← Back to Dashboard
Tariff Master & Schedule of Rates
Official Government & Commercial Marine Repair Tariffs · Digitalized Authoritative Source: Jadual Kadar Untuk Kerja-Kerja Pembaikan Dan Penyelenggaraan Bot/Kapal Kerajaan 2012 (v)
SHA: 94c739f00151
75 Pages Indexed
Total Staged Items
169
Structurally Clean
167
Active Catalog Items
445
GANPS Verified
0
Review Required
1
Source Conflict
1
⚠️ Tariff Staging Exceptions Requiring Expert Review (2)
Preserved in staging without auto-promoting to active catalog| Para | Description | Source Page | State | Flags |
|---|---|---|---|---|
| Terms.b | Cost of access work is not included in the Schedule of Rates unless specified | Page 9 | SOURCE_CONFLICT | NON_PRICED_CONDITION |
| 3.13 | Araldite Coating (Cost plus 15% mark-up) | Page 17 | REVIEW_REQUIRED | RATE_AS_MARKUP_PERCENTAGE,MISSING_NUMERIC_RATE |
📖 Active Tariff Master Items (445)
Primary UX: FIND → COMPARE → VERIFY → USE
| Para / Code | Description / Specification | Cat | Official Rate | Unit | Source | Verification | Action |
|---|---|---|---|---|---|---|---|
| Terms .all |
Terms and Conditions - General Regulations
0 TERMS AND CONDITIONS |
ALL | — | Clause | Page 9 ↗ | STRUCT CLEAN | |
| Terms.b .access_work |
Cost of access work is not included in the Schedule of Rates unless specified
0 TERMS AND CONDITIONS |
ALL | — | clause | Page 9 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
A | RM 58.40 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
A | RM 25.64 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
A | RM 29.88 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
B | RM 50.40 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
B | RM 21.64 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
B | RM 25.88 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
C/D | RM 45.40 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
C/D | RM 19.14 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
C/D | RM 23.38 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
E | RM 38.90 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
E | RM 15.89 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
E | RM 20.13 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 2.0 .all |
Docking Charges
2 DOCKING CHARGES |
ALL | — | — | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
C/D | RM 159.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
C/D | RM 367.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
C/D | RM 552.50 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
C/D | RM 737.10 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
E | RM 148.20 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
E | RM 348.20 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
E | RM 516.10 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
E | RM 689.00 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
A | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
A | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
A | RM 130.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
B | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
B | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
B | RM 130.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
C/D | RM 66.10 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
C/D | RM 72.60 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
C/D | RM 96.80 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
E | RM 42.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
E | RM 55.00 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
E | RM 73.70 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.3 .all |
Tug Boat Assistance - Tug Boat Rental (Per hour per tug)
2 DOCKING CHARGES |
ALL | — | per hour | Page 12 ↗ | STRUCT CLEAN | |
| 2.4 .all |
Remove and Replace Bilge or Keel Blocks
2 DOCKING CHARGES |
ALL | — | per block | Page 12 ↗ | STRUCT CLEAN | |
| 2.5 .all |
Propeller Shaft Coupling
2 DOCKING CHARGES |
ALL | — | per coupling | Page 13 ↗ | STRUCT CLEAN | |
| 2.6 .all |
Ship Deflection Reading
2 DOCKING CHARGES |
ALL | — | per reading | Page 13 ↗ | STRUCT CLEAN | |
| 3.0 .all |
Surface Preparation and Preservation
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | — | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 4.80 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 4.32 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 3.96 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 3.00 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 7.26 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 6.60 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 6.12 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 4.56 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.4 .all |
Hydro Blasting to Standard ST 3 (Inclusive of labour and one coat primer)
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | per m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.5 .all |
Grinding (In any position to sound paint)
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | per m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 33.00 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 52.80 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 29.28 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 52.80 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 27.72 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 49.92 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 21.12 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 38.04 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 79.44 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 94.56 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 70.56 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 84.48 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 65.52 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 83.16 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 50.16 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 63.00 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 32.76 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 39.60 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 29.04 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 34.32 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 27.12 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 32.64 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 20.64 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 32.64 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.10 .all |
