit per day upon request)
4 GENERAL SERVICES
ALL — per unit per day Page 21 ↗ STRUCT CLEAN
View & Verify
5.0
.all
Plating
5 PLATING
ALL — — Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
A RM 1,788.60 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
A RM 1,893.10 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
B RM 1,625.80 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
B RM 1,683.00 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
C/D RM 1,320.00 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
C/D RM 1,398.10 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
E RM 1,010.90 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
E RM 1,070.30 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
A RM 3,452.90 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
A RM 3,652.00 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
B RM 3,069.00 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
B RM 3,247.20 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
C/D RM 2,876.50 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
C/D RM 3,043.20 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
E RM 2,206.60 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
E RM 2,334.20 m² Page 22 ↗ STRUCT CLEAN
View & Verify
5.3
.all
Other Plates (Steel)
5 PLATING
ALL — — Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
A RM 133.10 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
A RM 185.90 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
B RM 118.80 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
B RM 167.20 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
C/D RM 99.00 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
C/D RM 138.60 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
E RM 74.80 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
E RM 106.70 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
A RM 139.70 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
A RM 166.10 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
B RM 125.40 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
B RM 149.60 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
C/D RM 104.50 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
C/D RM 125.40 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
E RM 79.20 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
E RM 94.60 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.3
.all
Unequal Angle Bar (Per meter)
5 PLATING
ALL — per meter Page 24 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
A RM 136.40 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
B RM 121.00 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
C/D RM 103.40 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
E RM 78.10 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.4
.all
Catwalk and Stiffeners
5 PLATING
ALL — — Page 25 ↗ STRUCT CLEAN
View & Verify
5.4.1
.a
Catwalk (6mm thick mild steel chequered plate per m²) (Cat A)
5 PLATING
A RM 842.60 per m² Page 25 ↗ STRUCT CLEAN
View & Verify
5.4.1
.b
Catwalk (6mm thick mild steel chequered plate per m²) (Cat B)
5 PLATING
B RM 750.20 per m² Page 25 ↗ STRUCT CLEAN
View & Verify
5.4.1
.c_d
Catwalk (6mm thick mild steel chequered plate per m²) (Cat C/D)
5 PLATING
C/D RM 700.70 per m² Page 25 ↗ STRUCT CLEAN
View & Verify
5.4.1
.e
Catwalk (6mm thick mild steel chequered plate per m²) (Cat E)
5 PLATING
E RM 536.30 per m² Page 25 ↗ STRUCT CLEAN
View & Verify
5.4.2
.all
Stiffeners (Refer to Para 5.3.2)
5 PLATING
ALL — per meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.5
.all
Galvanised Mild Steel Sheet (Per m²)
5 PLATING
ALL — per m² Page 26 ↗ STRUCT CLEAN
View & Verify
6.0
.all
Temporary Staging (Per plank of 3 meters length)
6 TEMPORARY STAGING
ALL — per plank Page 26 ↗ STRUCT CLEAN
View & Verify
7.0
.all
Thickness Determination of Outside Plating (Ultrasonic Gauging)
7 THICKNESS DETERMINATION OF OUTSIDE PLATING
ALL — per point Page 26 ↗ STRUCT CLEAN
View & Verify
8.0
.all
Wood Work
8 WOOD WORK
ALL — — Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
