JOB-RH61-2026-001

Vessel: SUB-CON BOAT RH61 ยท Dept: Sabah Marine Logistics

๐Ÿ“Š Compare Revisions (0) ๐Ÿ“‘ PAC 843 Output Document Centre ๐Ÿ“‘ PAC 843 PCQ Bill (Output) + ADD / UPLOAD INFORMATION Generate / View PO

๐Ÿ›  Job Specifications & Operational Dates

DIRECT EDIT ENABLED
[CANCEL]
SECTION A: CURRENT WORK SCOPE / QUOTATION REVISION

๐Ÿ“‹ REV_0_ORIGINAL ยท Work Scope Items (4)

Active Revision Total: RM 15,600.00 ยท Original Baseline: RM 37,859.04 ยท Total Labour: 82.0 hrs
Vessel: SUB-CON BOAT RH61 (Sub-Con Patrol / Work Boat) Hull / Reg: HULL-RH61 Dimensions: 14.5m x 4.2m Engine / Equipment: Twin Inboard Marine Diesel
Revision Comparison
โš™ Physical Progress: 44% Based on: 1 completed, 1 in progress, 2 not started
Verified by GANPS: 2/4 items Financial Status: CLAIM_PREPARED
โ„น๏ธ Physical progress tracks technical task completion and does NOT equal financial PCQ settlement.
SECTION B: HISTORICAL CONTRACTUAL FINANCIAL RECONCILIATION

๐Ÿ’ฐ FINANCIAL RECONCILIATION SUMMARY (COMMERCIAL) โ€” HARD-LOCKED

Mode: COMMERCIAL_DIRECT_BILLING
AUTHORIZED CEILING NOT CONFIRMED
CONTRACTOR CLAIM RM 15,600.00
PCQ DEDUCTIONS -RM 0.00 C: -RM 0.00 | D: -RM 0.00
PCQ APPROVED RM 15,600.00
INVOICE GROSS NOT CONFIRMED
EXPECTED VARIANCE NOT CONFIRMED
OFFICIAL CREDIT NOTE NOT CONFIRMED
TREASURY PAID NOT CONFIRMED
No. Category Description & Details Responsible Target Date Cost (RM) Status Verification Action
๐Ÿ“‚ SECTION: GENERAL WORK SCOPE
1 original To overhaul port side main engine water pump and replace seals
Parts: Impeller & Seal Kit
Remarks: Original work scope
โ€” โ€” RM 2,500.00
Est: RM 2,500.00
TARIFF Para 41.0.normal_hours
Cat E ยท RM 18.50 / man-hour
Qty/Hrs: 1 ยท Line Total: RM 2,500.00
Source: Page 75 โ†—
โš ๏ธ TARIFF NOT YET GANPS VERIFIED
COMPLETED โœ“ Verified by ganps
2 original To service and test starboard turbocharger assembly
Parts: Turbo rebuild kit
Remarks: Awaiting final bench test
โ€” โ€” RM 4,500.00
Est: RM 4,500.00
IN PROGRESS โœ“ Verified by ganps
3 additional Hull high-pressure hydrojet wash and marine anti-fouling paint application
Parts: Jotun Seaforce 90
Remarks: Approved variation work
โ€” โ€” RM 6,800.00
Est: RM 6,800.00
pending
4 additional Replace starboard propulsion shaft cutlass bearing
Remarks: Dry dock inspection requirement
โ€” โ€” RM 1,800.00
Est: RM 1,800.00
pending
SECTION SUB-TOTAL (GENERAL WORK SCOPE): RM 15,600.00 Read-Only Section Sum
TOTAL KESELURUHAN: RM 15,600.00 โœ“ Auto-calculated sum of all section sub-totals

+ [+ ADD] Work Scope Line Item

Auto-Calculation Enabled: (Qty ร— Rate) + Material + Labour = Line Total
๐Ÿ—‘๏ธ Soft-Deleted Items Archive (0) Safely preserved. Click to expand and restore.
Toggle View โ–ผ

๐Ÿ“ Job Documents & Evidence Photos (2)

+ UPLOAD DOCUMENT (HUB)
Title / Filename Category Intake Stage Size SHA-256 Hash Uploaded Action
SKOP_KERJA_RH_47_PPM_SPA_EMPTY.xls
SKOP_KERJA_RH_47_PPM_SPA_EMPTY.xls (excel)
work_scope filed 168.0 KB 48bde11d85bc 2026-09-23 14:05
SURVEY REPORT
testing.pdf (pdf)
payment_supporting_document incoming 0.0 KB 1d1b598f506e 2026-09-18 02:54

โš– Adjustments & Deductions Record (0)

Category Scope Item Original (Claimed) Revised (Approved) Deduction Reason / Remarks Audited By
No adjustments recorded for this repair job.

๐Ÿ—“ Meeting & Review Records (6)

Type Title & Reference Date Venue Chairperson Decisions Summary Action
PRE_COST_QUERY_PCQ Mesyuarat Penyelarasan Teknikal RH61 (Kemaskini) 2026-09-23 Bilik Mesyuarat Limbungan Aqua Marine Komander Ahmad Albab Bersetuju dengan tarikh undocking pada 30 September 2026.
PRE_COST_QUERY_PCQ Mesyuarat Penyelarasan Teknikal RH61 2026-09-23 Bilik Mesyuarat Limbungan Aqua Marine Komander Ahmad Albab Bersetuju dengan tarikh undocking pada 30 September 2026.
PRE_COST_QUERY_PCQ Mesyuarat Penyelarasan Teknikal RH61 2026-09-23 Bilik Mesyuarat Limbungan Aqua Marine Komander Ahmad Albab Bersetuju dengan tarikh undocking pada 30 September 2026.
PRE_COST_QUERY_PCQ Mesyuarat Penyelarasan Teknikal RH61 2026-09-23 Bilik Mesyuarat Limbungan Aqua Marine Komander Ahmad Albab Bersetuju dengan tarikh undocking pada 30 September 2026.
PRE_COST_QUERY_PCQ Mesyuarat Penyelarasan Teknikal RH61 2026-09-23 Bilik Mesyuarat Limbungan Aqua Marine Komander Ahmad Albab Bersetuju dengan tarikh undocking pada 30 September 2026.
PRE_COST_QUERY_PCQ Mesyuarat Penyelarasan Teknikal RH61 2026-09-23 Bilik Mesyuarat Limbungan Aqua Marine Komander Ahmad Albab Bersetuju dengan tarikh undocking pada 30 September 2026.