ACTIVE AQUA PROCUREMENT PROJECT

JOB-RH61-2026-001 · SUB-CON BOAT RH61

RH61 RH47 Procurement - Live · RH47_LOCKED · Status NEEDS REVIEW

5 / 7 workflow stages reached

Export blocked: 1: NO RATE

Export blocked: 1.1: QUANTITY NOT PROVIDED | 1.2: QUANTITY NOT PROVIDED | 1.3: QUANTITY NOT PROVIDED | 1.3: NO RATE | 1.3: RATE REFERENCE WITHOUT RATE | 2.1: QUANTITY NOT PROVIDED | 2.2: QUANTITY NOT PROVIDED | 2.2: NO RATE

PROCUREPILOT · GANPS ONE-PAGE BUYING BOARD

All 68 items — see everything, then buy

No need to open each item to see marketplace prices or recommendation.
🟢 0 BUY NOW · 🟡 36 CHECK FIRST · 🔴 32 HOLD
✓ AUTO SAVED · 2026-11-17T21:58:22+00:00
0🟢 BUY NOW
36🟡 CHECK FIRST
32🔴 HOLD
ONE PAGE — NO ITEM-BY-ITEM OPENING. Read left → right: ITEM / 中文 / QTY → INPUT PRICE → SHOPEE → LAZADA → PINDUODUO → ALIBABA → BUYEE JAPAN → RECOMMENDED BUY → STATUS → DIRECT ACTION. Missing verified marketplace evidence is shown clearly and never guessed. Every processed upload is auto-saved.
# / ITEM / 中文 / QTYINPUT PRICESHOPEELAZADAPINDUODUOALIBABABUYEE JAPANRECOMMENDED BUYSTATUSDIRECT ACTION
1 · 1.1 · To docking and undocking boat. 船用物料:To docking and undocking boat. QTY: — RM
WHATSAPP
RM 1069.90
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
2 · 1.2 · Docking chargers 30 days. 船用物料:Docking chargers 30 days. QTY: — RM
WHATSAPP
RM 86.90
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
3 · 1.3 · Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work. 船用物料:Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work. QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
4 · 2.1 · To scrape marine growth,wash down and clean underwater hull with HP freshwater (22.66m²) To scrape 船用 growth,wash down and clean underwater hull with HP freshwater (22.66m²) QTY: — m2
WHATSAPP
RM 7.26
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
5 · 2.2 · Labour to grinding underwater hull to bare fibre. (22.66m²) 船用物料:Labour to grinding underwater hull to bare fibre. (22.66m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
6 · 2.3 · Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 kg Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 公斤 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
7 · 2.4 · Labour to grinding underwater hull to smooth before painting. (min. charge 10m²) 船用物料:Labour to grinding underwater hull to smooth before painting. (min. charge 10m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
8 · 2.5 · To wash down after grinding and before painting underwater hull area.(22.66m2) 船用物料:To wash down after grinding and before painting underwater hull area.(22.66m2) QTY: — m2
WHATSAPP
RM 4.80
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
9 · 2.6 · Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin 船用物料:Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
10 · 2.7 · Labour to reposition chock/block to complete coverage painting. 船用物料:Labour to reposition chock/block to complete coverage painting. QTY: — block
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
11 · 3.1 · Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²) 船用物料:Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²) QTY: — m2
WHATSAPP
RM 7.26
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
12 · 3.2 · To grinding the whole ship side area to sound paint. (14.24m²) 船用物料:To grinding the whole ship side area to sound paint. (14.24m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
13 · 3.3 · Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin 船用物料:Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
14 · 3.4 · Labour to grinding shipside to smooth before painting. (min. charge 10m²) 船用物料:Labour to grinding shipside to smooth before painting. (min. charge 10m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
15 · 3.5 · To wash down after grinding and before painting shipside area. (14.24m²) 船用物料:To wash down after grinding and before painting shipside area. (14.24m²) QTY: — m2
WHATSAPP
RM 4.80
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
16 · 3.6 · Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin 船用物料:Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
17 · 4.1 · Fresh water clean transom and motor well (min.charge 10m²) Fresh water clean transom and 电机 well (min.charge 10m²) QTY: — m2
WHATSAPP
RM 4.80
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
18 · 4.2 · Labour and material to cutting motor well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12mm - 6 sheet Labour and material to cutting 电机 well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12毫米 - 6 sheet QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
19 · 4.3 · To grinding the whole transom and motorwell area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 kg To grinding the whole transom and 电机well area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 公斤 QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
20 · 4.4 · Cleaning the transom and motor well with HP fresh water before painting. (min.charge 10m²) Cleaning the transom and 电机 well with HP fresh water before painting. (min.charge 10m²) QTY: — m2
WHATSAPP
RM 4.80
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
21 · 4.5 · Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter 船用物料:Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
22 · 4.6 · Labour and material to respray paint motor well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter Labour and material to respray paint 电机 well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
23 · 4.7 · Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 pcs Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 件 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
24 · 4.8 · Labour and material to remove, renew and reinstall inspection cover motor well. Material : a. Deck Inspection Hatch 353mm X 606mm - 1 unit b. Deck Inspection Hatch round dia 8'' - 2 sets Labour and material to remove, renew and reinstall inspection cover 电机 well. Material : a. Deck Inspection Hatch 353毫米 X 606毫米 - 1 个 b. Deck Inspection Hatch round dia 8'' - 2 sets QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
25 · 5.1 · Labour and material to repair fender port and stbd. Material; a.. Hyphalon cloth 1.5mm - 26m b.. Rima Tic SC 2000 - 20 kg c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud Bolt and Nut 3/4" x 10" - 50 Sets Labour and material to repair 护舷材 port and stbd. Material; a.. Hyphalon cloth 1.5毫米 - 26米 b.. Rima Tic SC 2000 - 20 公斤 c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud 螺栓 and 螺母 3/4" x 10" - 50 Sets QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