A RM 358.40 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
B RM 319.20 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
C/D RM 295.40 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
E RM 277.20 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
A RM 303.80 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
B RM 319.20 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
C/D RM 253.40 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
E RM 236.60 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.3
.all
Deck Planking Renewal - Teak (Per meter run)
8 WOOD WORK
ALL — per meter run Page 27 ↗ STRUCT CLEAN
View & Verify
8.4
.all
Deck Planking Renewal - Cengal / Local Timber (Per meter run)
8 WOOD WORK
ALL — per meter run Page 28 ↗ STRUCT CLEAN
View & Verify
8.5
.all
Renewal of Rubbing Strake - Cengal (Per meter)
8 WOOD WORK
ALL — per meter Page 28 ↗ STRUCT CLEAN
View & Verify
8.6
.a
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat A)
8 WOOD WORK
A RM 25.20 per m² Page 28 ↗ STRUCT CLEAN
View & Verify
8.6
.b
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat B)
8 WOOD WORK
B RM 22.40 per m² Page 28 ↗ STRUCT CLEAN
View & Verify
8.6
.c_d
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat C/D)
8 WOOD WORK
C/D RM 21.00 per m² Page 28 ↗ STRUCT CLEAN
View & Verify
8.6
.e
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat E)
8 WOOD WORK
E RM 18.20 per m² Page 28 ↗ STRUCT CLEAN
View & Verify
8.7
.a
Caulking of Hull (Per meter run) (Cat A)
8 WOOD WORK
A RM 23.10 per meter run Page 28 ↗ STRUCT CLEAN
View & Verify
8.7
.b
Caulking of Hull (Per meter run) (Cat B)
8 WOOD WORK
B RM 21.56 per meter run Page 28 ↗ STRUCT CLEAN
View & Verify
8.7
.c_d
Caulking of Hull (Per meter run) (Cat C/D)
8 WOOD WORK
C/D RM 12.32 per meter run Page 28 ↗ STRUCT CLEAN
View & Verify
8.7
.e
Caulking of Hull (Per meter run) (Cat E)
8 WOOD WORK
E RM 10.78 per meter run Page 28 ↗ STRUCT CLEAN
View & Verify
8.8
.a
Caulking of Deck (Per meter) (Cat A)
8 WOOD WORK
A RM 12.32 per meter Page 29 ↗ STRUCT CLEAN
View & Verify
8.8
.b
Caulking of Deck (Per meter) (Cat B)
8 WOOD WORK
B RM 10.78 per meter Page 29 ↗ STRUCT CLEAN
View & Verify
8.8
.c_d
Caulking of Deck (Per meter) (Cat C/D)
8 WOOD WORK
C/D RM 10.78 per meter Page 29 ↗ STRUCT CLEAN
View & Verify
8.8
.e
Caulking of Deck (Per meter) (Cat E)
8 WOOD WORK
E RM 7.70 per meter Page 29 ↗ STRUCT CLEAN
View & Verify
8.9
.all
Renewal of Paneling and Planking (At any location per standard sheet)
8 WOOD WORK
ALL — per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.9.1
.all
Paneling Renewal - Marine Plywood
8 WOOD WORK
ALL — per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.9.2
.all
Paneling Renewal - Waterproof Plywood
8 WOOD WORK
ALL — per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.9.3
.a
Paneling Renewal - Formica Sheet (Cat A)
8 WOOD WORK
A RM 260.70 per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.9.3
.b
Paneling Renewal - Formica Sheet (Cat B)
8 WOOD WORK
B RM 232.10 per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.9.3
.c_d
Paneling Renewal - Formica Sheet (Cat C/D)
8 WOOD WORK
C/D RM 195.80 per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.9.3
.e
Paneling Renewal - Formica Sheet (Cat E)
8 WOOD WORK
E RM 180.40 per sheet Page 29 ↗ STRUCT CLEAN
View & Verify
8.10
.all
Deck Covering Renewal (Per m²)
8 WOOD WORK
ALL — per m² Page 30 ↗ STRUCT CLEAN
View & Verify
8.9.4
.all
Paneling Renewal - Marine Plywood (Layered with Formica Sheet)
8 WOOD WORK
ALL — per sheet Page 30 ↗ STRUCT CLEAN
View & Verify
8.9.5
.all
Paneling Renewal - Waterproof Plywood (Layered with Formica Sheet)
8 WOOD WORK
ALL — per sheet Page 30 ↗ STRUCT CLEAN
View & Verify
8.11
.all
Marine Fibreboard Insulation Renewal - Shipyard Supply (Per m²)
8 WOOD WORK
ALL — per m² Page 31 ↗ STRUCT CLEAN
View & Verify
9.0
.all
Anchor and Cables
9 ANCHOR / CABLES
ALL — — Page 31 ↗ STRUCT CLEAN
View & Verify
9.1
.all
Anchor and Cable Ranging, Survey and Cleaning (Per anchor)
9 ANCHOR / CABLES
ALL — per anchor Page 31 ↗ STRUCT CLEAN
View & Verify
10.0
.all
Sea Intake Valves (Globe, Gate and Butterfly)
