← Back to Dashboard
Tariff Master & Schedule of Rates
Official Government & Commercial Marine Repair Tariffs · Digitalized Authoritative Source: Jadual Kadar Untuk Kerja-Kerja Pembaikan Dan Penyelenggaraan Bot/Kapal Kerajaan 2012 (v)
SHA: 94c739f00151
75 Pages Indexed
Total Staged Items
169
Structurally Clean
167
Active Catalog Items
167
GANPS Verified
0
Review Required
1
Source Conflict
1
⚠️ Tariff Staging Exceptions Requiring Expert Review (2)
Preserved in staging without auto-promoting to active catalog| Para | Description | Source Page | State | Flags |
|---|---|---|---|---|
| Terms.b | Cost of access work is not included in the Schedule of Rates unless specified | Page 9 | SOURCE_CONFLICT | NON_PRICED_CONDITION |
| 3.13 | Araldite Coating (Cost plus 15% mark-up) | Page 17 | REVIEW_REQUIRED | RATE_AS_MARKUP_PERCENTAGE,MISSING_NUMERIC_RATE |
📖 Active Tariff Master Items (167)
Primary UX: FIND → COMPARE → VERIFY → USE
| Para / Code | Description / Specification | Cat | Official Rate | Unit | Source | Verification | Action |
|---|---|---|---|---|---|---|---|
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
A | RM 58.40 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
A | RM 25.64 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
A | RM 29.88 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
B | RM 50.40 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
B | RM 21.64 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
B | RM 25.88 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
C/D | RM 45.40 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Cardboard
1 PREPARATION |
C/D | RM 19.14 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
C/D | RM 23.38 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .a |
Preparation - Providing duckboards (3m² per piece) for duration of refit: Plywood
1 PREPARATION |
E | RM 38.90 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .b |
Preparation - Providing duckboards: Cardboard (Audited)
1 PREPARATION |
E | RM 15.89 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 1.0 .c |
Preparation - Providing duckboards (3m² per piece) for duration of refit: PVC sheet covering
1 PREPARATION |
E | RM 20.13 | per piece | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
A | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
B | RM 1,069.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
C/D | RM 159.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
C/D | RM 367.90 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
C/D | RM 552.50 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
C/D | RM 737.10 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_up_to_5 |
Docking and Undocking: Slipway - Length Up to 5m
2 DOCKING CHARGES |
E | RM 148.20 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_5_to_10 |
Docking and Undocking: Slipway - Length Above 5 to 10m
2 DOCKING CHARGES |
E | RM 348.20 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_10_to_15 |
Docking and Undocking: Slipway - Length Above 10 to 15m
2 DOCKING CHARGES |
E | RM 516.10 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.1 .slipway_15_to_20 |
Docking and Undocking: Slipway - Length Above 15 to 20m
2 DOCKING CHARGES |
E | RM 689.00 | operation | Page 10 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
A | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
A | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
A | RM 130.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
B | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
B | RM 86.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
B | RM 130.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
C/D | RM 66.10 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
C/D | RM 72.60 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
C/D | RM 96.80 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_10_to_15 |
Dock or Slipway Hire (Per day or part): Slipway - Above 10 to 15m
2 DOCKING CHARGES |
E | RM 42.90 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_15_to_20 |
Dock or Slipway Hire (Per day or part): Slipway - Above 15 to 20m
2 DOCKING CHARGES |
E | RM 55.00 | day | Page 11 ↗ | STRUCT CLEAN | |
| 2.2 .slipway_20_to_25 |
Dock or Slipway Hire (Per day or part): Slipway - Above 20 to 25m
2 DOCKING CHARGES |
E | RM 73.70 | day | Page 11 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.1 .survey |
Joint visual survey of underwater plating and appendages when vessel is first upslipped/docked
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 0.00 | lump_sum | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 4.80 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 4.32 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 3.96 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.2 .hp_cleaning |
H.P Fresh Water Cleaning
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 3.00 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 7.26 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 6.60 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 6.12 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.3 .scraping |
Scraping (Including HP Fresh Water Cleaning)
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 4.56 | m² | Page 14 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 33.00 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 52.80 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 29.28 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 52.80 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 27.72 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 49.92 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .external |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 21.12 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.6 .internal |
Grinding (In any position to sound paint inclusive of labour cost for one coat of primer) - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 38.04 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 79.44 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 94.56 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 70.56 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 84.48 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 65.52 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 83.16 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .external |
Needle Scale - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 50.16 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.7 .internal |
Needle Scale - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 63.00 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 32.76 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 39.60 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 29.04 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 34.32 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 27.12 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 32.64 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .a |
Power Cup Brushing - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 20.64 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.8 .b |
Power Cup Brushing - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 32.64 | m² | Page 15 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 3.50 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 3.12 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 2.80 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .a |
Apply paint per coat per m² by conventional spray method - External
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 2.20 | m² | Page 16 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 5.30 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 7.40 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 4.70 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 6.60 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 4.30 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 6.10 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .b |