Grit Blasting To SA 1 (Copper grit / Garnet)
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | per m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 3.50 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 3.12 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 2.80 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 2.20 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.9 .all |
Grit Blasting To SA 2.5 (Copper grit / Garnet)
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | per m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 5.30 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 7.40 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 4.70 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 6.60 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 4.30 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 6.10 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 3.40 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 4.70 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 230.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 256.00 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 230.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 256.00 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 222.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 238.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 169.60 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 180.80 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.13 .araldite |
Araldite Coating (Cost plus 15% mark-up)
3 SURFACE PREPARATION AND PRESERVATION |
ALL | RM 15.00 | percent | Page 17 ↗ | STRUCT CLEAN | |
| 3.14 .all |
Application of Rust Converter, seal (3 layers)
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | per m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.15 .all |
Surface Preparations of GRP Painted Surfaces
3 SURFACE PREPARATION AND PRESERVATION |
ALL | — | per m² | Page 18 ↗ | STRUCT CLEAN | |
| 4.0 .all |
General Services
4 GENERAL SERVICES |
ALL | — | — | Page 18 ↗ | STRUCT CLEAN | |
| 4.1 .all |
Wharfage (Per day or part of a day)
4 GENERAL SERVICES |
ALL | — | per day | Page 18 ↗ | STRUCT CLEAN | |
| 4.2 .all |
Shore Power Supply
4 GENERAL SERVICES |
ALL | — | — | Page 19 ↗ | STRUCT CLEAN | |
| 4.2.1 .all |
Shore Power Supply - 415V, 3 Phase, 50Hz
4 GENERAL SERVICES |
ALL | — | per kWh | Page 19 ↗ | STRUCT CLEAN | |
| 4.2.2 .all |
Shore Power Supply - 440V, 3 Phase, 60Hz
4 GENERAL SERVICES |
ALL | — | per kWh | Page 19 ↗ | STRUCT CLEAN | |
| 4.2.3 .a |
Shore Supply Connection and Disconnection (Cat A)
4 GENERAL SERVICES |
A | RM 148.50 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.2.3 .b |
Shore Supply Connection and Disconnection (Cat B)
4 GENERAL SERVICES |
B | RM 132.00 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.2.3 .c_d |
Shore Supply Connection and Disconnection (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 123.20 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.2.3 .e |
Shore Supply Connection and Disconnection (Cat E)
4 GENERAL SERVICES |
E | RM 102.30 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.3 .all |
Water
4 GENERAL SERVICES |
ALL | — | — | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.1 .all |
Fresh Water
4 GENERAL SERVICES |
ALL | — | per ton | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.2 .a |
Sea Water (Cat A)
4 GENERAL SERVICES |
A | RM 0.48 | per ton | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.2 .b |
Sea Water (Cat B)
4 GENERAL SERVICES |
B | RM 0.48 | per ton | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.2 .c_d |
Sea Water (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 0.48 | per ton | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.2 .e |
Sea Water (Cat E)
4 GENERAL SERVICES |
E | RM 0.48 | per ton | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.3 .a |
Water Connection and Disconnection (Cat A)
4 GENERAL SERVICES |
A | RM 108.00 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.3 .b |
Water Connection and Disconnection (Cat B)
4 GENERAL SERVICES |
B | RM 108.00 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.3 .c_d |
Water Connection and Disconnection (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 96.00 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.3 .e |
Water Connection and Disconnection (Cat E)
4 GENERAL SERVICES |
E | RM 78.00 | per connection | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.4 .a |
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat A)
4 GENERAL SERVICES |
A | RM 21.60 | per day | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.4 .b |
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat B)
4 GENERAL SERVICES |
B | RM 21.60 | per day | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.4 .c_d |
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 21.60 | per day | Page 19 ↗ | STRUCT CLEAN | |
| 4.3.4 .e |
Cooling Sea Water per line for air conditioning, refrigeration & firemain (Cat E)
4 GENERAL SERVICES |
E | RM 21.60 | per day | Page 19 ↗ | STRUCT CLEAN | |
| 4.4 .all |
Compressed Air
4 GENERAL SERVICES |
ALL | — | — | Page 20 ↗ | STRUCT CLEAN | |
| 4.4.1 .all |
Compressed Air Supply
4 GENERAL SERVICES |
ALL | — | per day | Page 20 ↗ | STRUCT CLEAN | |
| 4.4.2 .a |
Compressed Air Connection and Disconnection (Cat A)
4 GENERAL SERVICES |
A | RM 49.50 | per connection | Page 20 ↗ | STRUCT CLEAN | |
| 4.4.2 .b |
Compressed Air Connection and Disconnection (Cat B)
4 GENERAL SERVICES |
B | RM 44.00 | per connection | Page 20 ↗ | STRUCT CLEAN | |
| 4.4.2 .c_d |