10 SEA INTAKE VALVES (GLOBE, GATE AND BUTTERFLY)
ALL — per valve Page 32 ↗ STRUCT CLEAN
View & Verify
9.2
.all
Switch Ship Cable (From end to end - Per cable)
9 ANCHOR / CABLES
ALL — per cable Page 32 ↗ STRUCT CLEAN
View & Verify
9.3
.a
Test Cable (For strength including test certificate - Per shackle) (Cat A)
9 ANCHOR / CABLES
A RM 65.56 per shackle Page 32 ↗ STRUCT CLEAN
View & Verify
9.3
.b
Test Cable (For strength including test certificate - Per shackle) (Cat B)
9 ANCHOR / CABLES
B RM 58.08 per shackle Page 32 ↗ STRUCT CLEAN
View & Verify
9.3
.c_d
Test Cable (For strength including test certificate - Per shackle) (Cat C/D)
9 ANCHOR / CABLES
C/D RM 54.45 per shackle Page 32 ↗ STRUCT CLEAN
View & Verify
9.3
.e
Test Cable (For strength including test certificate - Per shackle) (Cat E)
9 ANCHOR / CABLES
E RM 41.25 per shackle Page 32 ↗ STRUCT CLEAN
View & Verify
11.0
.all
Sea Chest Gratings
11 SEA CHEST GRATINGS
ALL — per grating Page 33 ↗ STRUCT CLEAN
View & Verify
12.0
.all
Storm Valve Overhaul
12 STORM VALVE
ALL — per valve Page 34 ↗ STRUCT CLEAN
View & Verify
13.0
.all
Intermediate Valve (Hand Operated Type Includes Packing)
13 INTERMEDIATE VALVE
ALL — per valve Page 34 ↗ STRUCT CLEAN
View & Verify
14.0
.all
Pressure Relief Valve
14 PRESSURE RELIEF VALVE
ALL — — Page 35 ↗ STRUCT CLEAN
View & Verify
14.1
.all
Overhaul Pressure Relief Valve
14 PRESSURE RELIEF VALVE
ALL — per valve Page 35 ↗ STRUCT CLEAN
View & Verify
14.2
.all
Relief Valve - Test Only (Exclude steam valve)
14 PRESSURE RELIEF VALVE
ALL — per valve Page 36 ↗ STRUCT CLEAN
View & Verify
15.0
.all
Tank Inspection, Cleaning and Testing
15 TANK
ALL — — Page 36 ↗ STRUCT CLEAN
View & Verify
15.1
.all
Water Tank Cleaning and Preservation
15 TANK
ALL — per m³ Page 36 ↗ STRUCT CLEAN
View & Verify
15.2
.all
Fuel Oil / Lub Oil Tanks - Manual or steam cleaning
15 TANK
ALL — per m³ Page 36 ↗ STRUCT CLEAN
View & Verify
15.3
.a
Gas Free Tank (Per m³) (Cat A)
15 TANK
A RM 34.65 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.3
.b
Gas Free Tank (Per m³) (Cat B)
15 TANK
B RM 30.80 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.3
.c_d
Gas Free Tank (Per m³) (Cat C/D)
15 TANK
C/D RM 22.00 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.3
.e
Gas Free Tank (Per m³) (Cat E)
15 TANK
E RM 16.83 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.4
.a
Tank Pressure Testing (Per m³) (Cat A)
15 TANK
A RM 36.96 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.4
.b
Tank Pressure Testing (Per m³) (Cat B)
15 TANK
B RM 32.74 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.4
.c_d
Tank Pressure Testing (Per m³) (Cat C/D)
15 TANK
C/D RM 29.83 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.4
.e
Tank Pressure Testing (Per m³) (Cat E)
15 TANK
E RM 23.50 per m³ Page 37 ↗ STRUCT CLEAN
View & Verify
15.5
.all
Tank Manhole Cover
15 TANK
ALL — — Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.1
.a
Tank Manhole Cover - Open and Close (Per unit) (Cat A)
15 TANK
A RM 55.44 per unit Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.1
.b
Tank Manhole Cover - Open and Close (Per unit) (Cat B)
15 TANK
B RM 49.50 per unit Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.1
.c_d
Tank Manhole Cover - Open and Close (Per unit) (Cat C/D)
15 TANK
C/D RM 46.20 per unit Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.1
.e
Tank Manhole Cover - Open and Close (Per unit) (Cat E)
15 TANK
E RM 35.20 per unit Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.2
.a
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat A)
15 TANK
A RM 80.85 per cover Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.2
.b
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat B)
15 TANK
B RM 71.50 per cover Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.2
.c_d
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat C/D)
15 TANK
C/D RM 67.10 per cover Page 37 ↗ STRUCT CLEAN
View & Verify
15.5.2
.e
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat E)
15 TANK
E RM 51.15 per cover Page 37 ↗ STRUCT CLEAN
View & Verify
16.0
.all
Evaporator
16 EVAPORATOR
