📑 PAC 843 Priced Quotation / Contractor Bill
Stage A Output Document · Vessel: PAC 843 · Client: PASUKAN POLIS MARIN
Document Readiness State
✅ READY FOR OUTPUT
Authoritative Format: Microsoft Excel (.xlsx)
Original Ground Truth: PAC 843 PPM KK AQ RM35,983.43.xlsx
Original Ground Truth: PAC 843 PPM KK AQ RM35,983.43.xlsx
💰 Pre-Repair Quotation Breakdown
Zero PCQ Deductions Applied (Pre-LPO Contractor Offer)
Tariff Schedule Cost
RM 22,119.39
Man-Hours Labour (138 hrs)
RM 2,170.05
Rate @ RM 18.50 x 0.85
Material & Parts Total
RM 13,569.60
Cost + 10% markup (x 1.1)
Quotation Grand Total
RM 37,859.04
Scope Items
53 Items
📋 Quotation Header & Metadata Particulars
Edit in Job Master| Target Header / Cell | Visible Value in Quotation | Evidence & Business Mapping |
|---|---|---|
| A1:A7 (Client Authority) | KETUA BAHAGIAN KEJURUTERAAN PASUKAN POLIS MARIN SANDAKAN WILAYAH EMPAT (4) SABAH POLIS DIRAJA MALAYSIA |
STATIC TEMPLATE Marine Police Regional Base |
| N1:N5 (Contractor Identity) | Aqua Marine Lot 35, Lorong Pecky Valley 7 Taman Pecky Valley, Batu 2 1/2 Jalan Utara 90000, Sandakan, Sabah (Lesen: R50817/2024) |
STATIC TEMPLATE MUSUMUI Registered Business |
| N7 (Tender / Indent Ref) | PO2600000000268877 | REF NO PDRM Procurement Vote Ref |
| A9 (Scope Title) | SKOP KERJA PENYELENGGARAAN/PEMBAIKAN TAHUNAN PAC 843 (ALUMINIUM) PPM KOTA KINABALU BAGI TAHUN 2026 | HEADER BLOCK Official Refit Title |
| B12:F14 (Vessel Particulars) | TYPE HULL: ALUMINIUM | PANJANG: 4 METER | LEBAR: 1.6 METER | VESSEL SPECS Patrol Craft Principal Data |
| Row 204:P204 (TOTAL RM) | RM 37,859.04 (=SUM(P203+P165+P111+P57)) | CALCULATED Four Page Section Sum |
📑 Work Scope Line Items (Live Structured Database)
53 Evidenced Scope Items| Item No | Category / Section | Description & Specification | Qty / UOM | Tariff Ref | Base Rate | Factor | Sub Total |
|---|---|---|---|---|---|---|---|
| 1.1 | SLIPPING AND UNSLIPPING | Transport for sending and return. | 2 time | 2.1 |
RM 516.10 | 0.85 | RM 877.37 |
| 1.2 | SLIPPING AND UNSLIPPING | Docking Charges @ 30 Days | 30 days | 2.2 |
RM 42.90 | 0.85 | RM 328.19 |
| 2.1 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour and material to remove, renew and welding aluminium plate, replating the whole underwater hull 4.72m x 0.74 m x 2 pcs and ship side plating 0.18 m x 3.66 m x 2 pcs - total 8.3 m² | 8.3 m² | 5.2 |
RM 2,206.60 | 0.85 | RM 18,314.78 |
| 2.1 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour and material to remove, renew keel strake with aluminium angle bar 50.8mm x 50.8mm x 2.44 meter - 6 pcs | 2.44 X 6 | 5.3.2 |
RM 103.40 | 1.5 | RM 1,930.06 |
| 2.2 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour and material to remove, repair and reinstall aluminium plate for transom and bracket port and stbd Aluminium plate 4mm - 1 m² | 1 | 5.2 |
RM 2,206.60 | 0.85 | RM 1,875.61 |
| 2.3 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour and material to install wooden selangan batu for transom 2" X 8" X 1 meter - 1 pc | 16 m/h | 41 |
RM 18.50 | 0.85 | RM 251.60 |
| 2.3 (i)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Wooden Selangan batu 2" X 8" X 1 meter - 2 sheet | 2 sheet | 42 |
RM 150.00 | 1.1 | RM 330.00 |
| 2.4 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour and material to power cup brush underwater hull, shipside and transom to bare metal. (9.44 m2) | 9.44 | 3.8 (a) |
RM 20.64 | 0.85 | RM 165.62 |
| 2.5 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | To wash down after grinding and before painting underwater hull area. (9.44m2) | 9.44 | 3.2 |
RM 3.00 | 0.85 | RM 24.07 |
| 2.6 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour to paint underwater hull and transom at external area with of paint including 4 layer of full coat at antifouling.(Paint Supply by kontraktor) | 9.44 | 3.11 (a) |
RM 2.20 | 4.0 | RM 70.61 |
| 2.6 (i)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Hempel paint undercoat red - 1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 2.6 (ii)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Hempadur quattro -1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 2.6 (iii)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Yellowish grey - 1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 2.6 (iv)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Anti fouling paint - 1 tin | 1 tin | 42 |
RM 840.00 | 1.1 | RM 924.00 |
| 2.6 (v)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Hempel Thinner - 1 tin | 1 kg | 42 |
RM 105.00 | 1.1 | RM 115.50 |
| 2.7 | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Labour to remove, renew and install drain plug. floorboard and transom area at defective area | 4 m/h | 41 |
RM 18.50 | 0.85 | RM 62.90 |
| 2.7 (i)) | UNDERWATER HULL / SHIPSIDE AND TRANSOM (9.44 m²). | Drain plug - 3 pcs | 3 pcs | 42 |
RM 55.00 | 1.1 | RM 181.50 |
| 3.1 | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Labour and material to remove, grind, service and reused/ welding aluminium plate for floorboard. | 48 m/h | 41 |
RM 18.50 | 0.85 | RM 754.80 |
| 3.1 (i)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Argos Gas - 1 cyld | 1 cyl | 42 |
RM 260.00 | 1.1 | RM 286.00 |
| 3.1 (ii)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Welding Rod - 5 kg | 5 kg | 42 |
RM 150.00 | 1.1 | RM 825.00 |
| 3.1 (iii)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Repair kit - 4 set | 4 set | 42 |
RM 60.00 | 1.1 | RM 264.00 |
| 3.2 | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Labour and material remove old foam and refit new polystyrene, including cleaning internall hull. | 24 m/h | 41 |
RM 18.50 | 0.85 | RM 377.40 |
| 3.2 (i)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Polysterene thick 8'' x L6' x W4' - 2 sheets | 2 sheet | 42 |
RM 480.00 | 1.1 | RM 1,056.00 |
| 3.3 | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Labour and material remove renew hull frame bracket under floor board with aluminium flat bar 75 mm which are corroded and fitted - 10 pcs | 10 m | 5.3.1 |
RM 84.70 | 0.85 | RM 719.95 |
| 3.4 | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Labour to paint hull frame at external and floorboard, surrounding and rear floorboard and shipside area. (Paint Supply by kontraktor) | 9.44 | 3.11 (a) |
RM 2.20 | 4.0 | RM 70.61 |
| 3.4 (i)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Hempel paint undercoat red - 1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 3.4 (ii)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Yellowish grey - 1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 3.4 (iii)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Hempel paint blue - 1 tin | 1 tin | 42 |
RM 368.00 | 1.1 | RM 404.80 |
| 3.4 (iv)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Anti fouling paint - 1 tin | 1 tin | 42 |
RM 840.00 | 1.1 | RM 924.00 |
| 3.4 (v)) | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Hempel Thinner - 1 tin | 1 kg | 42 |
RM 105.00 | 1.1 | RM 115.50 |
| 3.4 | INTERNAL HULL FRAME AND FLOORBOARD (6 m²) | Labour to paint hull frame at external and floorboard, surrounding and rear floorboard and shipside area. (Paint Supply by kontraktor) | 1 bag | 42 |
RM 100.00 | 1.1 | RM 110.00 |
| 4.1 | SHIPSIDE PORT AND STBD. (8 M) | Labour to grinding in all position to bare metal shipside port and stbd. | 8 M2 | 3.6 |
RM 21.12 | 0.85 | RM 143.62 |
| 4.2 | SHIPSIDE PORT AND STBD. (8 M) | Labour and material to check, repair and renew the defective scratch, broken and cracked of shipside beam. | 24 m/h | 41 |
RM 18.50 | 0.85 | RM 377.40 |
| 4.2 (i)) | SHIPSIDE PORT AND STBD. (8 M) | Welding Rod - 2 kg | 4 kg | 42 |
RM 150.00 | 1.1 | RM 660.00 |
| 4.2 (ii)) | SHIPSIDE PORT AND STBD. (8 M) | Argos Gas - 1 cyld | 1 cyl | 42 |
RM 260.00 | 1.1 | RM 286.00 |
| 4.3 | SHIPSIDE PORT AND STBD. (8 M) | To wash down after grinding and before painting shipside area. (8 m2) | 8 | 3.2 |
RM 3.00 | 0.85 | RM 20.40 |
| 4.4 | SHIPSIDE PORT AND STBD. (8 M) | Labour to paint according to scheme shipside port and stbd. (min.charge 10m2) (Paint Supply by Kontraktor) | 10 | 3.11 (a) |
RM 2.20 | 2.0 | RM 37.40 |
| 4.4 (i)) | SHIPSIDE PORT AND STBD. (8 M) | Hempel paint undercoat red - 1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 4.4 (ii)) | SHIPSIDE PORT AND STBD. (8 M) | Yellowish grey - 1 tin | 1 tin | 42 |
RM 280.00 | 1.1 | RM 308.00 |
| 4.4 (iii)) | SHIPSIDE PORT AND STBD. (8 M) | Hempel paint blue - 1 tin | 1 tin | 42 |
RM 368.00 | 1.1 | RM 404.80 |
| 4.4 (iv)) | SHIPSIDE PORT AND STBD. (8 M) | Hempel Thinner - 1 tin | 1 kg | 42 |
RM 105.00 | 1.1 | RM 115.50 |
| 4.5 | SHIPSIDE PORT AND STBD. (8 M) | Labour to repaint boat number and draft mark. Boat number with the location. | 2 | 3.12 |
RM 169.60 | 0.85 | RM 288.32 |
| 4.6 | SHIPSIDE PORT AND STBD. (8 M) | Labour to remove, renew and install sst cleat bow. | 12 m/h | 41 |
RM 18.50 | 0.85 | RM 188.70 |
| 4.6 (i)) | SHIPSIDE PORT AND STBD. (8 M) | SST cleat 6" - 6 pcs | 6 pcs | 42 |
RM 250.00 | 1.1 | RM 1,650.00 |
| 5.1 | LONG BENCH | Labour and material to remove, renew and install seat for passenger and boatman. Install the legs in the middle of each seat. | 8 m/h | 41 |
RM 18.50 | 0.85 | RM 125.80 |
| 5.1 (i)) | LONG BENCH | Wooden selangan batu 2" x 8" x 6' - 3 pcs | 3 pcs | 42 |
RM 250.00 | 1.1 | RM 825.00 |
| 5.1 (ii)) | LONG BENCH | SST bolt and nuts 4" - 12 pcs | 12 pcs | 42 |
RM 25.00 | 1.1 | RM 330.00 |
| 7.1 | BOAT ACCESSORIES | To carry out supply boat accessories on board. | 2 m/h | 41 |
RM 18.50 | 0.85 | RM 31.45 |
| 7.1 (a)) | BOAT ACCESSORIES | Paddle - 2 Unit | 2 unit | 42 |
RM 150.00 | 1.1 | RM 330.00 |
| 7.1 (d)) | BOAT ACCESSORIES | Fender F2 - 2 Pcs | 2 pcs | 42 |
RM 245.00 | 1.1 | RM 539.00 |
| 7.1 (e)) | BOAT ACCESSORIES | Boat Hook - 1 Pc | 1 pcs | 42 |
RM 150.00 | 1.1 | RM 165.00 |
| 7.1 (f)) | BOAT ACCESSORIES | First Aid Kit - 1 Set | 1 set | 42 |
RM 120.00 | 1.1 | RM 132.00 |
| 7.1 (h)) | BOAT ACCESSORIES | Nylon rope 16mm - 20 metre | 20 m | 42 |
RM 20.00 | 1.1 | RM 440.00 |