← Back to Dashboard

Tariff Master & Schedule of Rates

Official Government & Commercial Marine Repair Tariffs · Digitalized Authoritative Source: Jadual Kadar Untuk Kerja-Kerja Pembaikan Dan Penyelenggaraan Bot/Kapal Kerajaan 2012 (v)

SHA: 94c739f00151 75 Pages Indexed
Total Staged Items
169
Structurally Clean
167
Active Catalog Items
167
GANPS Verified
0
Review Required
1
Source Conflict
1

⚠️ Tariff Staging Exceptions Requiring Expert Review (2)

Preserved in staging without auto-promoting to active catalog
Para Description Source Page State Flags
Terms.b Cost of access work is not included in the Schedule of Rates unless specified Page 9 SOURCE_CONFLICT NON_PRICED_CONDITION
3.13 Araldite Coating (Cost plus 15% mark-up) Page 17 REVIEW_REQUIRED RATE_AS_MARKUP_PERCENTAGE,MISSING_NUMERIC_RATE

📖 Active Tariff Master Items (167)

Primary UX: FIND → COMPARE → VERIFY → USE
Para / Code Description / Specification Cat Official Rate Unit Source Verification Action
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
A RM 58.40 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
A RM 25.64 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
A RM 29.88 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
B RM 50.40 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
B RM 21.64 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
B RM 25.88 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
C/D RM 45.40 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION
C/D RM 19.14 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
C/D RM 23.38 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.a
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION
E RM 38.90 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.b
Preparation - Providing duckboards: Cardboard (Audited)
1 PREPARATION
E RM 15.89 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
1.0
.c
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION
E RM 20.13 per piece Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
A RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
B RM 1,069.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
C/D RM 159.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
C/D RM 367.90 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
C/D RM 552.50 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
C/D RM 737.10 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_up_to_5
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES
E RM 148.20 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_5_to_10
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES
E RM 348.20 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_10_to_15
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES
E RM 516.10 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.1
.slipway_15_to_20
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES
E RM 689.00 operation Page 10 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
A RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
A RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
A RM 130.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
B RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
B RM 86.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
B RM 130.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
C/D RM 66.10 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
C/D RM 72.60 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
C/D RM 96.80 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_10_to_15
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES
E RM 42.90 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_15_to_20
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES
E RM 55.00 day Page 11 ↗ STRUCT CLEAN
View & Verify
2.2
.slipway_20_to_25
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES
E RM 73.70 day Page 11 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
A RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
B RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.1
.survey
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION
E RM 0.00 lump_sum Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
A RM 4.80 Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
B RM 4.32 Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 3.96 Page 14 ↗ STRUCT CLEAN
View & Verify
3.2
.hp_cleaning
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION
E RM 3.00 Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
A RM 7.26 Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
B RM 6.60 Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 6.12 Page 14 ↗ STRUCT CLEAN
View & Verify
3.3
.scraping
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION
E RM 4.56 Page 14 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 33.00 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 52.80 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 29.28 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 52.80 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 27.72 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 49.92 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.external
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 21.12 Page 15 ↗ STRUCT CLEAN
View & Verify
3.6
.internal
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 38.04 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 79.44 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 94.56 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 70.56 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 84.48 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 65.52 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 83.16 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.external
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 50.16 Page 15 ↗ STRUCT CLEAN
View & Verify
3.7
.internal
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 63.00 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 32.76 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 39.60 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 29.04 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 34.32 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 27.12 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 32.64 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.a
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 20.64 Page 15 ↗ STRUCT CLEAN
View & Verify
3.8
.b
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 32.64 Page 15 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
A RM 3.50 Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
B RM 3.12 Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 2.80 Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.a
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION
E RM 2.20 Page 16 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
A RM 5.30 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
A RM 7.40 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
B RM 4.70 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
B RM 6.60 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 4.30 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 6.10 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.b
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION
E RM 3.40 Page 17 ↗ STRUCT CLEAN
View & Verify
3.11
.c
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION
E RM 4.70 Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
A RM 230.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
A RM 256.00 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
B RM 230.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
B RM 256.00 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 222.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
C/D RM 238.40 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.up_to_20
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION
E RM 169.60 markings Page 17 ↗ STRUCT CLEAN
View & Verify
3.12
.above_20_to_36
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION
E RM 180.80 markings Page 17 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
A RM 1,788.60 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
A RM 1,893.10 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
B RM 1,625.80 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
B RM 1,683.00 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
C/D RM 1,320.00 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
C/D RM 1,398.10 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_up_to_4mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING
E RM 1,010.90 Page 22 ↗ STRUCT CLEAN
View & Verify
5.1
.mild_steel_above_4_to_8mm
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING
E RM 1,070.30 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
A RM 3,452.90 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
A RM 3,652.00 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
B RM 3,069.00 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
B RM 3,247.20 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
C/D RM 2,876.50 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
C/D RM 3,043.20 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_up_to_4mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING
E RM 2,206.60 Page 22 ↗ STRUCT CLEAN
View & Verify
5.2
.aluminium_above_4_to_8mm
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING
E RM 2,334.20 Page 22 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
A RM 133.10 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
A RM 185.90 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
B RM 118.80 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
B RM 167.20 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
C/D RM 99.00 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
C/D RM 138.60 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.05
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING
E RM 74.80 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.1
.brackets_on_deck_below_0.1
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING
E RM 106.70 piece Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
A RM 139.70 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
A RM 166.10 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
B RM 125.40 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
B RM 149.60 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
C/D RM 104.50 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
C/D RM 125.40 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_50x50
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING
E RM 79.20 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.2
.equal_angle_on_deck_65x65
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING
E RM 94.60 meter Page 23 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
A RM 136.40 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
B RM 121.00 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
C/D RM 103.40 meter Page 25 ↗ STRUCT CLEAN
View & Verify
5.3.4
.flat_bar_on_deck_75mm
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING
E RM 78.10 meter Page 25 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
A RM 358.40 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
B RM 319.20 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
C/D RM 295.40 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.1
.teak_width_4_up_to_half_inch
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
E RM 277.20 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
A RM 303.80 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
B RM 319.20 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
C/D RM 253.40 meter Page 27 ↗ STRUCT CLEAN
View & Verify
8.2
.cengal_width_4_up_to_half_inch
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK
E RM 236.60 meter Page 27 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
A RM 60.06 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
A RM 114.84 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
B RM 55.00 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
B RM 102.30 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
C/D RM 50.45 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
C/D RM 96.14 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_1.55_to_5mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK
E RM 38.83 meter Page 74 ↗ STRUCT CLEAN
View & Verify
40.1
.cable_5_to_10mm2
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK
E RM 72.60 meter Page 74 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
A RM 38.00 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
B RM 30.00 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
C/D RM 25.00 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
41.0
.normal_hours
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS)
E RM 18.50 man-hour Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
A RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
ALL RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
B RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
C/D RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
42.0
.materials_markup
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS
E RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
A RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
ALL RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
B RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
C/D RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
43.0
.specialist_service
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS
E RM 15.00 markup_percent Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
A RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
ALL RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
B RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
C/D RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify
44.0
.floating_equipment
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT
E RM 85.00 tariff_percentage Page 75 ↗ STRUCT CLEAN
View & Verify