ALL — — Page 38 ↗ STRUCT CLEAN
View & Verify
16.1
.all
Evaporator Shell Overhaul
16 EVAPORATOR
ALL — per unit Page 38 ↗ STRUCT CLEAN
View & Verify
16.2
.a
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat A)
16 EVAPORATOR
A RM 770.00 per unit Page 38 ↗ STRUCT CLEAN
View & Verify
16.2
.b
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat B)
16 EVAPORATOR
B RM 686.40 per unit Page 38 ↗ STRUCT CLEAN
View & Verify
16.2
.c_d
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat C/D)
16 EVAPORATOR
C/D RM 642.40 per unit Page 38 ↗ STRUCT CLEAN
View & Verify
16.2
.e
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat E)
16 EVAPORATOR
E RM 489.50 per unit Page 38 ↗ STRUCT CLEAN
View & Verify
16.3
.all
Distiller Condenser Cleaning and Pressure Test (Includes supply of joints)
16 EVAPORATOR
ALL — per unit Page 39 ↗ STRUCT CLEAN
View & Verify
17.0
.a
Ventilation Grating and Flap Overhaul (Cat A)
17 VENTILATION GRATING AND FLAP
A RM 169.40 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
17.0
.b
Ventilation Grating and Flap Overhaul (Cat B)
17 VENTILATION GRATING AND FLAP
B RM 150.70 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
17.0
.c_d
Ventilation Grating and Flap Overhaul (Cat C/D)
17 VENTILATION GRATING AND FLAP
C/D RM 141.00 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
17.0
.e
Ventilation Grating and Flap Overhaul (Cat E)
17 VENTILATION GRATING AND FLAP
E RM 107.80 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
18.0
.all
Water Tight Doors, Hatches and Windows
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
ALL — — Page 39 ↗ STRUCT CLEAN
View & Verify
18.1
.all
Renewal of Rubber Seals (Government supply rubber)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
ALL — per meter run Page 39 ↗ STRUCT CLEAN
View & Verify
18.2
.a
Hose Test (Per unit) (Cat A)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
A RM 61.60 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
18.2
.b
Hose Test (Per unit) (Cat B)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
B RM 55.00 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
18.2
.c_d
Hose Test (Per unit) (Cat C/D)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
C/D RM 50.60 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
18.2
.e
Hose Test (Per unit) (Cat E)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
E RM 39.60 per unit Page 39 ↗ STRUCT CLEAN
View & Verify
18.3
.a
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat A)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
A RM 275.00 per unit Page 40 ↗ STRUCT CLEAN
View & Verify
18.3
.b
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat B)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
B RM 253.00 per unit Page 40 ↗ STRUCT CLEAN
View & Verify
18.3
.c_d
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat C/D)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
C/D RM 231.00 per unit Page 40 ↗ STRUCT CLEAN
View & Verify
18.3
.e
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat E)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS
E RM 179.30 per unit Page 40 ↗ STRUCT CLEAN
View & Verify
19.0
.all
Pipe Works
19 PIPE WORKS
ALL — — Page 40 ↗ STRUCT CLEAN
View & Verify
19.1
.all
Pipe Renewal Straight Length (Copper, Sch 40, Sch 80, Stainless)
19 PIPE WORKS
ALL — per meter Page 40 ↗ STRUCT CLEAN
View & Verify
19.2
.all
Renewal of Pipe Bends and Elbows (Hot / Cold)
19 PIPE WORKS
ALL — per bend Page 43 ↗ STRUCT CLEAN
View & Verify
19.3
.all
Renewal of T-Connection for Piping
19 PIPE WORKS
ALL — per piece Page 45 ↗ STRUCT CLEAN
View & Verify
19.4
.all
Renewal of Pipe Flanges and Union Coupling
19 PIPE WORKS
ALL — per pair Page 47 ↗ STRUCT CLEAN
View & Verify
19.5
.a
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat A)
19 PIPE WORKS
A RM 64.90 per meter run Page 47 ↗ STRUCT CLEAN
View & Verify
19.5
.b
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat B)
19 PIPE WORKS
B RM 57.20 per meter run Page 47 ↗ STRUCT CLEAN
View & Verify
19.5
.c_d
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat C/D)
19 PIPE WORKS
