โ† Back to Job Master (JOB-PAC843-2026)

๐Ÿ“‘ PAC 843 PCQ Bill / Detailed Claim Bill

Official Submission Document ยท Vessel: PAC 843 ยท Client: PASUKAN POLIS MARIN

๐Ÿ“‘ PAC 843 Output Centre ๐Ÿ“ฅ Generate & Download XLSX
Document Readiness State

โœ… READY FOR OUTPUT

Authoritative Format: Microsoft Excel (.xlsx)
Formula & Layout Fidelity: 100% Exact to Primary Ground Truth

๐Ÿ’ฐ Financial Engine 001 Integration Check

Deterministic Decimal Quantization
Contractor Claimed RM 40,606.26
PCQ Deductions -RM 458.66 C: -RM 144.16 | D: -RM 314.50
PCQ Approved Total RM 40,147.60
LPO Ceiling Cap RM 34,921.64
Expected Credit Variance RM -5,225.96 CALCULATED โ€” NOT AN OFFICIAL CN

๐Ÿ“‹ Field-by-Field Submission Particulars

Edit in Job Master
Target Header / Cell Visible Value in Bill Evidence & Business Mapping
A1:A7 (Government Header) KETUA BAHAGIAN KEJURUTERAAN
PASUKAN POLIS MARIN SANDAKAN
WILAYAH EMPAT (4) SABAH
STATIC TEMPLATE Verified Client Command
N1:N5 (Contractor Details) Aqua Marine
Lot 35, Lorong Pecky Valley 7, Sandakan
STATIC TEMPLATE MUSUMUI Shipyard Entity
N7 (Tender Reference) PO2600000000268877 LPO/REF DATA Official PPM Quotation Ref
A9 (Document Scope Title) SKOP KERJA PENYELENGGARAAN/PEMBAIKAN TAHUNAN PAC 843 (ALUMINIUM) PPM KOTA KINABALU BAGI TAHUN 2026 JOB DATA Primary Title Block
B12:F14 (Vessel Dimensions) TYPE HULL: ALUMINIUM | PANJANG: 4 METER | LEBAR: 1.6 METER VESSEL DATA Vessel Principal Particulars
Row 220:P220 (Claimed Total) RM 40,606.26 (Formula: =SUM(M220:O220)) CALCULATED Baseline Contractor Claim
Row 221:P221 (PCQ Approved) RM 40,147.60 (Formula: =SUM(M221:O221)) CALCULATED Net Post-PCQ Approved Settlement
Row 222:P222 (Total Deductions) RM 458.66 (Formula: =SUM(M222:O222)) CALCULATED Statutory Lampiran Deductions

๐Ÿ“‘ Structural Scope Section Summary (274 Rows, 176 Formulas)

Authoritative Layout Preserved
Section 1: Slipping and Unslipping

Docking & undocking (2x), 30 days slipway charges @ RM42.90.

Section 2: Underwater Hull & Transom

Replating 8.3m2, keel strake renewal, hydro-jetting & paint scheme.

Section 3: Internal Hull Frame & Floorboard

Foam removal/renewal, hull frames, welding, bilge painting.

Section 4: Shipside Port & Starboard

Grinding, rubbing strake repair, paint scheme, boat mark repainting.

Section 5: Long Bench

Labour and material to remove, renew and install aluminium long bench.

Section 7: Boat Accessories

Paddles, fenders, boat hook, first aid kit, nylon ropes.

๐Ÿ“ฅ Generate Authoritative PAC 843 PCQ Bill (.xlsx)