Apply paint per coat per m² by conventional spray method - Internal
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 3.40 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.11 .c |
Apply paint per coat per m² by conventional spray method - Internal of tanks
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 4.70 | m² | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 230.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
A | RM 256.00 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 230.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
B | RM 256.00 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 222.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
C/D | RM 238.40 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .up_to_20 |
Repainting of Draft Marks, Name and Other External Markings - Up to 20m
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 169.60 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 3.12 .above_20_to_36 |
Repainting of Draft Marks, Name and Other External Markings - Above 20 to 36m
3 SURFACE PREPARATION AND PRESERVATION |
E | RM 180.80 | markings | Page 17 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
A | RM 1,788.60 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
A | RM 1,893.10 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
B | RM 1,625.80 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
B | RM 1,683.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
C/D | RM 1,320.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
C/D | RM 1,398.10 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_up_to_4mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Up to 4mm
5 PLATING |
E | RM 1,010.90 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.1 .mild_steel_above_4_to_8mm |
Deck and Shell Plate Renewal (Per m²). Mild Steel (marine grade) - Above 4 to 8mm
5 PLATING |
E | RM 1,070.30 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
A | RM 3,452.90 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
A | RM 3,652.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
B | RM 3,069.00 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
B | RM 3,247.20 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
C/D | RM 2,876.50 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
C/D | RM 3,043.20 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_up_to_4mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Up to 4mm
5 PLATING |
E | RM 2,206.60 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.2 .aluminium_above_4_to_8mm |
Deck and Shell Plate Renewal - Aluminium Alloy Marine Approved - Above 4 to 8mm
5 PLATING |
E | RM 2,334.20 | m² | Page 22 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
A | RM 133.10 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
A | RM 185.90 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
B | RM 118.80 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
B | RM 167.20 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
C/D | RM 99.00 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
C/D | RM 138.60 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.05 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.05 m²
5 PLATING |
E | RM 74.80 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.1 .brackets_on_deck_below_0.1 |
Brackets and Doublers Plate Renewals: On Deck - Area Below 0.1 m²
5 PLATING |
E | RM 106.70 | piece | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
A | RM 139.70 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
A | RM 166.10 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
B | RM 125.40 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
B | RM 149.60 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
C/D | RM 104.50 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
C/D | RM 125.40 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_50x50 |
Equal Angle Bar (Per meter): On Deck - Size Up To 50 x 50mm
5 PLATING |
E | RM 79.20 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.2 .equal_angle_on_deck_65x65 |
Equal Angle Bar (Per meter): On Deck - Size Up To 65 x 65mm
5 PLATING |
E | RM 94.60 | meter | Page 23 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
A | RM 136.40 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
B | RM 121.00 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
C/D | RM 103.40 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 5.3.4 .flat_bar_on_deck_75mm |
Flat Bars (Per meter): On Deck - Size Up To 75mm
5 PLATING |
E | RM 78.10 | meter | Page 25 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
A | RM 358.40 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
B | RM 319.20 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
C/D | RM 295.40 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.1 .teak_width_4_up_to_half_inch |
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
E | RM 277.20 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
A | RM 303.80 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
B | RM 319.20 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
C/D | RM 253.40 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 8.2 .cengal_width_4_up_to_half_inch |
Hull Planking Renewal - Cengal/Local Timber (Per meter run): Width 4" - Up to 1/2"
8 WOOD WORK |
E | RM 236.60 | meter | Page 27 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
A | RM 60.06 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
A | RM 114.84 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
B | RM 55.00 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
B | RM 102.30 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
C/D | RM 50.45 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
C/D | RM 96.14 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_1.55_to_5mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - 1.55 to 5 mm²
40 CABLING WORK |
E | RM 38.83 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 40.1 .cable_5_to_10mm2 |
Renewal Of Cable. Lay, bind, terminate and tally cables on cable tray /mounting - Above 5 to 10 mm²
40 CABLING WORK |
E | RM 72.60 | meter | Page 74 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
A | RM 38.00 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
B | RM 30.00 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
C/D | RM 25.00 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 41.0 .normal_hours |
MAN-HOUR RATE (NORMAL HOURS)
41 MAN-HOUR RATE (NORMAL HOURS) |
E | RM 18.50 | man-hour | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
A | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
ALL | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
B | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
C/D | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 42.0 .materials_markup |
EQUIPMENT, SPARES AND MATERIALS - Equipment, spares or materials supplied by the Shipyard shall be charge 15% mark-up
42 EQUIPMENT, SPARES AND MATERIALS |
E | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
A | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
ALL | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
B | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
C/D | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 43.0 .specialist_service |
SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS BY THE GOVERNMENT AND SHIPYARD - A service of 15% shall be applied
43 SERVICE OF AGREED SPECIALIST SUB-CONTRACTORS |
E | RM 15.00 | markup_percent | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
A | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
ALL | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
B | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
C/D | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN | |
| 44.0 .floating_equipment |
REPAIR OF FLOATING EQUIPMENT - Cost of overhaul/repair shall be charged at 85% of this tariff
44 REPAIR OF FLOATING EQUIPMENT |
E | RM 85.00 | tariff_percentage | Page 75 ↗ | STRUCT CLEAN |