C/D RM 53.90 per meter run Page 47 ↗ STRUCT CLEAN
View & Verify
19.5
.e
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat E)
19 PIPE WORKS
E RM 40.70 per meter run Page 47 ↗ STRUCT CLEAN
View & Verify
19.6
.all
Pipe Pressure Testing (Hydrostatic)
19 PIPE WORKS
ALL — per test Page 47 ↗ STRUCT CLEAN
View & Verify
19.7
.a
Complete Overhaul of Sanitary Unit in Workshop (Cat A)
19 PIPE WORKS
A RM 250.80 per unit Page 48 ↗ STRUCT CLEAN
View & Verify
19.7
.b
Complete Overhaul of Sanitary Unit in Workshop (Cat B)
19 PIPE WORKS
B RM 222.20 per unit Page 48 ↗ STRUCT CLEAN
View & Verify
19.7
.c_d
Complete Overhaul of Sanitary Unit in Workshop (Cat C/D)
19 PIPE WORKS
C/D RM 209.00 per unit Page 48 ↗ STRUCT CLEAN
View & Verify
19.7
.e
Complete Overhaul of Sanitary Unit in Workshop (Cat E)
19 PIPE WORKS
E RM 158.40 per unit Page 48 ↗ STRUCT CLEAN
View & Verify
20.0
.all
Propellers (Conventional)
20 PROPELLERS (CONVENTIONAL)
ALL — — Page 48 ↗ STRUCT CLEAN
View & Verify
20.1
.all
Remove and Reinstall Fixed Propeller
20 PROPELLERS (CONVENTIONAL)
ALL — per propeller Page 48 ↗ STRUCT CLEAN
View & Verify
20.2
.all
Polish and Slight Grease Fixed Propeller
20 PROPELLERS (CONVENTIONAL)
ALL — per propeller Page 48 ↗ STRUCT CLEAN
View & Verify
20.3
.all
Static Balancing of Fixed Pitch Propeller
20 PROPELLERS (CONVENTIONAL)
ALL — per propeller Page 49 ↗ STRUCT CLEAN
View & Verify
20.4
.all
Dynamically Balancing Propeller
20 PROPELLERS (CONVENTIONAL)
ALL — per propeller Page 49 ↗ STRUCT CLEAN
View & Verify
20.5
.all
Controllable Pitch Propeller Overhaul
20 PROPELLERS (CONVENTIONAL)
ALL — per propeller Page 49 ↗ STRUCT CLEAN
View & Verify
21.0
.all
Shafting
21 SHAFTING
ALL — — Page 49 ↗ STRUCT CLEAN
View & Verify
21.1
.all
Tail Shaft Survey and Withdrawal
21 SHAFTING
ALL — per shaft Page 49 ↗ STRUCT CLEAN
View & Verify
21.2
.all
Intermediate Shaft Survey and Withdrawal
21 SHAFTING
ALL — per shaft Page 49 ↗ STRUCT CLEAN
View & Verify
21.3
.all
Checking Shaft Straightness / Alignment
21 SHAFTING
ALL — per shaft Page 50 ↗ STRUCT CLEAN
View & Verify
21.4
.all
Measurement of Plummer Block Bearing Clearances
21 SHAFTING
ALL — per bearing Page 50 ↗ STRUCT CLEAN
View & Verify
21.5
.all
Torque Test of Shaft in situ
21 SHAFTING
ALL — per shaft Page 50 ↗ STRUCT CLEAN
View & Verify
21.6
.all
Removal and Installation of Rubber / Cutlass Bearing
21 SHAFTING
ALL — per bearing Page 50 ↗ STRUCT CLEAN
View & Verify
21.7
.all
Partial Withdrawal of Tail Shaft
21 SHAFTING
ALL — per shaft Page 50 ↗ STRUCT CLEAN
View & Verify
21.10
.all
Stern Gland Mechanical / Pneumostop Seal Overhaul
21 SHAFTING
ALL — per seal Page 51 ↗ STRUCT CLEAN
View & Verify
21.11
.all
Remove and Install Hydraulics Coupling (SKF type)
21 SHAFTING
ALL — per coupling Page 51 ↗ STRUCT CLEAN
View & Verify
21.8
.all
Measurement of Stern Tube Bearing Clearances & Wear Down
21 SHAFTING
ALL — per cm diameter Page 51 ↗ STRUCT CLEAN
View & Verify
21.9
.all
Renewal of Stern Gland Packing
21 SHAFTING
ALL — per cm diameter Page 51 ↗ STRUCT CLEAN
View & Verify
22.0
.all
Rudders
22 RUDDERS
ALL — — Page 52 ↗ STRUCT CLEAN
View & Verify
22.1
.a
Measurement of Rudder Clearances in situ (Cat A)
22 RUDDERS
A RM 37.70 per stock cm Page 52 ↗ STRUCT CLEAN
View & Verify
22.1
.b
Measurement of Rudder Clearances in situ (Cat B)
22 RUDDERS
B RM 33.80 per stock cm Page 52 ↗ STRUCT CLEAN
View & Verify
22.1
.c_d
Measurement of Rudder Clearances in situ (Cat C/D)
22 RUDDERS
C/D RM 31.20 per stock cm Page 52 ↗ STRUCT CLEAN
View & Verify
22.1
.e
Measurement of Rudder Clearances in situ (Cat E)
22 RUDDERS
E RM 20.13 per stock cm Page 52 ↗ STRUCT CLEAN
View & Verify
22.2
.a
Remove and Reinstall Rudder (Cat A)
22 RUDDERS
A RM 61.48 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.2
.b
Remove and Reinstall Rudder (Cat B)
22 RUDDERS
B RM 45.76 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.2
.c_d
Remove and Reinstall Rudder (Cat C/D)
22 RUDDERS
C/D RM 41.47 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.2
.e
Remove and Reinstall Rudder (Cat E)
22 RUDDERS
E RM 31.75 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.3
.all