Compressed Air Connection and Disconnection (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 41.14 | per connection | Page 20 ↗ | STRUCT CLEAN | |
| 4.4.2 .e |
Compressed Air Connection and Disconnection (Cat E)
4 GENERAL SERVICES |
E | RM 31.90 | per connection | Page 20 ↗ | STRUCT CLEAN | |
| 4.5 .all |
Onboard Fire Precaution and Security
4 GENERAL SERVICES |
ALL | — | — | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.1 .a |
Fire Sentry (Per man per hour) (Cat A)
4 GENERAL SERVICES |
A | RM 70.00 | per man hour | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.1 .b |
Fire Sentry (Per man per hour) (Cat B)
4 GENERAL SERVICES |
B | RM 62.00 | per man hour | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.1 .c_d |
Fire Sentry (Per man per hour) (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 58.00 | per man hour | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.1 .e |
Fire Sentry (Per man per hour) (Cat E)
4 GENERAL SERVICES |
E | RM 44.40 | per man hour | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.2 .a |
Gas Free Inspection (Per compartment) (Cat A)
4 GENERAL SERVICES |
A | RM 116.60 | per compartment | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.2 .b |
Gas Free Inspection (Per compartment) (Cat B)
4 GENERAL SERVICES |
B | RM 104.50 | per compartment | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.2 .c_d |
Gas Free Inspection (Per compartment) (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 97.90 | per compartment | Page 20 ↗ | STRUCT CLEAN | |
| 4.5.2 .e |
Gas Free Inspection (Per compartment) (Cat E)
4 GENERAL SERVICES |
E | RM 74.80 | per compartment | Page 20 ↗ | STRUCT CLEAN | |
| 4.6 .a |
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat A)
4 GENERAL SERVICES |
A | RM 19.80 | per day | Page 20 ↗ | STRUCT CLEAN | |
| 4.6 .b |
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat B)
4 GENERAL SERVICES |
B | RM 17.60 | per day | Page 20 ↗ | STRUCT CLEAN | |
| 4.6 .c_d |
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat C/D)
4 GENERAL SERVICES |
C/D | RM 16.39 | per day | Page 20 ↗ | STRUCT CLEAN | |
| 4.6 .e |
Onboard Garbage Disposal (Collected from vessel by Shipyard) (Cat E)
4 GENERAL SERVICES |
E | RM 12.54 | per day | Page 20 ↗ | STRUCT CLEAN | |
| 4.7 .all |
Cranes (Per hour - When requested)
4 GENERAL SERVICES |
ALL | — | per hour | Page 21 ↗ | STRUCT CLEAN | |
| 4.7.1 .all |
Shipyard Crane (Per hour - When requested)
4 GENERAL SERVICES |
ALL | — | per hour | Page 21 ↗ | STRUCT CLEAN | |
| 4.7.2 .all |
Mobile Cranes (Per hour - When requested)
4 GENERAL SERVICES |
ALL | — | per hour | Page 21 ↗ | STRUCT CLEAN | |
| 4.8 .all |
Transport in Country
4 GENERAL SERVICES |
ALL | — | per trip | Page 21 ↗ | STRUCT CLEAN | |
| 4.9 .all |
Split Unit Air Conditioning Hire (Per unit per day upon request)
4 GENERAL SERVICES |
ALL | — | per unit per day | Page 21 ↗ | STRUCT CLEAN | |
| 5.0 .all |
Plating
5 PLATING |
ALL | — | — | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
A | RM 1,788.60 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
A | RM 1,893.10 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
B | RM 1,625.80 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
B | RM 1,683.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
C/D | RM 1,320.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
C/D | RM 1,398.10 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
E | RM 1,010.90 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
E | RM 1,070.30 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
A | RM 3,452.90 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
A | RM 3,652.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
B | RM 3,069.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
B | RM 3,247.20 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
C/D | RM 2,876.50 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
C/D | RM 3,043.20 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
E | RM 2,206.60 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
E | RM 2,334.20 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.3 .all |
Other Plates (Steel)
5 PLATING |
ALL | — | — | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
A | RM 133.10 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
A | RM 185.90 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
B | RM 118.80 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
B | RM 167.20 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
C/D | RM 99.00 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
C/D | RM 138.60 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
E | RM 74.80 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
E | RM 106.70 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
A | RM 139.70 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
A | RM 166.10 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
B | RM 125.40 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
B | RM 149.60 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
C/D | RM 104.50 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
C/D | RM 125.40 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
E | RM 79.20 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
E | RM 94.60 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.3 .all |
Unequal Angle Bar (Per meter)
5 PLATING |
ALL | — | per meter | Page 24 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
A | RM 136.40 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
B | RM 121.00 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
C/D | RM 103.40 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
E | RM 78.10 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.4 .all |
Catwalk and Stiffeners
5 PLATING |
ALL | — | — | Page 25 ↗ | STRUCT CLEAN | |
| 5.4.1 .a |
Catwalk (6mm thick mild steel chequered plate per m²) (Cat A)
5 PLATING |
A | RM 842.60 | per m² | Page 25 ↗ | STRUCT CLEAN | |
| 5.4.1 .b |
Catwalk (6mm thick mild steel chequered plate per m²) (Cat B)
5 PLATING |
B | RM 750.20 | per m² | Page 25 ↗ | STRUCT CLEAN | |
| 5.4.1 .c_d |
Catwalk (6mm thick mild steel chequered plate per m²) (Cat C/D)
