← Back to Tariff Library
Tariff Code 8.1 .teak_width_4_up_to_half_inch
8 WOOD WORK · Authoritative Tariff Marine 2012 Source Verification
📋 Extracted Tariff Metadata
Paragraph / Code:
8.1 (Sub: teak_width_4_up_to_half_inch)
Section:
8 WOOD WORK
Official Description:
Hull Planking Renewal - Teak (Per meter run): Width 4" - Up to 1/2"
Vessel Category:
Category E
Official Tariff Rate:
RM 277.20
Unit of Measurement:
meter
Source Document:
Tariff Marine 2012 (Page 27)
Extraction State:
STRUCTURALLY_CLEAN
Verification State:
STRUCTURALLY_CLEAN
✏️ Record Correction (Audit-Logged)
🔍 Primary Source Evidence: Page 27
Open High-Res ↗
Original Document: D:\My Drive\AQUA MARINE\Tariff Marine 2012.pdf (Read-Only)