Remove and Reinstall Rudder Bearing
22 RUDDERS
ALL — per bearing Page 52 ↗ STRUCT CLEAN
View & Verify
22.4
.a
Rudder Housing Removed, Preserved and Reinstalled (Cat A)
22 RUDDERS
A RM 95.81 per cm ID Page 52 ↗ STRUCT CLEAN
View & Verify
22.4
.b
Rudder Housing Removed, Preserved and Reinstalled (Cat B)
22 RUDDERS
B RM 85.80 per cm ID Page 52 ↗ STRUCT CLEAN
View & Verify
22.4
.c_d
Rudder Housing Removed, Preserved and Reinstalled (Cat C/D)
22 RUDDERS
C/D RM 80.08 per cm ID Page 52 ↗ STRUCT CLEAN
View & Verify
22.4
.e
Rudder Housing Removed, Preserved and Reinstalled (Cat E)
22 RUDDERS
E RM 61.49 per cm ID Page 52 ↗ STRUCT CLEAN
View & Verify
22.5
.a
Renewal of Rudder Gland Packings (Cat A)
22 RUDDERS
A RM 31.46 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.5
.b
Renewal of Rudder Gland Packings (Cat B)
22 RUDDERS
B RM 28.60 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.5
.c_d
Renewal of Rudder Gland Packings (Cat C/D)
22 RUDDERS
C/D RM 25.74 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
22.5
.e
Renewal of Rudder Gland Packings (Cat E)
22 RUDDERS
E RM 19.59 per cm stock dia Page 52 ↗ STRUCT CLEAN
View & Verify
23.0
.a
Mud and Strum Boxes Overhaul (Cat A)
23 MUD AND STRUM BOXES
A RM 209.33 per unit Page 52 ↗ STRUCT CLEAN
View & Verify
23.0
.b
Mud and Strum Boxes Overhaul (Cat B)
23 MUD AND STRUM BOXES
B RM 186.34 per unit Page 52 ↗ STRUCT CLEAN
View & Verify
23.0
.c_d
Mud and Strum Boxes Overhaul (Cat C/D)
23 MUD AND STRUM BOXES
C/D RM 174.90 per unit Page 52 ↗ STRUCT CLEAN
View & Verify
23.0
.e
Mud and Strum Boxes Overhaul (Cat E)
23 MUD AND STRUM BOXES
E RM 133.10 per unit Page 52 ↗ STRUCT CLEAN
View & Verify
24.0
.all
Zinc Anodes
24 ZINC ANODES
ALL — — Page 52 ↗ STRUCT CLEAN
View & Verify
24.1
.all
Zinc Anodes Renewal, Survey, Remove and Renew
24 ZINC ANODES
ALL — per piece Page 52 ↗ STRUCT CLEAN
View & Verify
24.2
.all
Zinc Anodes - Shipyard Supply
24 ZINC ANODES
ALL — per piece Page 53 ↗ STRUCT CLEAN
View & Verify
25.0
.all
Pumps Overhaul (Mechanical and Electrical Driven)
25 PUMPS
ALL — per pump Page 53 ↗ STRUCT CLEAN
View & Verify
26.0
.all
Air Compressors and Bottles
26 AIR COMPRESSORS
ALL — — Page 54 ↗ STRUCT CLEAN
View & Verify
26.1
.all
Overhaul Air Compressor (Per unit)
26 AIR COMPRESSORS
ALL — per unit Page 54 ↗ STRUCT CLEAN
View & Verify
26.2
.all
Cleaned and Rumbled Air Bottles
26 AIR COMPRESSORS
ALL — per bottle Page 55 ↗ STRUCT CLEAN
View & Verify
26.3
.all
Air Bottle Pressure Testing
26 AIR COMPRESSORS
ALL — per bottle Page 55 ↗ STRUCT CLEAN
View & Verify
26.4
.all
Service Air Reducing Valve
26 AIR COMPRESSORS
ALL — per valve Page 55 ↗ STRUCT CLEAN
View & Verify
27.0
.all
Crane and Lifting Gear Load Test and Overhaul
27 CRANE AND LIFTING GEAR
ALL — per crane Page 56 ↗ STRUCT CLEAN
View & Verify
28.0
.all
Fire Fighting Systems
28 FIRE FIGHTING SYSTEMS
ALL — — Page 56 ↗ STRUCT CLEAN
View & Verify
28.1
.all
Inspect and Test Fire Bulkhead
28 FIRE FIGHTING SYSTEMS
ALL — per bulkhead Page 56 ↗ STRUCT CLEAN
View & Verify
28.2
.all
Operational Test of Fire Detection System
28 FIRE FIGHTING SYSTEMS
ALL — per compartment Page 56 ↗ STRUCT CLEAN
View & Verify
28.3
.all
Inspect and Test Automatic Spraying / Sprinkler System
28 FIRE FIGHTING SYSTEMS
ALL — per zone Page 56 ↗ STRUCT CLEAN
View & Verify
28.4
.all
Inspect and Test Fixed Fire Fighting Installation (Foam / Halon / CO2)
28 FIRE FIGHTING SYSTEMS
ALL — per system Page 57 ↗ STRUCT CLEAN
View & Verify
28.5
.all
Weight of Fixed Inert Gas / CO2 System Bottles
28 FIRE FIGHTING SYSTEMS
ALL — per bottle Page 57 ↗ STRUCT CLEAN
View & Verify
28.6
.all
Inspect and Test Hydrant and Hoses
28 FIRE FIGHTING SYSTEMS
ALL — per station Page 57 ↗ STRUCT CLEAN
View & Verify
28.7
.all
Detached from Manifold, Determine Contents of Cylinder in situ
28 FIRE FIGHTING SYSTEMS
ALL — per cylinder Page 57 ↗ STRUCT CLEAN
View & Verify
29.0
.a
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat A)
29 LIFE SAVING EQUIPMENT
A RM 520.00 per system Page 57 ↗ STRUCT CLEAN
View & Verify
29.0
.b
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat B)
29 LIFE SAVING EQUIPMENT