5 PLATING |
C/D | RM 700.70 | per m² | Page 25 ↗ | STRUCT CLEAN | |
| 5.4.1 .e |
Catwalk (6mm thick mild steel chequered plate per m²) (Cat E)
5 PLATING |
E | RM 536.30 | per m² | Page 25 ↗ | STRUCT CLEAN | |
| 5.4.2 .all |
Stiffeners (Refer to Para 5.3.2)
5 PLATING |
ALL | — | per meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.5 .all |
Galvanised Mild Steel Sheet (Per m²)
5 PLATING |
ALL | — | per m² | Page 26 ↗ | STRUCT CLEAN | |
| 6.0 .all |
Temporary Staging (Per plank of 3 meters length)
6 TEMPORARY STAGING |
ALL | — | per plank | Page 26 ↗ | STRUCT CLEAN | |
| 7.0 .all |
Thickness Determination of Outside Plating (Ultrasonic Gauging)
7 THICKNESS DETERMINATION OF OUTSIDE PLATING |
ALL | — | per point | Page 26 ↗ | STRUCT CLEAN | |
| 8.0 .all |
Wood Work
8 WOOD WORK |
ALL | — | — | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
A | RM 358.40 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
B | RM 319.20 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
C/D | RM 295.40 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
E | RM 277.20 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
A | RM 303.80 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
B | RM 319.20 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
C/D | RM 253.40 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
E | RM 236.60 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.3 .all |
Deck Planking Renewal - Teak (Per meter run)
8 WOOD WORK |
ALL | — | per meter run | Page 27 ↗ | STRUCT CLEAN | |
| 8.4 .all |
Deck Planking Renewal - Cengal / Local Timber (Per meter run)
8 WOOD WORK |
ALL | — | per meter run | Page 28 ↗ | STRUCT CLEAN | |
| 8.5 .all |
Renewal of Rubbing Strake - Cengal (Per meter)
8 WOOD WORK |
ALL | — | per meter | Page 28 ↗ | STRUCT CLEAN | |
| 8.6 .a |
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat A)
8 WOOD WORK |
A | RM 25.20 | per m² | Page 28 ↗ | STRUCT CLEAN | |
| 8.6 .b |
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat B)
8 WOOD WORK |
B | RM 22.40 | per m² | Page 28 ↗ | STRUCT CLEAN | |
| 8.6 .c_d |
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat C/D)
8 WOOD WORK |
C/D | RM 21.00 | per m² | Page 28 ↗ | STRUCT CLEAN | |
| 8.6 .e |
Burning / Grinding of Hull to Bare Wood (Per m²) (Cat E)
8 WOOD WORK |
E | RM 18.20 | per m² | Page 28 ↗ | STRUCT CLEAN | |
| 8.7 .a |
Caulking of Hull (Per meter run) (Cat A)
8 WOOD WORK |
A | RM 23.10 | per meter run | Page 28 ↗ | STRUCT CLEAN | |
| 8.7 .b |
Caulking of Hull (Per meter run) (Cat B)
8 WOOD WORK |
B | RM 21.56 | per meter run | Page 28 ↗ | STRUCT CLEAN | |
| 8.7 .c_d |
Caulking of Hull (Per meter run) (Cat C/D)
8 WOOD WORK |
C/D | RM 12.32 | per meter run | Page 28 ↗ | STRUCT CLEAN | |
| 8.7 .e |
Caulking of Hull (Per meter run) (Cat E)
8 WOOD WORK |
E | RM 10.78 | per meter run | Page 28 ↗ | STRUCT CLEAN | |
| 8.8 .a |
Caulking of Deck (Per meter) (Cat A)
8 WOOD WORK |
A | RM 12.32 | per meter | Page 29 ↗ | STRUCT CLEAN | |
| 8.8 .b |
Caulking of Deck (Per meter) (Cat B)
8 WOOD WORK |
B | RM 10.78 | per meter | Page 29 ↗ | STRUCT CLEAN | |
| 8.8 .c_d |
Caulking of Deck (Per meter) (Cat C/D)
8 WOOD WORK |
C/D | RM 10.78 | per meter | Page 29 ↗ | STRUCT CLEAN | |
| 8.8 .e |
Caulking of Deck (Per meter) (Cat E)
8 WOOD WORK |
E | RM 7.70 | per meter | Page 29 ↗ | STRUCT CLEAN | |
| 8.9 .all |
Renewal of Paneling and Planking (At any location per standard sheet)
8 WOOD WORK |
ALL | — | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.9.1 .all |
Paneling Renewal - Marine Plywood
8 WOOD WORK |
ALL | — | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.9.2 .all |
Paneling Renewal - Waterproof Plywood
8 WOOD WORK |
ALL | — | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.9.3 .a |
Paneling Renewal - Formica Sheet (Cat A)
8 WOOD WORK |
A | RM 260.70 | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.9.3 .b |
Paneling Renewal - Formica Sheet (Cat B)
8 WOOD WORK |
B | RM 232.10 | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.9.3 .c_d |
Paneling Renewal - Formica Sheet (Cat C/D)
8 WOOD WORK |
C/D | RM 195.80 | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.9.3 .e |
Paneling Renewal - Formica Sheet (Cat E)
8 WOOD WORK |
E | RM 180.40 | per sheet | Page 29 ↗ | STRUCT CLEAN | |
| 8.10 .all |
Deck Covering Renewal (Per m²)
8 WOOD WORK |
ALL | — | per m² | Page 30 ↗ | STRUCT CLEAN | |
| 8.9.4 .all |
Paneling Renewal - Marine Plywood (Layered with Formica Sheet)
8 WOOD WORK |
ALL | — | per sheet | Page 30 ↗ | STRUCT CLEAN | |
| 8.9.5 .all |
Paneling Renewal - Waterproof Plywood (Layered with Formica Sheet)
8 WOOD WORK |
ALL | — | per sheet | Page 30 ↗ | STRUCT CLEAN | |
| 8.11 .all |
Marine Fibreboard Insulation Renewal - Shipyard Supply (Per m²)
8 WOOD WORK |
ALL | — | per m² | Page 31 ↗ | STRUCT CLEAN | |
| 9.0 .all |
Anchor and Cables
9 ANCHOR / CABLES |
ALL | — | — | Page 31 ↗ | STRUCT CLEAN | |
| 9.1 .all |
Anchor and Cable Ranging, Survey and Cleaning (Per anchor)
9 ANCHOR / CABLES |
ALL | — | per anchor | Page 31 ↗ | STRUCT CLEAN | |
| 10.0 .all |
Sea Intake Valves (Globe, Gate and Butterfly)
10 SEA INTAKE VALVES (GLOBE, GATE AND BUTTERFLY) |
ALL | — | per valve | Page 32 ↗ | STRUCT CLEAN | |
| 9.2 .all |
Switch Ship Cable (From end to end - Per cable)
9 ANCHOR / CABLES |
ALL | — | per cable | Page 32 ↗ | STRUCT CLEAN | |
| 9.3 .a |
Test Cable (For strength including test certificate - Per shackle) (Cat A)
9 ANCHOR / CABLES |
A | RM 65.56 | per shackle | Page 32 ↗ | STRUCT CLEAN | |
| 9.3 .b |
Test Cable (For strength including test certificate - Per shackle) (Cat B)
9 ANCHOR / CABLES |
B | RM 58.08 | per shackle | Page 32 ↗ | STRUCT CLEAN | |
| 9.3 .c_d |
Test Cable (For strength including test certificate - Per shackle) (Cat C/D)
9 ANCHOR / CABLES |
C/D | RM 54.45 | per shackle | Page 32 ↗ | STRUCT CLEAN | |
| 9.3 .e |
Test Cable (For strength including test certificate - Per shackle) (Cat E)
9 ANCHOR / CABLES |
E | RM 41.25 | per shackle | Page 32 ↗ | STRUCT CLEAN | |
| 11.0 .all |
Sea Chest Gratings
11 SEA CHEST GRATINGS |
ALL | — | per grating | Page 33 ↗ | STRUCT CLEAN | |