26 · 5.2 · Labour and material to repair bracket fibreglass below fenders Material; a.. W/P plywood 12mm - 2 sheets b.. 3mm (T) x 25mm Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 kgs d.. Resin - 30 kgs e.. Hardener - 0.5 kg f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets Labour and material to repair bracket fibreglass below 护舷材s Material; a.. W/P plywood 12毫米 - 2 sheets b.. 3毫米 (T) x 25毫米 Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 公斤 d.. Resin - 30 公斤 e.. Hardener - 0.5 公斤 f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
27 · 6.1 · Labour and materials to grinding smooth main deck surface in order for paint application. (18m²) 船用物料:Labour and materials to grinding smooth main deck surface in order for paint application. (18m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
28 · 6.2 · Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 kg Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 公斤 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
29 · 6.3 · Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²) 船用物料:Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
30 · 6.4 · Fresh water cleaning before painting. (18m²) 船用物料:Fresh water cleaning before painting. (18m²) QTY: — RM
WHATSAPP
RM 4.80
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
31 · 6.5 · To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags 船用物料:To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
32 · 6.6 · Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST bolt and nut 1/4" x 2'' - 42 Sets Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST 螺栓 and 螺母 1/4" x 2'' - 42 Sets QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
33 · 6.8 · Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3mm 4'' x 8'' - 4 sheet b. SST Bolt and nut 1/2'' x 2 '' - 16 pcs Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3毫米 4'' x 8'' - 4 sheet b. SST 螺栓 and 螺母 1/2'' x 2 '' - 16 件 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
34 · 6.9 · Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets 船用物料:Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
35 · 7.1 · Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon rope 9mm - 20 meter Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon 船用绳索 9毫米 - 20 meter QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
36 · 7.2 · Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²) 船用物料:Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
37 · 7.3 · Fresh water clean transom stand deck awning before painting (min.charge 10m²) 船用物料:Fresh water clean transom stand deck awning before painting (min.charge 10m²) QTY: — m2
WHATSAPP
RM 4.80
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
38 · 7.4 · Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters 船用物料:Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
39 · 7.5 · Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8m x 1.5m - 1 sheet Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8米 x 1.5米 - 1 sheet QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
40 · 8.1 · Labour and material to repair mounting gpmg Material; a. SST Bolt Nut - 9 pcs b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg Labour and material to repair mounting gpmg Material; a. SST 螺栓 螺母 - 9 件 b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
41 · 8.2 · Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²) 船用物料:Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²) QTY: — m2
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
42 · 8.3 · Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter 船用物料:Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
43 · 9.1 · Labour to pump out fuel from the fuel tank before cleaning. Labour to 泵 out fuel from the fuel tank before cleaning. QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
44 · 9.2 · Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes 船用物料:Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
45 · 9.3 · Labour to remove the fuel tank bracket bolt and nuts, hoses, piping in the way of tank removal and fitting back after completion Labour to remove the fuel tank bracket 螺栓 and 螺母s, 软管s, piping in the way of tank removal and fitting back after completion QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
46 · 9.4 · Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3mm - 12m² b. SST plate 9mm - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST bolt and nut 1/2'' x 2'' - 24 pcs Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3毫米 - 12m² b. SST plate 9毫米 - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST 螺栓 and 螺母 1/2'' x 2'' - 24 件 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
47 · 9.5 · Manhole cover and renew oil resisten gasket 船用物料:Manhole cover and renew oil resisten gasket QTY: — set
WHATSAPP
RM 80.85
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
48 · 9.6 · Labour to carry out pressure test on tanks. (Min. charge 5m³) 船用物料:Labour to carry out pressure test on tanks. (Min. charge 5m³) QTY: — m³
WHATSAPP
RM 36.96
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
49 · 9.1 · Labour and material to renew and reistall inlet hose, overflow hose and oil level hose fuel tank port and stbd. Material: a. SST stop valve 50mm - 2 pcs b. SST Nipple - 2 Pcs c. Fuel Hose Dia 50mm - 2 Length d. SST hose clamp dia 50mm – 4 pcs Labour and material to renew and reistall inlet 软管, overflow 软管 and oil level 软管 fuel tank port and stbd. Material: a. SST stop 阀门 50毫米 - 2 件 b. SST Nipple - 2 件 c. Fuel 软管 Dia 50毫米 - 2 Length d. SST 软管 clamp dia 50毫米 – 4 件 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
50 · 9.11 · Labour and material to renew fuel hose from fuel tank to water separator filter engine port and stbd. Material: a. UNIGAWA Fuel hose 12mm x 7' - 12 meter b. SST hose clamp 15mm - 18pcs Labour and material to renew fuel 软管 from fuel tank to water separator 滤芯 engine port and stbd. Material: a. UNIGAWA Fuel 软管 12毫米 x 7' - 12 meter b. SST 软管 clamp 15毫米 - 18pcs QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
51 · 10.1 · Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²) 船用物料:Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²) QTY: — m2
WHATSAPP
RM 42.79
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
CONTRACTOR / QUOTE
Service/work item · no online payment.
🟡 YELLOW
CHECK FIRST
GET QUOTE →
52 · 10.2 · Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin 船用物料:Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
53 · 10.3 · Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcs Labour and material to dismantle and install new bilges 泵. Material : a. 船用舱底泵 - 1 set b. Spring 软管 1'' - 12 Mtrs c. SST Clamp 30毫米 - 8 件 d. Seaflo Bilgest 泵 Switch 3 Ways - 1 件 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
RM 117.00
⚠ SPEC CHECK · REVIEW OPEN SOURCE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
