← Back to Tariff Library

Tariff Code 8.8 .e

8 WOOD WORK · Authoritative Tariff Marine 2012 Source Verification

📋 Extracted Tariff Metadata

Paragraph / Code: 8.8 (Sub: e)
Section: 8 WOOD WORK
Official Description: Caulking of Deck (Per meter) (Cat E)
Vessel Category: Category E
Official Tariff Rate: RM 7.70
Unit of Measurement: per meter
Source Document: Tariff Marine 2012 (Page 29)
Extraction State: STRUCTURALLY_CLEAN
Verification State: STRUCTURALLY_CLEAN

✏️ Record Correction (Audit-Logged)

🔍 Primary Source Evidence: Page 29

Open High-Res ↗
Tariff Marine 2012 Page 29

Original Document: D:\My Drive\AQUA MARINE\Tariff Marine 2012.pdf (Read-Only)