| 12.0 .all |
Storm Valve Overhaul
12 STORM VALVE |
ALL | — | per valve | Page 34 ↗ | STRUCT CLEAN | |
| 13.0 .all |
Intermediate Valve (Hand Operated Type Includes Packing)
13 INTERMEDIATE VALVE |
ALL | — | per valve | Page 34 ↗ | STRUCT CLEAN | |
| 14.0 .all |
Pressure Relief Valve
14 PRESSURE RELIEF VALVE |
ALL | — | — | Page 35 ↗ | STRUCT CLEAN | |
| 14.1 .all |
Overhaul Pressure Relief Valve
14 PRESSURE RELIEF VALVE |
ALL | — | per valve | Page 35 ↗ | STRUCT CLEAN | |
| 14.2 .all |
Relief Valve - Test Only (Exclude steam valve)
14 PRESSURE RELIEF VALVE |
ALL | — | per valve | Page 36 ↗ | STRUCT CLEAN | |
| 15.0 .all |
Tank Inspection, Cleaning and Testing
15 TANK |
ALL | — | — | Page 36 ↗ | STRUCT CLEAN | |
| 15.1 .all |
Water Tank Cleaning and Preservation
15 TANK |
ALL | — | per m³ | Page 36 ↗ | STRUCT CLEAN | |
| 15.2 .all |
Fuel Oil / Lub Oil Tanks - Manual or steam cleaning
15 TANK |
ALL | — | per m³ | Page 36 ↗ | STRUCT CLEAN | |
| 15.3 .a |
Gas Free Tank (Per m³) (Cat A)
15 TANK |
A | RM 34.65 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.3 .b |
Gas Free Tank (Per m³) (Cat B)
15 TANK |
B | RM 30.80 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.3 .c_d |
Gas Free Tank (Per m³) (Cat C/D)
15 TANK |
C/D | RM 22.00 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.3 .e |
Gas Free Tank (Per m³) (Cat E)
15 TANK |
E | RM 16.83 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.4 .a |
Tank Pressure Testing (Per m³) (Cat A)
15 TANK |
A | RM 36.96 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.4 .b |
Tank Pressure Testing (Per m³) (Cat B)
15 TANK |
B | RM 32.74 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.4 .c_d |
Tank Pressure Testing (Per m³) (Cat C/D)
15 TANK |
C/D | RM 29.83 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.4 .e |
Tank Pressure Testing (Per m³) (Cat E)
15 TANK |
E | RM 23.50 | per m³ | Page 37 ↗ | STRUCT CLEAN | |
| 15.5 .all |
Tank Manhole Cover
15 TANK |
ALL | — | — | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.1 .a |
Tank Manhole Cover - Open and Close (Per unit) (Cat A)
15 TANK |
A | RM 55.44 | per unit | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.1 .b |
Tank Manhole Cover - Open and Close (Per unit) (Cat B)
15 TANK |
B | RM 49.50 | per unit | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.1 .c_d |
Tank Manhole Cover - Open and Close (Per unit) (Cat C/D)
15 TANK |
C/D | RM 46.20 | per unit | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.1 .e |
Tank Manhole Cover - Open and Close (Per unit) (Cat E)
15 TANK |
E | RM 35.20 | per unit | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.2 .a |
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat A)
15 TANK |
A | RM 80.85 | per cover | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.2 .b |
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat B)
15 TANK |
B | RM 71.50 | per cover | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.2 .c_d |
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat C/D)
15 TANK |
C/D | RM 67.10 | per cover | Page 37 ↗ | STRUCT CLEAN | |
| 15.5.2 .e |
Tank Manhole Cover - Renewal of Neoprene Packing (Inclusive Packing) (Cat E)
15 TANK |
E | RM 51.15 | per cover | Page 37 ↗ | STRUCT CLEAN | |
| 16.0 .all |
Evaporator
16 EVAPORATOR |
ALL | — | — | Page 38 ↗ | STRUCT CLEAN | |
| 16.1 .all |
Evaporator Shell Overhaul
16 EVAPORATOR |
ALL | — | per unit | Page 38 ↗ | STRUCT CLEAN | |
| 16.2 .a |
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat A)
16 EVAPORATOR |
A | RM 770.00 | per unit | Page 38 ↗ | STRUCT CLEAN | |
| 16.2 .b |
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat B)
16 EVAPORATOR |
B | RM 686.40 | per unit | Page 38 ↗ | STRUCT CLEAN | |
| 16.2 .c_d |
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat C/D)
16 EVAPORATOR |
C/D | RM 642.40 | per unit | Page 38 ↗ | STRUCT CLEAN | |
| 16.2 .e |
Overhaul Air and Brine Ejector (Includes supply of joints) (Cat E)
16 EVAPORATOR |
E | RM 489.50 | per unit | Page 38 ↗ | STRUCT CLEAN | |
| 16.3 .all |
Distiller Condenser Cleaning and Pressure Test (Includes supply of joints)
16 EVAPORATOR |
ALL | — | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 17.0 .a |
Ventilation Grating and Flap Overhaul (Cat A)
17 VENTILATION GRATING AND FLAP |
A | RM 169.40 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 17.0 .b |
Ventilation Grating and Flap Overhaul (Cat B)
17 VENTILATION GRATING AND FLAP |
B | RM 150.70 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 17.0 .c_d |
Ventilation Grating and Flap Overhaul (Cat C/D)
17 VENTILATION GRATING AND FLAP |
C/D | RM 141.00 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 17.0 .e |
Ventilation Grating and Flap Overhaul (Cat E)
17 VENTILATION GRATING AND FLAP |
E | RM 107.80 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 18.0 .all |
Water Tight Doors, Hatches and Windows
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
ALL | — | — | Page 39 ↗ | STRUCT CLEAN | |
| 18.1 .all |
Renewal of Rubber Seals (Government supply rubber)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
ALL | — | per meter run | Page 39 ↗ | STRUCT CLEAN | |
| 18.2 .a |
Hose Test (Per unit) (Cat A)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
A | RM 61.60 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 18.2 .b |
Hose Test (Per unit) (Cat B)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
B | RM 55.00 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 18.2 .c_d |
Hose Test (Per unit) (Cat C/D)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
C/D | RM 50.60 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 18.2 .e |
Hose Test (Per unit) (Cat E)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
E | RM 39.60 | per unit | Page 39 ↗ | STRUCT CLEAN | |
| 18.3 .a |
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat A)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
A | RM 275.00 | per unit | Page 40 ↗ | STRUCT CLEAN | |
| 18.3 .b |
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat B)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