B RM 462.80 per system Page 57 ↗ STRUCT CLEAN
View & Verify
29.0
.c_d
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat C/D)
29 LIFE SAVING EQUIPMENT
C/D RM 416.00 per system Page 57 ↗ STRUCT CLEAN
View & Verify
29.0
.e
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat E)
29 LIFE SAVING EQUIPMENT
E RM 318.50 per system Page 57 ↗ STRUCT CLEAN
View & Verify
30.0
.all
Main and Auxiliary Engines (Internal Combustion Engines)
30 MAIN AND AUXILIARY ENGINES (INTERNAL COMBUSTION ENGINES)
ALL — per engine Page 57 ↗ STRUCT CLEAN
View & Verify
31.0
.all
Main Reduction Gear (Gear Box) Major Overhaul
31 MAIN REDUCTION GEAR (GEAR BOX)
ALL — per gearbox Page 58 ↗ STRUCT CLEAN
View & Verify
32.0
.all
Propulsion System Alignment
32 PROPULSION SYSTEM ALIGNMENT
ALL — — Page 58 ↗ STRUCT CLEAN
View & Verify
32.1
.all
Alignment Check for Main Engine to Gearbox or Gearbox to Main Engine
32 PROPULSION SYSTEM ALIGNMENT
ALL — per unit Page 58 ↗ STRUCT CLEAN
View & Verify
32.2
.all
Shaft Alignment - Check from Gearbox to Tail Shaft
32 PROPULSION SYSTEM ALIGNMENT
ALL — per shaft line Page 58 ↗ STRUCT CLEAN
View & Verify
33.0
.all
ACU and Refrigeration
33 ACU AND REFRIGERATION
ALL — — Page 59 ↗ STRUCT CLEAN
View & Verify
33.1
.all
Test and Identify Faults in Automatic Controls / Safety Devices
33 ACU AND REFRIGERATION
ALL — per point Page 59 ↗ STRUCT CLEAN
View & Verify
33.2
.all
Test HP and LP Cutouts and Recommission
33 ACU AND REFRIGERATION
ALL — per unit Page 59 ↗ STRUCT CLEAN
View & Verify
33.3
.all
Overhaul of ACU / Refrigeration Compressor
33 ACU AND REFRIGERATION
ALL — per compressor Page 59 ↗ STRUCT CLEAN
View & Verify
33.4
.all
Renewal of Insulation (Per meter run)
33 ACU AND REFRIGERATION
ALL — per meter run Page 60 ↗ STRUCT CLEAN
View & Verify
34.0
.all
Flexible Coupling Overhaul
34 FLEXIBLE COUPLING
ALL — per coupling Page 60 ↗ STRUCT CLEAN
View & Verify
35.0
.a
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat A)
35 MECHANICAL PRESSURE GAUGES
A RM 57.75 per gauge Page 61 ↗ STRUCT CLEAN
View & Verify
35.0
.b
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat B)
35 MECHANICAL PRESSURE GAUGES
B RM 54.29 per gauge Page 61 ↗ STRUCT CLEAN
View & Verify
35.0
.c_d
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat C/D)
35 MECHANICAL PRESSURE GAUGES
C/D RM 50.82 per gauge Page 61 ↗ STRUCT CLEAN
View & Verify
35.0
.e
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat E)
35 MECHANICAL PRESSURE GAUGES
E RM 50.82 per gauge Page 61 ↗ STRUCT CLEAN
View & Verify
36.0
.all
Cleaning of Bilges
36 CLEANING OF BILGES
ALL — — Page 61 ↗ STRUCT CLEAN
View & Verify
36.1
.a
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat A)
36 CLEANING OF BILGES
A RM 42.79 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.1
.b
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat B)
36 CLEANING OF BILGES
B RM 38.17 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.1
.c_d
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat C/D)
36 CLEANING OF BILGES
C/D RM 35.86 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.1
.e
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat E)
36 CLEANING OF BILGES
E RM 26.62 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.2
.a
Steam Cleaning of Bilges (Per m²) (Cat A)
36 CLEANING OF BILGES
A RM 57.75 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.2
.b
Steam Cleaning of Bilges (Per m²) (Cat B)
36 CLEANING OF BILGES
B RM 50.82 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.2
.c_d
Steam Cleaning of Bilges (Per m²) (Cat C/D)
36 CLEANING OF BILGES
C/D RM 47.36 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
36.2
.e
Steam Cleaning of Bilges (Per m²) (Cat E)
36 CLEANING OF BILGES
E RM 35.81 per m² Page 61 ↗ STRUCT CLEAN
View & Verify
37.0
.all
Electrical System
37 ELECTRICAL SYSTEM
ALL — — Page 61 ↗ STRUCT CLEAN
View & Verify
37.1
.all
Inspection and Test of Switchboard Safety Devices
37 ELECTRICAL SYSTEM
ALL — — Page 61 ↗ STRUCT CLEAN
View & Verify
37.1.1
.all
Overhaul Normal Circuit Breaker (Per piece)
37 ELECTRICAL SYSTEM
ALL — per piece Page 61 ↗ STRUCT CLEAN