Shopee
RM 117.00
Ranked #1 because it leads #2 by 1.6 points and has the lower comparable MYR price.
🔴 RED
HOLD
REVIEW / HOLD
54 · 10.4 · Labour and materials to remove, renew and reinstall manual hand pump. Materials: a. Whale manual Hand pump 38mm - 2 set b. Hose spring 1 1/2" - 2 Mtr c. SST hose clamp dia 50mm - 4 pcs Labour and materials to remove, renew and reinstall manual hand 泵. Materials: a. Whale manual Hand 泵 38毫米 - 2 set b. 软管 spring 1 1/2" - 2 Mtr c. SST 软管 clamp dia 50毫米 - 4 件 QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
55 · 11.1 · Labour and material to check, renew and install wiring (cabel 2.0mm - 60m) Material : a. Marine cable type 2.0mm - 60 meters b. Anchor light - 1 set c. Stern light - 1 unit d. Masthead light - 1 unit e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set Labour and material to check, renew and install wiring (cabel 2.0毫米 - 60米) Material : a. 船用 cable type 2.0毫米 - 60 meters b. Anchor light - 1 set c. Stern light - 1 个 d. Masthead light - 1 个 e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set QTY: — m
WHATSAPP
RM 60.06
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
56 · 11.2 · Labour and material to new wiring for spot light and install spot light.(Cable 2.5mm - 30meters) Material : a. Cable 2.5mm - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with bolt and nut - 5 pcs Labour and material to new wiring for spot light and install spot light.(Cable 2.5毫米 - 30meters) Material : a. Cable 2.5毫米 - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with 螺栓 and 螺母 - 5 件 QTY: — mtr
WHATSAPP
RM 60.06
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
57 · 11.3 · Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set 船用物料:Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
58 · 11.4 · Labour and material to remove and renew battery and terminal battery engine port and stbd. Material : a. Free Maintanace battery AMARON N150 - 2 unit b. Free Maintanace battery AMARON N120 - 1 unit c. Terminal Battery - 6 pcs d. Battery cable 21mm - 14mtr e. Circuit breaker BEP - 3 sets Labour and material to remove and renew 蓄电池 and terminal 蓄电池 engine port and stbd. Material : a. Free Maintanace 蓄电池 AMARON N150 - 2 个 b. Free Maintanace 蓄电池 AMARON N120 - 1 个 c. Terminal 蓄电池 - 6 件 d. 蓄电池 cable 21毫米 - 14mtr e. Circuit breaker BEP - 3 sets QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
59 · 12.1 · Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set 船用物料:Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set QTY: — RM
WHATSAPP
RM 15.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
60 · 12.2 · Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set 船用物料:Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set QTY: — RM
WHATSAPP
RM 15.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
61 · 12.3 · Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set 船用物料:Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set QTY: — RM
WHATSAPP
RM 15.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
62 · 13.1 · Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. Bolt and Nut 3/4" x 6" - 8pcs b. Repair kit - 2 tubes Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. 螺栓 and 螺母 3/4" x 6" - 8pcs b. Repair kit - 2 tubes QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
63 · 13.2 · Labour and materials to service, install and setting 2 unit engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube motor oil 10W40 - 4 botol b. Oil filter - 2 pcs c. Fuel filter - 2 pcs d. Seal - 2 pc e. Yamaha water separator filter - 2 unit f. Spark plug NGK LFR6A-11 - 16 pcs g. Thermostart assy - 4 pcs h. Zinc anode - 2 pcs i. Belting - 2 pcs j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 pcs l. Flywheel - 2 unit m. Primer bulb - 2 pcs Labour and materials to service, install and setting 2 个 engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube 电机 oil 10W40 - 4 botol b. Oil 滤芯 - 2 件 c. Fuel 滤芯 - 2 件 d. Seal - 2 件 e. Yamaha water separator 滤芯 - 2 个 f. Spark plug NGK LFR6A-11 - 16 件 g. Thermostart assy - 4 件 h. Zinc anode - 2 件 i. Belting - 2 件 j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 件 l. Flywheel - 2 个 m. 舷外机汽油手泵 - 2 件 QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
64 · 13.3 · Labour and material to remove, renew and install high and low pump engine port and stbd Material : a. Fuel pump comp 6AW-13907-11 - 2 unit b. Fuel pump assy 6CB-24410-01 - 2 unit Labour and material to remove, renew and install high and low 泵 engine port and stbd Material : a. Fuel 泵 comp 6AW-13907-11 - 2 个 b. Fuel 泵 assy 6CB-24410-01 - 2 个 QTY: — RM
WHATSAPP
RM 15.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
65 · 13.4 · Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 unit Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 个 QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
66 · 14.1 · Labour and material to fabricate new and install engine guard rail. Material : a. SST pipe 50mm - 12 meters b. SST elbow 50mm - 4 pcs c. SST bracket 0.1m - 8 pcs d. SST bolt and nut 1/2'' x 3'' - 16 pcs e. Repair kit- 4 set Labour and material to fabricate new and install engine guard rail. Material : a. SST 管 50毫米 - 12 meters b. SST elbow 50毫米 - 4 件 c. SST bracket 0.1米 - 8 件 d. SST 螺栓 and 螺母 1/2'' x 3'' - 16 件 e. Repair kit- 4 set QTY: — mh
WHATSAPP
RM 38.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
67 · 14.2 · Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter 船用物料:Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter QTY: — RM
WHATSAPP
—
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
68 · 15.1 · Labour and materials to renewal and reinstallation boat accessories on board. Material: a. Fire Extingusher 2 Kgs ABC - 2 Units b. Fire Extingusher 2 Kgs CO2 - 1 Unit c. Fender F3 - 4 pcs d. Japan rope soft type 16mm - 60m e. Bot Hook- 1 pcs f. Ring Buoy - 2 pcs g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 pcs j. Portable Search Light - 1 set k. Tool box Licota 143 Pcs - 1 set Labour and materials to renewal and reinstallation boat accessories on board. Material: a. 灭火器 2 公斤 ABC - 2 个 b. 灭火器 2 公斤 CO2 - 1 个 c. 护舷材 F3 - 4 件 d. 日本 船用绳索 软质型 16毫米 - 60米 e. Bot Hook- 1 件 f. 救生圈 - 2 件 g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 件 j. Portable 船用探照灯 - 1 set k. 工具箱 Licota 143 件 - 1 set QTY: — RM
WHATSAPP
RM 15.00
SHOPEE
NO VERIFIED PRICE
SEARCH SHOPEE →
LAZADA
NO VERIFIED PRICE
SEARCH LAZADA →
PINDUODUO
NO VERIFIED PRICE
SEARCH PINDUODUO →
ALIBABA
NO VERIFIED PRICE
SEARCH ALIBABA →
BUYEE JAPAN
NO VERIFIED PRICE
SEARCH BUYEE JAPAN →
NO SAFE BUY YET
No verified seller evidence available.
🔴 RED
HOLD
REVIEW / HOLD
ADVANCED / PURCHASE RECORDS — open only when needed
GANPS PURCHASE CONTROL · WHAT NEEDS ATTENTION NOW