B | RM 253.00 | per unit | Page 40 ↗ | STRUCT CLEAN | |
| 18.3 .c_d |
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat C/D)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
C/D | RM 231.00 | per unit | Page 40 ↗ | STRUCT CLEAN | |
| 18.3 .e |
Hose / Chalk Test for Cargo Hatch (Per unit) (Cat E)
18 WATER TIGHT DOORS, HATCHES AND WINDOWS |
E | RM 179.30 | per unit | Page 40 ↗ | STRUCT CLEAN | |
| 19.0 .all |
Pipe Works
19 PIPE WORKS |
ALL | — | — | Page 40 ↗ | STRUCT CLEAN | |
| 19.1 .all |
Pipe Renewal Straight Length (Copper, Sch 40, Sch 80, Stainless)
19 PIPE WORKS |
ALL | — | per meter | Page 40 ↗ | STRUCT CLEAN | |
| 19.2 .all |
Renewal of Pipe Bends and Elbows (Hot / Cold)
19 PIPE WORKS |
ALL | — | per bend | Page 43 ↗ | STRUCT CLEAN | |
| 19.3 .all |
Renewal of T-Connection for Piping
19 PIPE WORKS |
ALL | — | per piece | Page 45 ↗ | STRUCT CLEAN | |
| 19.4 .all |
Renewal of Pipe Flanges and Union Coupling
19 PIPE WORKS |
ALL | — | per pair | Page 47 ↗ | STRUCT CLEAN | |
| 19.5 .a |
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat A)
19 PIPE WORKS |
A | RM 64.90 | per meter run | Page 47 ↗ | STRUCT CLEAN | |
| 19.5 .b |
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat B)
19 PIPE WORKS |
B | RM 57.20 | per meter run | Page 47 ↗ | STRUCT CLEAN | |
| 19.5 .c_d |
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat C/D)
19 PIPE WORKS |
C/D | RM 53.90 | per meter run | Page 47 ↗ | STRUCT CLEAN | |
| 19.5 .e |
Soil Pipes - Stripped down, cleaned, chemically treated & reinstalled (Cat E)
19 PIPE WORKS |
E | RM 40.70 | per meter run | Page 47 ↗ | STRUCT CLEAN | |
| 19.6 .all |
Pipe Pressure Testing (Hydrostatic)
19 PIPE WORKS |
ALL | — | per test | Page 47 ↗ | STRUCT CLEAN | |
| 19.7 .a |
Complete Overhaul of Sanitary Unit in Workshop (Cat A)
19 PIPE WORKS |
A | RM 250.80 | per unit | Page 48 ↗ | STRUCT CLEAN | |
| 19.7 .b |
Complete Overhaul of Sanitary Unit in Workshop (Cat B)
19 PIPE WORKS |
B | RM 222.20 | per unit | Page 48 ↗ | STRUCT CLEAN | |
| 19.7 .c_d |
Complete Overhaul of Sanitary Unit in Workshop (Cat C/D)
19 PIPE WORKS |
C/D | RM 209.00 | per unit | Page 48 ↗ | STRUCT CLEAN | |
| 19.7 .e |
Complete Overhaul of Sanitary Unit in Workshop (Cat E)
19 PIPE WORKS |
E | RM 158.40 | per unit | Page 48 ↗ | STRUCT CLEAN | |
| 20.0 .all |
Propellers (Conventional)
20 PROPELLERS (CONVENTIONAL) |
ALL | — | — | Page 48 ↗ | STRUCT CLEAN | |
| 20.1 .all |
Remove and Reinstall Fixed Propeller
20 PROPELLERS (CONVENTIONAL) |
ALL | — | per propeller | Page 48 ↗ | STRUCT CLEAN | |
| 20.2 .all |
Polish and Slight Grease Fixed Propeller
20 PROPELLERS (CONVENTIONAL) |
ALL | — | per propeller | Page 48 ↗ | STRUCT CLEAN | |
| 20.3 .all |
Static Balancing of Fixed Pitch Propeller
20 PROPELLERS (CONVENTIONAL) |
ALL | — | per propeller | Page 49 ↗ | STRUCT CLEAN | |
| 20.4 .all |
Dynamically Balancing Propeller
20 PROPELLERS (CONVENTIONAL) |
ALL | — | per propeller | Page 49 ↗ | STRUCT CLEAN | |
| 20.5 .all |
Controllable Pitch Propeller Overhaul
20 PROPELLERS (CONVENTIONAL) |
ALL | — | per propeller | Page 49 ↗ | STRUCT CLEAN | |
| 21.0 .all |
Shafting
21 SHAFTING |
ALL | — | — | Page 49 ↗ | STRUCT CLEAN | |
| 21.1 .all |
Tail Shaft Survey and Withdrawal
21 SHAFTING |
ALL | — | per shaft | Page 49 ↗ | STRUCT CLEAN | |
| 21.2 .all |
Intermediate Shaft Survey and Withdrawal
21 SHAFTING |
ALL | — | per shaft | Page 49 ↗ | STRUCT CLEAN | |
| 21.3 .all |
Checking Shaft Straightness / Alignment
21 SHAFTING |
ALL | — | per shaft | Page 50 ↗ | STRUCT CLEAN | |
| 21.4 .all |
Measurement of Plummer Block Bearing Clearances
21 SHAFTING |
ALL | — | per bearing | Page 50 ↗ | STRUCT CLEAN | |
| 21.5 .all |
Torque Test of Shaft in situ
21 SHAFTING |
ALL | — | per shaft | Page 50 ↗ | STRUCT CLEAN | |
| 21.6 .all |
Removal and Installation of Rubber / Cutlass Bearing
21 SHAFTING |
ALL | — | per bearing | Page 50 ↗ | STRUCT CLEAN | |
| 21.7 .all |
Partial Withdrawal of Tail Shaft
21 SHAFTING |
ALL | — | per shaft | Page 50 ↗ | STRUCT CLEAN | |
| 21.10 .all |
Stern Gland Mechanical / Pneumostop Seal Overhaul
21 SHAFTING |
ALL | — | per seal | Page 51 ↗ | STRUCT CLEAN | |
| 21.11 .all |
Remove and Install Hydraulics Coupling (SKF type)
21 SHAFTING |
ALL | — | per coupling | Page 51 ↗ | STRUCT CLEAN | |
| 21.8 .all |
Measurement of Stern Tube Bearing Clearances & Wear Down
21 SHAFTING |
ALL | — | per cm diameter | Page 51 ↗ | STRUCT CLEAN | |
| 21.9 .all |
Renewal of Stern Gland Packing
21 SHAFTING |
ALL | — | per cm diameter | Page 51 ↗ | STRUCT CLEAN | |
| 22.0 .all |
Rudders
22 RUDDERS |
ALL | — | — | Page 52 ↗ | STRUCT CLEAN | |
| 22.1 .a |
Measurement of Rudder Clearances in situ (Cat A)
22 RUDDERS |
A | RM 37.70 | per stock cm | Page 52 ↗ | STRUCT CLEAN | |
| 22.1 .b |
Measurement of Rudder Clearances in situ (Cat B)
22 RUDDERS |
B | RM 33.80 | per stock cm | Page 52 ↗ | STRUCT CLEAN | |
| 22.1 .c_d |
Measurement of Rudder Clearances in situ (Cat C/D)
22 RUDDERS |
C/D | RM 31.20 | per stock cm | Page 52 ↗ | STRUCT CLEAN | |
| 22.1 .e |
Measurement of Rudder Clearances in situ (Cat E)
22 RUDDERS |
E | RM 20.13 | per stock cm | Page 52 ↗ | STRUCT CLEAN | |
| 22.2 .a |
Remove and Reinstall Rudder (Cat A)
22 RUDDERS |
A | RM 61.48 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.2 .b |
Remove and Reinstall Rudder (Cat B)
22 RUDDERS |
B | RM 45.76 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.2 .c_d |
Remove and Reinstall Rudder (Cat C/D)
22 RUDDERS |
C/D | RM 41.47 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.2 .e |
Remove and Reinstall Rudder (Cat E)
22 RUDDERS |
E | RM 31.75 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.3 .all |
Remove and Reinstall Rudder Bearing
22 RUDDERS |
ALL | — | per bearing | Page 52 ↗ | STRUCT CLEAN | |
| 22.4 .a |
Rudder Housing Removed, Preserved and Reinstalled (Cat A)
22 RUDDERS |
A | RM 95.81 | per cm ID | Page 52 ↗ | STRUCT CLEAN | |
| 22.4 .b |
Rudder Housing Removed, Preserved and Reinstalled (Cat B)
22 RUDDERS |
B | RM 85.80 | per cm ID | Page 52 ↗ | STRUCT CLEAN | |
| 22.4 .c_d |
Rudder Housing Removed, Preserved and Reinstalled (Cat C/D)
22 RUDDERS |
