๐ PAC 843 PCQ Bill / Detailed Claim Bill
Official Submission Document ยท Vessel: SUB-CON BOAT RH61 ยท Client: Sabah Marine Logistics
Document Readiness State
โ READY FOR OUTPUT
Authoritative Format: Microsoft Excel (.xlsx)
Formula & Layout Fidelity: 100% Exact to Primary Ground Truth
Formula & Layout Fidelity: 100% Exact to Primary Ground Truth
๐ฐ Financial Engine 001 Integration Check
Deterministic Decimal Quantization
Contractor Claimed
RM 15,600.00
PCQ Deductions
-RM 0.00
C: -RM 144.16 | D: -RM 314.50
PCQ Approved Total
RM 15,600.00
LPO Ceiling Cap
RM 34,921.64
Expected Credit Variance
RM 19,321.64
CALCULATED โ NOT AN OFFICIAL CN
๐ Field-by-Field Submission Particulars
Edit in Job Master| Target Header / Cell | Visible Value in Bill | Evidence & Business Mapping |
|---|---|---|
| A1:A7 (Government Header) | KETUA BAHAGIAN KEJURUTERAAN PASUKAN POLIS MARIN SANDAKAN WILAYAH EMPAT (4) SABAH |
STATIC TEMPLATE Verified Client Command |
| N1:N5 (Contractor Details) | Aqua Marine Lot 35, Lorong Pecky Valley 7, Sandakan |
STATIC TEMPLATE MUSUMUI Shipyard Entity |
| N7 (Tender Reference) | REF-RH61-2026 | LPO/REF DATA Official PPM Quotation Ref |
| A9 (Document Scope Title) | SKOP KERJA PENYELENGGARAAN/PEMBAIKAN TAHUNAN PAC 843 (ALUMINIUM) PPM KOTA KINABALU BAGI TAHUN 2026 | JOB DATA Primary Title Block |
| B12:F14 (Vessel Dimensions) | TYPE HULL: ALUMINIUM | PANJANG: 4 METER | LEBAR: 1.6 METER | VESSEL DATA Vessel Principal Particulars |
| Row 220:P220 (Claimed Total) | RM 15,600.00 (Formula: =SUM(M220:O220)) | CALCULATED Baseline Contractor Claim |
| Row 221:P221 (PCQ Approved) | RM 15,600.00 (Formula: =SUM(M221:O221)) | CALCULATED Net Post-PCQ Approved Settlement |
| Row 222:P222 (Total Deductions) | RM 0.00 (Formula: =SUM(M222:O222)) | CALCULATED Statutory Lampiran Deductions |
๐ Structural Scope Section Summary (274 Rows, 176 Formulas)
Authoritative Layout Preserved
Section 1: Slipping and Unslipping
Docking & undocking (2x), 30 days slipway charges @ RM42.90.
Section 2: Underwater Hull & Transom
Replating 8.3m2, keel strake renewal, hydro-jetting & paint scheme.
Section 3: Internal Hull Frame & Floorboard
Foam removal/renewal, hull frames, welding, bilge painting.
Section 4: Shipside Port & Starboard
Grinding, rubbing strake repair, paint scheme, boat mark repainting.
Section 5: Long Bench
Labour and material to remove, renew and install aluminium long bench.
Section 7: Boat Accessories
Paddles, fenders, boat hook, first aid kit, nylon ropes.