Problems and incomplete deliveries are automatically placed above normal orders and completed items.

Showing all items
#ItemSelected vs AlternativeSignalPriceNext actionDo it now
1 10.2 · Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
2 10.3 · Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcs
SELECTED Shopee RM 117.00 · 52.5/100 · LOW
ALT #2 Shopee RM 122.76 · 50.9/100 · LOW
PRICE: SAVE RM 5.76 EACH LEAD TIME · NOT VERIFIED ⓘ
Ranked #1 because it leads #2 by 1.6 points and has the lower comparable MYR price.
HOLD RM 117.00 REVIEW — DO NOT PAY REVIEW →
3 10.4 · Labour and materials to remove, renew and reinstall manual hand pump. Materials: a. Whale manual Hand pump 38mm - 2 set b. Hose spring 1 1/2" - 2 Mtr c. SST hose clamp dia 50mm - 4 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
4 11.1 · Labour and material to check, renew and install wiring (cabel 2.0mm - 60m) Material : a. Marine cable type 2.0mm - 60 meters b. Anchor light - 1 set c. Stern light - 1 unit d. Masthead light - 1 unit e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
5 11.2 · Labour and material to new wiring for spot light and install spot light.(Cable 2.5mm - 30meters) Material : a. Cable 2.5mm - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with bolt and nut - 5 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
6 11.3 · Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
7 11.4 · Labour and material to remove and renew battery and terminal battery engine port and stbd. Material : a. Free Maintanace battery AMARON N150 - 2 unit b. Free Maintanace battery AMARON N120 - 1 unit c. Terminal Battery - 6 pcs d. Battery cable 21mm - 14mtr e. Circuit breaker BEP - 3 sets
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
8 12.1 · Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
9 12.2 · Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
10 12.3 · Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
11 13.1 · Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. Bolt and Nut 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
12 13.2 · Labour and materials to service, install and setting 2 unit engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube motor oil 10W40 - 4 botol b. Oil filter - 2 pcs c. Fuel filter - 2 pcs d. Seal - 2 pc e. Yamaha water separator filter - 2 unit f. Spark plug NGK LFR6A-11 - 16 pcs g. Thermostart assy - 4 pcs h. Zinc anode - 2 pcs i. Belting - 2 pcs j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 pcs l. Flywheel - 2 unit m. Primer bulb - 2 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
13 13.3 · Labour and material to remove, renew and install high and low pump engine port and stbd Material : a. Fuel pump comp 6AW-13907-11 - 2 unit b. Fuel pump assy 6CB-24410-01 - 2 unit
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
14 13.4 · Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 unit
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
15 14.1 · Labour and material to fabricate new and install engine guard rail. Material : a. SST pipe 50mm - 12 meters b. SST elbow 50mm - 4 pcs c. SST bracket 0.1m - 8 pcs d. SST bolt and nut 1/2'' x 3'' - 16 pcs e. Repair kit- 4 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
16 14.2 · Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
17 15.1 · Labour and materials to renewal and reinstallation boat accessories on board. Material: a. Fire Extingusher 2 Kgs ABC - 2 Units b. Fire Extingusher 2 Kgs CO2 - 1 Unit c. Fender F3 - 4 pcs d. Japan rope soft type 16mm - 60m e. Bot Hook- 1 pcs f. Ring Buoy - 2 pcs g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 pcs j. Portable Search Light - 1 set k. Tool box Licota 143 Pcs - 1 set
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
18 4.5 · Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
19 4.6 · Labour and material to respray paint motor well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
20 4.7 · Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
21 4.8 · Labour and material to remove, renew and reinstall inspection cover motor well. Material : a. Deck Inspection Hatch 353mm X 606mm - 1 unit b. Deck Inspection Hatch round dia 8'' - 2 sets
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
22 6.2 · Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 kg
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
23 6.6 · Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST bolt and nut 1/4" x 2'' - 42 Sets
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
24 6.8 · Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3mm 4'' x 8'' - 4 sheet b. SST Bolt and nut 1/2'' x 2 '' - 16 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
25 6.9 · Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
26 7.1 · Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon rope 9mm - 20 meter
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
27 7.5 · Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8m x 1.5m - 1 sheet
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
28 9.1 · Labour and material to renew and reistall inlet hose, overflow hose and oil level hose fuel tank port and stbd. Material: a. SST stop valve 50mm - 2 pcs b. SST Nipple - 2 Pcs c. Fuel Hose Dia 50mm - 2 Length d. SST hose clamp dia 50mm – 4 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
29 9.11 · Labour and material to renew fuel hose from fuel tank to water separator filter engine port and stbd. Material: a. UNIGAWA Fuel hose 12mm x 7' - 12 meter b. SST hose clamp 15mm - 18pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
30 9.2 · Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
31 9.4 · Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3mm - 12m² b. SST plate 9mm - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST bolt and nut 1/2'' x 2'' - 24 pcs
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
32 9.5 · Manhole cover and renew oil resisten gasket
SELECTED — PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
HOLD — REVIEW — DO NOT PAY REVIEW →
33 1.1 · To docking and undocking boat.
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
34 1.2 · Docking chargers 30 days.
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
35 1.3 · Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
36 10.1 · Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
37 2.1 · To scrape marine growth,wash down and clean underwater hull with HP freshwater (22.66m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
38 2.2 · Labour to grinding underwater hull to bare fibre. (22.66m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
39 2.3 · Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 kg
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
40 2.4 · Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
41 2.5 · To wash down after grinding and before painting underwater hull area.(22.66m2)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
42 2.6 · Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
43 2.7 · Labour to reposition chock/block to complete coverage painting.
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
44 3.1 · Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
45 3.2 · To grinding the whole ship side area to sound paint. (14.24m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
46 3.3 · Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
47 3.4 · Labour to grinding shipside to smooth before painting. (min. charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
48 3.5 · To wash down after grinding and before painting shipside area. (14.24m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
49 3.6 · Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
50 4.1 · Fresh water clean transom and motor well (min.charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
51 4.2 · Labour and material to cutting motor well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12mm - 6 sheet
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
52 4.3 · To grinding the whole transom and motorwell area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 kg
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
53 4.4 · Cleaning the transom and motor well with HP fresh water before painting. (min.charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
54 5.1 · Labour and material to repair fender port and stbd. Material; a.. Hyphalon cloth 1.5mm - 26m b.. Rima Tic SC 2000 - 20 kg c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud Bolt and Nut 3/4" x 10" - 50 Sets
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
55 5.2 · Labour and material to repair bracket fibreglass below fenders Material; a.. W/P plywood 12mm - 2 sheets b.. 3mm (T) x 25mm Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 kgs d.. Resin - 30 kgs e.. Hardener - 0.5 kg f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
56 6.1 · Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
57 6.3 · Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
58 6.4 · Fresh water cleaning before painting. (18m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
59 6.5 · To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
60 7.2 · Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
61 7.3 · Fresh water clean transom stand deck awning before painting (min.charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
62 7.4 · Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
63 8.1 · Labour and material to repair mounting gpmg Material; a. SST Bolt Nut - 9 pcs b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
64 8.2 · Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
65 8.3 · Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
66 9.1 · Labour to pump out fuel from the fuel tank before cleaning.
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
67 9.3 · Labour to remove the fuel tank bracket bolt and nuts, hoses, piping in the way of tank removal and fitting back after completion
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
68 9.6 · Labour to carry out pressure test on tanks. (Min. charge 5m³)
SELECTED CONTRACTOR / QUOTE PRICE —
ALT #2 — PRICE —
PRICE DELTA: NOT AVAILABLE LEAD TIME · NOT VERIFIED ⓘ
No second seller result available for comparison.
CHECK FIRST — GET CONTRACTOR QUOTE QUOTE →
GANPS PURCHASE BOARD · AUTOMATIC PRIORITY