C/D | RM 80.08 | per cm ID | Page 52 ↗ | STRUCT CLEAN | |
| 22.4 .e |
Rudder Housing Removed, Preserved and Reinstalled (Cat E)
22 RUDDERS |
E | RM 61.49 | per cm ID | Page 52 ↗ | STRUCT CLEAN | |
| 22.5 .a |
Renewal of Rudder Gland Packings (Cat A)
22 RUDDERS |
A | RM 31.46 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.5 .b |
Renewal of Rudder Gland Packings (Cat B)
22 RUDDERS |
B | RM 28.60 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.5 .c_d |
Renewal of Rudder Gland Packings (Cat C/D)
22 RUDDERS |
C/D | RM 25.74 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 22.5 .e |
Renewal of Rudder Gland Packings (Cat E)
22 RUDDERS |
E | RM 19.59 | per cm stock dia | Page 52 ↗ | STRUCT CLEAN | |
| 23.0 .a |
Mud and Strum Boxes Overhaul (Cat A)
23 MUD AND STRUM BOXES |
A | RM 209.33 | per unit | Page 52 ↗ | STRUCT CLEAN | |
| 23.0 .b |
Mud and Strum Boxes Overhaul (Cat B)
23 MUD AND STRUM BOXES |
B | RM 186.34 | per unit | Page 52 ↗ | STRUCT CLEAN | |
| 23.0 .c_d |
Mud and Strum Boxes Overhaul (Cat C/D)
23 MUD AND STRUM BOXES |
C/D | RM 174.90 | per unit | Page 52 ↗ | STRUCT CLEAN | |
| 23.0 .e |
Mud and Strum Boxes Overhaul (Cat E)
23 MUD AND STRUM BOXES |
E | RM 133.10 | per unit | Page 52 ↗ | STRUCT CLEAN | |
| 24.0 .all |
Zinc Anodes
24 ZINC ANODES |
ALL | — | — | Page 52 ↗ | STRUCT CLEAN | |
| 24.1 .all |
Zinc Anodes Renewal, Survey, Remove and Renew
24 ZINC ANODES |
ALL | — | per piece | Page 52 ↗ | STRUCT CLEAN | |
| 24.2 .all |
Zinc Anodes - Shipyard Supply
24 ZINC ANODES |
ALL | — | per piece | Page 53 ↗ | STRUCT CLEAN | |
| 25.0 .all |
Pumps Overhaul (Mechanical and Electrical Driven)
25 PUMPS |
ALL | — | per pump | Page 53 ↗ | STRUCT CLEAN | |
| 26.0 .all |
Air Compressors and Bottles
26 AIR COMPRESSORS |
ALL | — | — | Page 54 ↗ | STRUCT CLEAN | |
| 26.1 .all |
Overhaul Air Compressor (Per unit)
26 AIR COMPRESSORS |
ALL | — | per unit | Page 54 ↗ | STRUCT CLEAN | |
| 26.2 .all |
Cleaned and Rumbled Air Bottles
26 AIR COMPRESSORS |
ALL | — | per bottle | Page 55 ↗ | STRUCT CLEAN | |
| 26.3 .all |
Air Bottle Pressure Testing
26 AIR COMPRESSORS |
ALL | — | per bottle | Page 55 ↗ | STRUCT CLEAN | |
| 26.4 .all |
Service Air Reducing Valve
26 AIR COMPRESSORS |
ALL | — | per valve | Page 55 ↗ | STRUCT CLEAN | |
| 27.0 .all |
Crane and Lifting Gear Load Test and Overhaul
27 CRANE AND LIFTING GEAR |
ALL | — | per crane | Page 56 ↗ | STRUCT CLEAN | |
| 28.0 .all |
Fire Fighting Systems
28 FIRE FIGHTING SYSTEMS |
ALL | — | — | Page 56 ↗ | STRUCT CLEAN | |
| 28.1 .all |
Inspect and Test Fire Bulkhead
28 FIRE FIGHTING SYSTEMS |
ALL | — | per bulkhead | Page 56 ↗ | STRUCT CLEAN | |
| 28.2 .all |
Operational Test of Fire Detection System
28 FIRE FIGHTING SYSTEMS |
ALL | — | per compartment | Page 56 ↗ | STRUCT CLEAN | |
| 28.3 .all |
Inspect and Test Automatic Spraying / Sprinkler System
28 FIRE FIGHTING SYSTEMS |
ALL | — | per zone | Page 56 ↗ | STRUCT CLEAN | |
| 28.4 .all |
Inspect and Test Fixed Fire Fighting Installation (Foam / Halon / CO2)
28 FIRE FIGHTING SYSTEMS |
ALL | — | per system | Page 57 ↗ | STRUCT CLEAN | |
| 28.5 .all |
Weight of Fixed Inert Gas / CO2 System Bottles
28 FIRE FIGHTING SYSTEMS |
ALL | — | per bottle | Page 57 ↗ | STRUCT CLEAN | |
| 28.6 .all |
Inspect and Test Hydrant and Hoses
28 FIRE FIGHTING SYSTEMS |
ALL | — | per station | Page 57 ↗ | STRUCT CLEAN | |
| 28.7 .all |
Detached from Manifold, Determine Contents of Cylinder in situ
28 FIRE FIGHTING SYSTEMS |
ALL | — | per cylinder | Page 57 ↗ | STRUCT CLEAN | |
| 29.0 .a |
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat A)
29 LIFE SAVING EQUIPMENT |
A | RM 520.00 | per system | Page 57 ↗ | STRUCT CLEAN | |
| 29.0 .b |
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat B)
29 LIFE SAVING EQUIPMENT |
B | RM 462.80 | per system | Page 57 ↗ | STRUCT CLEAN | |
| 29.0 .c_d |
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat C/D)
29 LIFE SAVING EQUIPMENT |
C/D | RM 416.00 | per system | Page 57 ↗ | STRUCT CLEAN | |
| 29.0 .e |
Life Saving Equipment - Operational Test of Lifeboat Lowering System (Cat E)
29 LIFE SAVING EQUIPMENT |
E | RM 318.50 | per system | Page 57 ↗ | STRUCT CLEAN | |
| 30.0 .all |
Main and Auxiliary Engines (Internal Combustion Engines)
30 MAIN AND AUXILIARY ENGINES (INTERNAL COMBUSTION ENGINES) |
ALL | — | per engine | Page 57 ↗ | STRUCT CLEAN | |
| 31.0 .all |
Main Reduction Gear (Gear Box) Major Overhaul
31 MAIN REDUCTION GEAR (GEAR BOX) |
ALL | — | per gearbox | Page 58 ↗ | STRUCT CLEAN | |
| 32.0 .all |
Propulsion System Alignment
32 PROPULSION SYSTEM ALIGNMENT |
ALL | — | — | Page 58 ↗ | STRUCT CLEAN | |
| 32.1 .all |
Alignment Check for Main Engine to Gearbox or Gearbox to Main Engine
32 PROPULSION SYSTEM ALIGNMENT |
ALL | — | per unit | Page 58 ↗ | STRUCT CLEAN | |
| 32.2 .all |
Shaft Alignment - Check from Gearbox to Tail Shaft
32 PROPULSION SYSTEM ALIGNMENT |
ALL | — | per shaft line | Page 58 ↗ | STRUCT CLEAN | |
| 33.0 .all |
ACU and Refrigeration
33 ACU AND REFRIGERATION |
ALL | — | — | Page 59 ↗ | STRUCT CLEAN | |
| 33.1 .all |
Test and Identify Faults in Automatic Controls / Safety Devices
33 ACU AND REFRIGERATION |
ALL | — | per point | Page 59 ↗ | STRUCT CLEAN | |
| 33.2 .all |
Test HP and LP Cutouts and Recommission
33 ACU AND REFRIGERATION |
ALL | — | per unit | Page 59 ↗ | STRUCT CLEAN | |
| 33.3 .all |
Overhaul of ACU / Refrigeration Compressor
33 ACU AND REFRIGERATION |
ALL | — | per compressor | Page 59 ↗ | STRUCT CLEAN | |
| 33.4 .all |
Renewal of Insulation (Per meter run)
33 ACU AND REFRIGERATION |
ALL | — | per meter run | Page 60 ↗ | STRUCT CLEAN | |
| 34.0 .all |
Flexible Coupling Overhaul
34 FLEXIBLE COUPLING |
ALL | — | per coupling | Page 60 ↗ | STRUCT CLEAN | |
| 35.0 .a |
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat A)
35 MECHANICAL PRESSURE GAUGES |
A | RM 57.75 | per gauge | Page 61 ↗ | STRUCT CLEAN | |
| 35.0 .b |
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat B)
35 MECHANICAL PRESSURE GAUGES |
B | RM 54.29 | per gauge | Page 61 ↗ | STRUCT CLEAN | |
| 35.0 .c_d |
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat C/D)