View & Verify
37.1.2
.all
Overhaul Main Circuit Breaker (ACB / MCCB)
37 ELECTRICAL SYSTEM
ALL — per piece Page 62 ↗ STRUCT CLEAN
View & Verify
37.2
.all
Insulation Test of Electrical Installation
37 ELECTRICAL SYSTEM
ALL — per circuit Page 62 ↗ STRUCT CLEAN
View & Verify
37.3
.all
Meters Check, Calibrate and Test (Voltmeter, Ammeter, Frequency, Synchroscope)
37 ELECTRICAL SYSTEM
ALL — per meter Page 63 ↗ STRUCT CLEAN
View & Verify
37.4
.all
Main Switchboard Overhaul and Chemical Cleaning
37 ELECTRICAL SYSTEM
ALL — per section Page 63 ↗ STRUCT CLEAN
View & Verify
37.5
.all
Main Alternator Overhaul (3 Phase) Up to Six Poles
37 ELECTRICAL SYSTEM
ALL — per alternator Page 64 ↗ STRUCT CLEAN
View & Verify
37.6
.all
Main Alternator Single Phase Overhaul
37 ELECTRICAL SYSTEM
ALL — per alternator Page 65 ↗ STRUCT CLEAN
View & Verify
37.7
.all
Main Alternator Control Unit (Exciter / AVR)
37 ELECTRICAL SYSTEM
ALL — per unit Page 65 ↗ STRUCT CLEAN
View & Verify
37.8
.all
Converter Alternators (Motor Generator Sets)
37 ELECTRICAL SYSTEM
ALL — per unit Page 66 ↗ STRUCT CLEAN
View & Verify
37.9
.all
DC Generators Overhaul and Commutator Dressing
37 ELECTRICAL SYSTEM
ALL — per generator Page 66 ↗ STRUCT CLEAN
View & Verify
37.10
.all
AC Motors (3 Phase, Four Poles)
37 ELECTRICAL SYSTEM
ALL — per motor Page 68 ↗ STRUCT CLEAN
View & Verify
37.11
.all
AC Single Phase Motors
37 ELECTRICAL SYSTEM
ALL — per motor Page 69 ↗ STRUCT CLEAN
View & Verify
37.12
.all
DC Motors Overhaul and Rewinding
37 ELECTRICAL SYSTEM
ALL — per motor Page 69 ↗ STRUCT CLEAN
View & Verify
37.13
.all
Transformers Overhaul and Rewind
37 ELECTRICAL SYSTEM
ALL — per transformer Page 71 ↗ STRUCT CLEAN
View & Verify
37.14
.all
Starters and Controllers (Per unit)
37 ELECTRICAL SYSTEM
ALL — per unit Page 71 ↗ STRUCT CLEAN
View & Verify
37.15
.all
Main and Auxiliary Engine Warning and Control System
37 ELECTRICAL SYSTEM
ALL — per system Page 72 ↗ STRUCT CLEAN
View & Verify
38.0
.all
Navigation / Radar / Communication Equipment
38 NAVIGATION / RADAR / COMMUNICATION EQUIPMENT
ALL — per system Page 72 ↗ STRUCT CLEAN
View & Verify
39.0
.all
Exhaust Lagging (Per m²)
39 EXHAUST LAGGING
ALL — per m² Page 72 ↗ STRUCT CLEAN
View & Verify
40.0
.all
Cabling Work
40 CABLING WORK
ALL — — Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
A RM 60.06 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
A RM 114.84 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
B RM 55.00 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
B RM 102.30 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
C/D RM 50.45 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
C/D RM 96.14 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
E RM 38.83 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
E RM 72.60 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.2
.all
Renewal of Cable Trays
40 CABLING WORK
ALL — per meter run Page 74 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
A RM 38.00 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
B RM 30.00 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
C/D RM 25.00 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
E RM 18.50 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
A RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
ALL RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
B RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
C/D RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
E RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
A RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
ALL RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
B RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
C/D RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
E RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
A RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
ALL RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
B RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
C/D RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
E RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN