← Back to Tariff Library
Tariff Code 8.8 .e
8 WOOD WORK · Authoritative Tariff Marine 2012 Source Verification
📋 Extracted Tariff Metadata
Paragraph / Code:
8.8 (Sub: e)
Section:
8 WOOD WORK
Official Description:
Caulking of Deck (Per meter) (Cat E)
Vessel Category:
Category E
Official Tariff Rate:
RM 7.70
Unit of Measurement:
per meter
Source Document:
Tariff Marine 2012 (Page 29)
Extraction State:
STRUCTURALLY_CLEAN
Verification State:
STRUCTURALLY_CLEAN
✏️ Record Correction (Audit-Logged)
🔍 Primary Source Evidence: Page 29
Open High-Res ↗
Original Document: D:\My Drive\AQUA MARINE\Tariff Marine 2012.pdf (Read-Only)