35 MECHANICAL PRESSURE GAUGES |
C/D | RM 50.82 | per gauge | Page 61 ↗ | STRUCT CLEAN | |
| 35.0 .e |
Mechanical Pressure Gauges Strip, Clean, Calibrate and Test (Cat E)
35 MECHANICAL PRESSURE GAUGES |
E | RM 50.82 | per gauge | Page 61 ↗ | STRUCT CLEAN | |
| 36.0 .all |
Cleaning of Bilges
36 CLEANING OF BILGES |
ALL | — | — | Page 61 ↗ | STRUCT CLEAN | |
| 36.1 .a |
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat A)
36 CLEANING OF BILGES |
A | RM 42.79 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.1 .b |
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat B)
36 CLEANING OF BILGES |
B | RM 38.17 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.1 .c_d |
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat C/D)
36 CLEANING OF BILGES |
C/D | RM 35.86 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.1 .e |
Manual Cleaning of Bilges Including Detergent (Per m²) (Cat E)
36 CLEANING OF BILGES |
E | RM 26.62 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.2 .a |
Steam Cleaning of Bilges (Per m²) (Cat A)
36 CLEANING OF BILGES |
A | RM 57.75 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.2 .b |
Steam Cleaning of Bilges (Per m²) (Cat B)
36 CLEANING OF BILGES |
B | RM 50.82 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.2 .c_d |
Steam Cleaning of Bilges (Per m²) (Cat C/D)
36 CLEANING OF BILGES |
C/D | RM 47.36 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 36.2 .e |
Steam Cleaning of Bilges (Per m²) (Cat E)
36 CLEANING OF BILGES |
E | RM 35.81 | per m² | Page 61 ↗ | STRUCT CLEAN | |
| 37.0 .all |
Electrical System
37 ELECTRICAL SYSTEM |
ALL | — | — | Page 61 ↗ | STRUCT CLEAN | |
| 37.1 .all |
Inspection and Test of Switchboard Safety Devices
37 ELECTRICAL SYSTEM |
ALL | — | — | Page 61 ↗ | STRUCT CLEAN | |
| 37.1.1 .all |
Overhaul Normal Circuit Breaker (Per piece)
37 ELECTRICAL SYSTEM |
ALL | — | per piece | Page 61 ↗ | STRUCT CLEAN | |
| 37.1.2 .all |
Overhaul Main Circuit Breaker (ACB / MCCB)
37 ELECTRICAL SYSTEM |
ALL | — | per piece | Page 62 ↗ | STRUCT CLEAN | |
| 37.2 .all |
Insulation Test of Electrical Installation
37 ELECTRICAL SYSTEM |
ALL | — | per circuit | Page 62 ↗ | STRUCT CLEAN | |
| 37.3 .all |
Meters Check, Calibrate and Test (Voltmeter, Ammeter, Frequency, Synchroscope)
37 ELECTRICAL SYSTEM |
ALL | — | per meter | Page 63 ↗ | STRUCT CLEAN | |
| 37.4 .all |
Main Switchboard Overhaul and Chemical Cleaning
37 ELECTRICAL SYSTEM |
ALL | — | per section | Page 63 ↗ | STRUCT CLEAN | |
| 37.5 .all |
Main Alternator Overhaul (3 Phase) Up to Six Poles
37 ELECTRICAL SYSTEM |
ALL | — | per alternator | Page 64 ↗ | STRUCT CLEAN | |
| 37.6 .all |
Main Alternator Single Phase Overhaul
37 ELECTRICAL SYSTEM |
ALL | — | per alternator | Page 65 ↗ | STRUCT CLEAN | |
| 37.7 .all |
Main Alternator Control Unit (Exciter / AVR)
37 ELECTRICAL SYSTEM |
ALL | — | per unit | Page 65 ↗ | STRUCT CLEAN | |
| 37.8 .all |
Converter Alternators (Motor Generator Sets)
37 ELECTRICAL SYSTEM |
ALL | — | per unit | Page 66 ↗ | STRUCT CLEAN | |
| 37.9 .all |
DC Generators Overhaul and Commutator Dressing
37 ELECTRICAL SYSTEM |
ALL | — | per generator | Page 66 ↗ | STRUCT CLEAN | |
| 37.10 .all |
AC Motors (3 Phase, Four Poles)
37 ELECTRICAL SYSTEM |
ALL | — | per motor | Page 68 ↗ | STRUCT CLEAN | |
| 37.11 .all |
AC Single Phase Motors
37 ELECTRICAL SYSTEM |
ALL | — | per motor | Page 69 ↗ | STRUCT CLEAN | |
| 37.12 .all |
DC Motors Overhaul and Rewinding
37 ELECTRICAL SYSTEM |
ALL | — | per motor | Page 69 ↗ | STRUCT CLEAN | |
| 37.13 .all |
Transformers Overhaul and Rewind
37 ELECTRICAL SYSTEM |
ALL | — | per transformer | Page 71 ↗ | STRUCT CLEAN | |
| 37.14 .all |
Starters and Controllers (Per unit)
37 ELECTRICAL SYSTEM |
ALL | — | per unit | Page 71 ↗ | STRUCT CLEAN | |
| 37.15 .all |
Main and Auxiliary Engine Warning and Control System
37 ELECTRICAL SYSTEM |
ALL | — | per system | Page 72 ↗ | STRUCT CLEAN | |
| 38.0 .all |
Navigation / Radar / Communication Equipment
38 NAVIGATION / RADAR / COMMUNICATION EQUIPMENT |
ALL | — | per system | Page 72 ↗ | STRUCT CLEAN | |
| 39.0 .all |
Exhaust Lagging (Per m²)
39 EXHAUST LAGGING |
ALL | — | per m² | Page 72 ↗ | STRUCT CLEAN | |
| 40.0 .all |
Cabling Work
40 CABLING WORK |
ALL | — | — | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
A | RM 60.06 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
A | RM 114.84 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
B | RM 55.00 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
B | RM 102.30 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
C/D | RM 50.45 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
C/D | RM 96.14 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
E | RM 38.83 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
E | RM 72.60 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.2 .all |
Renewal of Cable Trays
40 CABLING WORK |
ALL | — | per meter run | Page 74 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
A | RM 38.00 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
B | RM 30.00 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
C/D | RM 25.00 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
E | RM 18.50 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
A | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
ALL | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
B | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
C/D | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
E | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
A | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
ALL | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
B | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
C/D | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
E | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
A | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
ALL | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
B | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
C/D | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
E | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN |