JOB-KM02-2026-002

Vessel: KM MARINA 02 ยท Dept: Marine Police Dept

๐Ÿ“Š Compare Revisions (0) ๐Ÿ“‘ PAC 843 Output Document Centre ๐Ÿ“‘ PAC 843 PCQ Bill (Output) + ADD / UPLOAD INFORMATION Generate / View PO

๐Ÿ›  Job Specifications & Operational Dates

DIRECT EDIT ENABLED
[CANCEL]
SECTION A: CURRENT WORK SCOPE / QUOTATION REVISION

๐Ÿ“‹ REV_0_ORIGINAL ยท Work Scope Items (0)

Active Revision Total: RM 0.00 ยท Original Baseline: RM 37,859.04 ยท Total Labour: 0 hrs
Vessel: KM MARINA 02 (Fast Interceptor Craft) Hull / Reg: HULL-KM-02 Dimensions: 18.2m x 4.8m Engine / Equipment: Caterpillar C18 Marine Diesel x 2
Revision Comparison
โš™ Physical Progress: 0% Based on: 0 completed, 0 in progress, 0 not started
Verified by GANPS: 0/0 items Financial Status: CLAIM_PREPARED
Physical progress tracks technical task completion and does NOT equal financial PCQ settlement.
SECTION B: HISTORICAL CONTRACTUAL FINANCIAL RECONCILIATION

๐Ÿ’ฐ FINANCIAL RECONCILIATION SUMMARY (STANDARD_MARINE_REPAIR) โ€” HARD-LOCKED

Mode: CUSTOM_MANUAL_REVIEW
AUTHORIZED CEILING NOT CONFIRMED
CONTRACTOR CLAIM NOT CONFIRMED
PCQ DEDUCTIONS -RM 0.00 C: -RM 0.00 | D: -RM 0.00
PCQ APPROVED RM 0.00
INVOICE GROSS NOT CONFIRMED
EXPECTED VARIANCE NOT CONFIRMED
OFFICIAL CREDIT NOTE NOT CONFIRMED
TREASURY PAID NOT CONFIRMED
PAYMENT DOCUMENT CONTROL

๐Ÿ’ณ PAYMENT DOCUMENT CHECKLIST

PDRM Routine Repair / Maintenance Supporting Documents 2026
0/15 COMPLETE INCOMPLETE
RM200K bond rule basis: Not Confirmed โ€” NOT CONFIRMED. Financial amounts are read from existing confirmed job/PCQ data only; this checklist does not recalculate them.
BIL. PERKARA REQUIRED STATUS DOCUMENT CATATAN / ACTION
1 SALINAN BON PELAKSANAAN
Required only for confirmed applicable value RM200,000 and above
YES MISSING No document uploaded
2 INVOICE MANUAL
HARGA SELEPAS CQ
Post-CQ reference: RM 0.00
YES MISSING No document uploaded
3 LAMPIRAN A INVOICE
LAMPIRAN SELEPAS CQ + CALCULATION
Post-CQ reference: RM 0.00 + calculation
YES MISSING No document uploaded
4 D/O MANUAL
JUMLAH SELEPAS CQ
Post-CQ reference: RM 0.00
YES MISSING No document uploaded
5 CREDIT NOTE MANUAL
JUMLAH POTONGAN CQ
CQ deduction reference: RM 0.00
YES MISSING No document uploaded
6 LMAF 65/9/5 AJK PENILAIAN HARGA
KOS KUIRI
YES MISSING No document uploaded
7 SURAT JAMINAN YES MISSING No document uploaded
8 SIJIL PENGESAHAN KERJA-KERJA ASAL DAN TAMBAHAN YES MISSING No document uploaded
9 SIJIL AKUAN PENERIMAAN DAN PENYERAHAN BOT RONDA YES MISSING No document uploaded
10 SURVEY REPORT YES MISSING No document uploaded
11 PESANAN KERAJAAN
LENGKAP TANDATANGAN KBK
YES MISSING No document uploaded
12 PENYATA BANK
MUKA DEPAN SAHAJA
YES MISSING No document uploaded
13 TAX COMPLIANCE CERTIFICATE (TCC)
STATUS PATUH
YES MISSING No document uploaded
14 SURAT AKUAN SYARIKAT DALAM MENANGANI JENAYAH PEMERDAGANGAN ORANG DAN BURUH PAKSA YES MISSING No document uploaded
15 BORANG PEMBERITAHUAN PEMUNYA BENEFISIAL YES MISSING No document uploaded
SER NO. DESCRIPTION OF WORK TARIFF REF NO. TARIFF COST MAN HOURS
AMOUNT (RM)
MATERIAL COST SUB TOTAL AMOUNT ACTION
No work scope items added yet.
TOTAL KESELURUHAN: RM 0.00 READ ONLY
๐Ÿ—‘๏ธ Soft-Deleted Items Archive (0) Safely preserved. Click to expand and restore.
Toggle View โ–ผ

๐Ÿ“ Job Documents & Evidence Photos (2)

+ UPLOAD DOCUMENT (HUB)
Title / Filename Category Intake Stage Size SHA-256 Hash Uploaded Action
Propeller Blade Inspection Photo
test_propeller_crack.jpg (image)
photos_before incoming 0.0 KB 961aa96ead9b 2026-09-16 06:37
Propeller Blade Inspection Photo
test_propeller_crack.jpg (image)
photos_before incoming 0.0 KB 961aa96ead9b 2026-09-16 04:17

โš– Adjustments & Deductions Record (0)

Category Scope Item Original (Claimed) Revised (Approved) Deduction Reason / Remarks Audited By
No adjustments recorded for this repair job.

๐Ÿ—“ Meeting & Review Records (0)

Type Title & Reference Date Venue Chairperson Decisions Summary Action
No formal meetings or PCQ records logged yet.