Start at #1 — work downward

GANPS does not need to open items one by one. The whole uploaded file is already arranged below.
🟢 GREEN = BUY NOW · 🟡 YELLOW = CHECK FIRST / GET QUOTE · 🔴 RED = HOLD — DO NOT PAY.
For product rows, CLICK & PAY opens the real seller listing. Quantity and source amount stay beside the button so GANPS can check before paying.
0GREEN · BUY NOW
36YELLOW · CHECK FIRST
32RED · HOLD
#1 YELLOW
GET QUOTE
1.1 · To docking and undocking boat.
Need: — RM
Source rate: RM 1069.90 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#2 YELLOW
GET QUOTE
1.2 · Docking chargers 30 days.
Need: — RM
Source rate: RM 86.90 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#3 YELLOW
GET QUOTE
1.3 · Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
Need: — RM
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#4 YELLOW
GET QUOTE
10.1 · Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
Need: — m2
Source rate: RM 42.79 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#5 YELLOW
GET QUOTE
2.1 · To scrape marine growth,wash down and clean underwater hull with HP freshwater (22.66m²)
Need: — m2
Source rate: RM 7.26 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#6 YELLOW
GET QUOTE
2.2 · Labour to grinding underwater hull to bare fibre. (22.66m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#7 YELLOW
GET QUOTE
2.3 · Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 kg
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#8 YELLOW
GET QUOTE
2.4 · Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#9 YELLOW
GET QUOTE
2.5 · To wash down after grinding and before painting underwater hull area.(22.66m2)
Need: — m2
Source rate: RM 4.80 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#10 YELLOW
GET QUOTE
2.6 · Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
Need: — RM
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#11 YELLOW
GET QUOTE
2.7 · Labour to reposition chock/block to complete coverage painting.
Need: — block
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#12 YELLOW
GET QUOTE
3.1 · Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
Need: — m2
Source rate: RM 7.26 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#13 YELLOW
GET QUOTE
3.2 · To grinding the whole ship side area to sound paint. (14.24m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#14 YELLOW
GET QUOTE
3.3 · Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#15 YELLOW
GET QUOTE
3.4 · Labour to grinding shipside to smooth before painting. (min. charge 10m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#16 YELLOW
GET QUOTE
3.5 · To wash down after grinding and before painting shipside area. (14.24m²)
Need: — m2
Source rate: RM 4.80 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#17 YELLOW
GET QUOTE
3.6 · Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
Need: — RM
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#18 YELLOW
GET QUOTE
4.1 · Fresh water clean transom and motor well (min.charge 10m²)
Need: — m2
Source rate: RM 4.80 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#19 YELLOW
GET QUOTE
4.2 · Labour and material to cutting motor well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12mm - 6 sheet
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#20 YELLOW
GET QUOTE
4.3 · To grinding the whole transom and motorwell area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 kg
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#21 YELLOW
GET QUOTE
4.4 · Cleaning the transom and motor well with HP fresh water before painting. (min.charge 10m²)
Need: — m2
Source rate: RM 4.80 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#22 YELLOW
GET QUOTE
5.1 · Labour and material to repair fender port and stbd. Material; a.. Hyphalon cloth 1.5mm - 26m b.. Rima Tic SC 2000 - 20 kg c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud Bolt and Nut 3/4" x 10" - 50 Sets
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#23 YELLOW
GET QUOTE
5.2 · Labour and material to repair bracket fibreglass below fenders Material; a.. W/P plywood 12mm - 2 sheets b.. 3mm (T) x 25mm Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 kgs d.. Resin - 30 kgs e.. Hardener - 0.5 kg f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#24 YELLOW
GET QUOTE
6.1 · Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#25 YELLOW
GET QUOTE
6.3 · Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#26 YELLOW
GET QUOTE
6.4 · Fresh water cleaning before painting. (18m²)
Need: — RM
Source rate: RM 4.80 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#27 YELLOW
GET QUOTE
6.5 · To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
Need: — RM
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#28 YELLOW
GET QUOTE
7.2 · Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#29 YELLOW
GET QUOTE
7.3 · Fresh water clean transom stand deck awning before painting (min.charge 10m²)
Need: — m2
Source rate: RM 4.80 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#30 YELLOW
GET QUOTE
7.4 · Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
Need: — RM
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#31 YELLOW
GET QUOTE
8.1 · Labour and material to repair mounting gpmg Material; a. SST Bolt Nut - 9 pcs b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#32 YELLOW
GET QUOTE
8.2 · Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
Need: — m2
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#33 YELLOW
GET QUOTE
8.3 · Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
Need: — RM
Source rate: — · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#34 YELLOW
GET QUOTE
9.1 · Labour to pump out fuel from the fuel tank before cleaning.
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#35 YELLOW
GET QUOTE
9.3 · Labour to remove the fuel tank bracket bolt and nuts, hoses, piping in the way of tank removal and fitting back after completion
Need: — mh
Source rate: RM 38.00 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#36 YELLOW
GET QUOTE
9.6 · Labour to carry out pressure test on tanks. (Min. charge 5m³)
Need: — m³
Source rate: RM 36.96 · Source item total: —
Service/work item — confirm contractor quotation; no online product payment is expected.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
GET QUOTE
NO ONLINE PAY
Service / work item
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#37 RED
HOLD
10.2 · Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
Need: — RM
Source rate: — · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#38 RED
HOLD
10.3 · Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
Suggested: Shopee
Marine Bilge Pump 2300GPH 12V & 24V, Manual (Non-Auto)
REVIEW AVAILABLE
#1 · 52.5 / 100 · CHECKLOW CONFIDENCE · 30.0%
PRICE35.0 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 30.0%
TIE-BREAKHighest eligible total score.
HOLD Do not pay: specification evidence is too weak.
DECISION GAP
VERY CLOSE
+1.6 pts
#1 leads #2 by 1.6 score point(s).
#1 is also the cheapest visible seller at RM 117.00.
No Aqua history yet · neutral score
WHY #1?
Ranked #1 because it leads #2 by 1.6 points and has the lower comparable MYR price.
Why #1: Highest eligible total score. · Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
PLAIN-LANGUAGE EXPLANATION
Price: RM 117.00 is the lowest comparable MYR price, giving 35.0/35. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 30.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #1. Highest eligible total score.
MYR 117.00 each
HOW RANKING + CONFIDENCE WORKS

Score /100: Spec 40 + Price 35 + Delivery history 15 + Problem history 10.

Missing Aqua history: neutral score (7.5/15 delivery + 5/10 problem), but confidence is lower because there is less evidence.

Weak specification: COMPONENT / REVIEW is LOW confidence, never GREEN / BUY NOW, and ranks below any available non-weak match before score comparison.

Equal-score tie-break order: higher spec score → higher confidence → lower Aqua problem rate → better Aqua delivery rate → lower visible price → larger Aqua history sample → alphabetical seller name.

Confidence: HIGH = strong evidence across price/spec/history; MEDIUM = usable but limited evidence; LOW = incomplete or weak-spec evidence.

COMPARE ALL 7 SELLERS — RANKED
RankSellerScoreConfidencePriceSpecDeliveryProblemWhy this rankAction
#1 Shopee
REVIEW
PRICE35.0 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 30.0%
TIE-BREAKHighest eligible total score.
52.5 / 100
CHECK
LOW
30.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
RM 117.00
35.0 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY #1?
Ranked #1 because it leads #2 by 1.6 points and has the lower comparable MYR price.
Highest eligible total score.
Price: RM 117.00 is the lowest comparable MYR price, giving 35.0/35. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 30.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #1. Highest eligible total score.
OPEN / PAY →
#2 Shopee
REVIEW
PRICE33.4 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 30.0%
TIE-BREAKLower total score than the seller above.
50.9 / 100
CHECK
LOW
30.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
RM 122.76
33.4 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY NOT #1?
Not #1 because it scored 1.6 points lower and its comparable MYR price is higher.
Lower total score than the seller above.
Price: RM 122.76 is 4.9% above the lowest comparable MYR price, giving 33.4/35. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 30.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #2. Lower total score than the seller above.
OPEN / PAY →
#3 Shopee
REVIEW
PRICE14.0 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 30.0%
TIE-BREAKLower total score than the seller above.
31.5 / 100
REVIEW
LOW
30.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
RM 291.90
14.0 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY NOT #1?
Not #1 because it scored 21.0 points lower and its comparable MYR price is higher.
Lower total score than the seller above.
Price: RM 291.90 is 149.5% above the lowest comparable MYR price, giving 14.0/35. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 30.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #3. Lower total score than the seller above.
OPEN / PAY →
#4 Shopee
REVIEW
PRICE3.7 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 30.0%
TIE-BREAKLower total score than the seller above.
21.2 / 100
REVIEW
LOW
30.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
RM 1104.20
3.7 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY NOT #1?
Not #1 because it scored 31.3 points lower and its comparable MYR price is higher.
Lower total score than the seller above.
Price: RM 1104.20 is 843.8% above the lowest comparable MYR price, giving 3.7/35. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 30.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #4. Lower total score than the seller above.
OPEN / PAY →
#5 Made-in-China
REVIEW
PRICE0.0 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 5.0%
TIE-BREAKLower total score than the seller above.
17.5 / 100
REVIEW
LOW
5.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
CHECK
0 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY NOT #1?
Not #1 because it scored 35.0 points lower and has lower evidence confidence.
Lower total score than the seller above.
Price: no visible price was available, so this seller received 0/35 for price and needs a price check. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 5.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #5. Lower total score than the seller above.
OPEN / PAY →
#6 Made-in-China
REVIEW
PRICE0.0 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 5.0%
TIE-BREAKEqual evidence; stable alphabetical seller order is used.
17.5 / 100
REVIEW
LOW
5.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
CHECK
0 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY NOT #1?
Not #1 because it scored 35.0 points lower and has lower evidence confidence.
Equal evidence; stable alphabetical seller order is used.
Price: no visible price was available, so this seller received 0/35 for price and needs a price check. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 5.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #6. Equal evidence; stable alphabetical seller order is used.
OPEN / PAY →
#7 Made-in-China
REVIEW
PRICE0.0 / 35
SPEC5.0 / 40
DELIVERY7.5 / 15
PROBLEM5.0 / 10
CONFIDENCELOW · 5.0%
TIE-BREAKEqual evidence; stable alphabetical seller order is used.
17.5 / 100
REVIEW
LOW
5.0%
Specification evidence is weak; manual verification is required. No Aqua purchase history yet.
CHECK
0 / 35
5.0 / 40 7.5 / 15 5.0 / 10
WHY NOT #1?
Not #1 because it scored 35.0 points lower and has lower evidence confidence.
Equal evidence; stable alphabetical seller order is used.
Price: no visible price was available, so this seller received 0/35 for price and needs a price check. Specification: weak review evidence, giving only 5.0/40. This seller is kept below non-weak matches before score comparison. Delivery history: no Aqua history yet, so a neutral 7.5/15 was used. Problem history: no Aqua history yet, so a neutral 5.0/10 was used instead of assuming good or bad performance. Confidence: LOW at 5.0% because specification evidence is weak; manual verification is required. No Aqua purchase history yet. Rank: #7. Equal evidence; stable alphabetical seller order is used.
OPEN / PAY →
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#39 RED
HOLD
10.4 · Labour and materials to remove, renew and reinstall manual hand pump. Materials: a. Whale manual Hand pump 38mm - 2 set b. Hose spring 1 1/2" - 2 Mtr c. SST hose clamp dia 50mm - 4 pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#40 RED
HOLD
11.1 · Labour and material to check, renew and install wiring (cabel 2.0mm - 60m) Material : a. Marine cable type 2.0mm - 60 meters b. Anchor light - 1 set c. Stern light - 1 unit d. Masthead light - 1 unit e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
Need: — m
Source rate: RM 60.06 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#41 RED
HOLD
11.2 · Labour and material to new wiring for spot light and install spot light.(Cable 2.5mm - 30meters) Material : a. Cable 2.5mm - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with bolt and nut - 5 pcs
Need: — mtr
Source rate: RM 60.06 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#42 RED
HOLD
11.3 · Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#43 RED
HOLD
11.4 · Labour and material to remove and renew battery and terminal battery engine port and stbd. Material : a. Free Maintanace battery AMARON N150 - 2 unit b. Free Maintanace battery AMARON N120 - 1 unit c. Terminal Battery - 6 pcs d. Battery cable 21mm - 14mtr e. Circuit breaker BEP - 3 sets
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#44 RED
HOLD
12.1 · Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
Need: — RM
Source rate: RM 15.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#45 RED
HOLD
12.2 · Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
Need: — RM
Source rate: RM 15.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#46 RED
HOLD
12.3 · Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
Need: — RM
Source rate: RM 15.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#47 RED
HOLD
13.1 · Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. Bolt and Nut 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#48 RED
HOLD
13.2 · Labour and materials to service, install and setting 2 unit engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube motor oil 10W40 - 4 botol b. Oil filter - 2 pcs c. Fuel filter - 2 pcs d. Seal - 2 pc e. Yamaha water separator filter - 2 unit f. Spark plug NGK LFR6A-11 - 16 pcs g. Thermostart assy - 4 pcs h. Zinc anode - 2 pcs i. Belting - 2 pcs j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 pcs l. Flywheel - 2 unit m. Primer bulb - 2 pcs
Need: — RM
Source rate: — · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#49 RED
HOLD
13.3 · Labour and material to remove, renew and install high and low pump engine port and stbd Material : a. Fuel pump comp 6AW-13907-11 - 2 unit b. Fuel pump assy 6CB-24410-01 - 2 unit
Need: — RM
Source rate: RM 15.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#50 RED
HOLD
13.4 · Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 unit
Need: — RM
Source rate: — · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#51 RED
HOLD
14.1 · Labour and material to fabricate new and install engine guard rail. Material : a. SST pipe 50mm - 12 meters b. SST elbow 50mm - 4 pcs c. SST bracket 0.1m - 8 pcs d. SST bolt and nut 1/2'' x 3'' - 16 pcs e. Repair kit- 4 set
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#52 RED
HOLD
14.2 · Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
Need: — RM
Source rate: — · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#53 RED
HOLD
15.1 · Labour and materials to renewal and reinstallation boat accessories on board. Material: a. Fire Extingusher 2 Kgs ABC - 2 Units b. Fire Extingusher 2 Kgs CO2 - 1 Unit c. Fender F3 - 4 pcs d. Japan rope soft type 16mm - 60m e. Bot Hook- 1 pcs f. Ring Buoy - 2 pcs g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 pcs j. Portable Search Light - 1 set k. Tool box Licota 143 Pcs - 1 set
Need: — RM
Source rate: RM 15.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#54 RED
HOLD
4.5 · Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
Need: — RM
Source rate: — · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#55 RED
HOLD
4.6 · Labour and material to respray paint motor well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
Need: — RM
Source rate: — · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#56 RED
HOLD
4.7 · Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#57 RED
HOLD
4.8 · Labour and material to remove, renew and reinstall inspection cover motor well. Material : a. Deck Inspection Hatch 353mm X 606mm - 1 unit b. Deck Inspection Hatch round dia 8'' - 2 sets
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#58 RED
HOLD
6.2 · Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 kg
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#59 RED
HOLD
6.6 · Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST bolt and nut 1/4" x 2'' - 42 Sets
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#60 RED
HOLD
6.8 · Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3mm 4'' x 8'' - 4 sheet b. SST Bolt and nut 1/2'' x 2 '' - 16 pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#61 RED
HOLD
6.9 · Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#62 RED
HOLD
7.1 · Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon rope 9mm - 20 meter
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#63 RED
HOLD
7.5 · Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8m x 1.5m - 1 sheet
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#64 RED
HOLD
9.1 · Labour and material to renew and reistall inlet hose, overflow hose and oil level hose fuel tank port and stbd. Material: a. SST stop valve 50mm - 2 pcs b. SST Nipple - 2 Pcs c. Fuel Hose Dia 50mm - 2 Length d. SST hose clamp dia 50mm – 4 pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#65 RED
HOLD
9.11 · Labour and material to renew fuel hose from fuel tank to water separator filter engine port and stbd. Material: a. UNIGAWA Fuel hose 12mm x 7' - 12 meter b. SST hose clamp 15mm - 18pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#66 RED
HOLD
9.2 · Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#67 RED
HOLD
9.4 · Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3mm - 12m² b. SST plate 9mm - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST bolt and nut 1/2'' x 2'' - 24 pcs
Need: — mh
Source rate: RM 38.00 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
#68 RED
HOLD
9.5 · Manhole cover and renew oil resisten gasket
Need: — set
Source rate: RM 80.85 · Source item total: —
Item data needs review before purchase.
No verified seller yet.
Keep this item on HOLD until seller evidence is available.
HOLD
DO NOT PAY
✓ I BOUGHT / ORDERED THIS — RECORD PURCHASE
Saving automatically updates the Aqua Purchase Workspace with this bought quantity and paid price.
ADMIN / TECHNICAL WORKFLOW DETAILS — open only when needed
Items68
Validation issues112
Researched items1
Seller links7
Candidates0
Decisions0
STEP 1 OF 7

Source / Job Intake

Repair Job

JOB-RH61-2026-001

Vessel

SUB-CON BOAT RH61

Output Profile

RH47_LOCKED

Workflow Status

NEEDS REVIEW

This workspace is attached to the existing Aqua Marine repair job. Job, document, PO and audit records remain in Aqua Marine.

STEP 2 OF 7

Import & Extract Procurement Items

Shadowing previous ProcurePilot: load existing Aqua job scope or add a source item without creating a separate procurement system.

OPEN AQUA DOCUMENTSUPLOAD SOURCE DOCUMENT
+ ADD MANUAL PROCUREMENT ITEM
STEP 3 OF 7

Review & Complete Item Data

112 required field issue(s) remain. Supported values stay intact; blank fields remain blank until evidence is entered.

No.DescriptionUnitRate RefQuantityRate RMState
1.1To docking and undocking boat.
船用物料:To docking and undocking boat.
RM2.1NEEDS_REVIEW
1.2Docking chargers 30 days.
船用物料:Docking chargers 30 days.
RM2.2NEEDS_REVIEW
1.3Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
船用物料:Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
RM4.7.2NEEDS_REVIEW
2.1To scrape marine growth,wash down and clean underwater hull with HP freshwater (22.66m²)
To scrape 船用 growth,wash down and clean underwater hull with HP freshwater (22.66m²)
m23.3NEEDS_REVIEW
2.2Labour to grinding underwater hull to bare fibre. (22.66m²)
船用物料:Labour to grinding underwater hull to bare fibre. (22.66m²)
m23.6(a)NEEDS_REVIEW
2.3Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 kg
Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 公斤
mh41.0NEEDS_REVIEW
2.4Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
船用物料:Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
m23.6(a)NEEDS_REVIEW
2.5To wash down after grinding and before painting underwater hull area.(22.66m2)
船用物料:To wash down after grinding and before painting underwater hull area.(22.66m2)
m23.2NEEDS_REVIEW
2.6Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
船用物料:Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
RM3.13(a)NEEDS_REVIEW
2.7Labour to reposition chock/block to complete coverage painting.
船用物料:Labour to reposition chock/block to complete coverage painting.
block2.4NEEDS_REVIEW
3.1Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
船用物料:Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
m23.3NEEDS_REVIEW
3.2To grinding the whole ship side area to sound paint. (14.24m²)
船用物料:To grinding the whole ship side area to sound paint. (14.24m²)
m23.6(a)NEEDS_REVIEW
3.3Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
船用物料:Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
mh41.0NEEDS_REVIEW
3.4Labour to grinding shipside to smooth before painting. (min. charge 10m²)
船用物料:Labour to grinding shipside to smooth before painting. (min. charge 10m²)
m23.6(a)NEEDS_REVIEW
3.5To wash down after grinding and before painting shipside area. (14.24m²)
船用物料:To wash down after grinding and before painting shipside area. (14.24m²)
m23.2NEEDS_REVIEW
3.6Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
船用物料:Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
RM3.13(a)NEEDS_REVIEW
4.1Fresh water clean transom and motor well (min.charge 10m²)
Fresh water clean transom and 电机 well (min.charge 10m²)
m23.2NEEDS_REVIEW
4.2Labour and material to cutting motor well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12mm - 6 sheet
Labour and material to cutting 电机 well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12毫米 - 6 sheet
mh41.0NEEDS_REVIEW
4.3To grinding the whole transom and motorwell area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 kg
To grinding the whole transom and 电机well area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 公斤
m23.6(a)NEEDS_REVIEW
4.4Cleaning the transom and motor well with HP fresh water before painting. (min.charge 10m²)
Cleaning the transom and 电机 well with HP fresh water before painting. (min.charge 10m²)
m23.2NEEDS_REVIEW
4.5Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
船用物料:Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
RM3.13(a)NEEDS_REVIEW
4.6Labour and material to respray paint motor well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
Labour and material to respray paint 电机 well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
RM3.13(a)NEEDS_REVIEW
4.7Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 pcs
Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 件
mh41.0NEEDS_REVIEW
4.8Labour and material to remove, renew and reinstall inspection cover motor well. Material : a. Deck Inspection Hatch 353mm X 606mm - 1 unit b. Deck Inspection Hatch round dia 8'' - 2 sets
Labour and material to remove, renew and reinstall inspection cover 电机 well. Material : a. Deck Inspection Hatch 353毫米 X 606毫米 - 1 个 b. Deck Inspection Hatch round dia 8'' - 2 sets
mh41.0NEEDS_REVIEW
5.1Labour and material to repair fender port and stbd. Material; a.. Hyphalon cloth 1.5mm - 26m b.. Rima Tic SC 2000 - 20 kg c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud Bolt and Nut 3/4" x 10" - 50 Sets
Labour and material to repair 护舷材 port and stbd. Material; a.. Hyphalon cloth 1.5毫米 - 26米 b.. Rima Tic SC 2000 - 20 公斤 c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud 螺栓 and 螺母 3/4" x 10" - 50 Sets
mh41.0NEEDS_REVIEW
5.2Labour and material to repair bracket fibreglass below fenders Material; a.. W/P plywood 12mm - 2 sheets b.. 3mm (T) x 25mm Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 kgs d.. Resin - 30 kgs e.. Hardener - 0.5 kg f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
Labour and material to repair bracket fibreglass below 护舷材s Material; a.. W/P plywood 12毫米 - 2 sheets b.. 3毫米 (T) x 25毫米 Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 公斤 d.. Resin - 30 公斤 e.. Hardener - 0.5 公斤 f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
mh41.0NEEDS_REVIEW
6.1Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
船用物料:Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
m23.6(a)NEEDS_REVIEW
6.2Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 kg
Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 公斤
mh41.0NEEDS_REVIEW
6.3Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
船用物料:Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
m23.6(a)NEEDS_REVIEW
6.4Fresh water cleaning before painting. (18m²)
船用物料:Fresh water cleaning before painting. (18m²)
RM3.2NEEDS_REVIEW
6.5To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
船用物料:To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
RM3.13(a)NEEDS_REVIEW
6.6Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST bolt and nut 1/4" x 2'' - 42 Sets
Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST 螺栓 and 螺母 1/4" x 2'' - 42 Sets
mh41.0NEEDS_REVIEW
6.8Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3mm 4'' x 8'' - 4 sheet b. SST Bolt and nut 1/2'' x 2 '' - 16 pcs
Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3毫米 4'' x 8'' - 4 sheet b. SST 螺栓 and 螺母 1/2'' x 2 '' - 16 件
mh41.0NEEDS_REVIEW
6.9Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
船用物料:Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
mh41.0NEEDS_REVIEW
7.1Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon rope 9mm - 20 meter
Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon 船用绳索 9毫米 - 20 meter
mh41.0NEEDS_REVIEW
7.2Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
船用物料:Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
m23.6(a)NEEDS_REVIEW
7.3Fresh water clean transom stand deck awning before painting (min.charge 10m²)
船用物料:Fresh water clean transom stand deck awning before painting (min.charge 10m²)
m23.2NEEDS_REVIEW
7.4Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
船用物料:Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
RM3.13(a)NEEDS_REVIEW
7.5Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8m x 1.5m - 1 sheet
Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8米 x 1.5米 - 1 sheet
mh41.0NEEDS_REVIEW
8.1Labour and material to repair mounting gpmg Material; a. SST Bolt Nut - 9 pcs b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
Labour and material to repair mounting gpmg Material; a. SST 螺栓 螺母 - 9 件 b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
mh41.0NEEDS_REVIEW
8.2Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
船用物料:Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
m23.6(a)NEEDS_REVIEW
8.3Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
船用物料:Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
RM3.13(a)NEEDS_REVIEW
9.1Labour to pump out fuel from the fuel tank before cleaning.
Labour to 泵 out fuel from the fuel tank before cleaning.
mh41.0NEEDS_REVIEW
9.2Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
船用物料:Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
mh41.0NEEDS_REVIEW
9.3Labour to remove the fuel tank bracket bolt and nuts, hoses, piping in the way of tank removal and fitting back after completion
Labour to remove the fuel tank bracket 螺栓 and 螺母s, 软管s, piping in the way of tank removal and fitting back after completion
mh41.0NEEDS_REVIEW
9.4Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3mm - 12m² b. SST plate 9mm - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST bolt and nut 1/2'' x 2'' - 24 pcs
Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3毫米 - 12m² b. SST plate 9毫米 - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST 螺栓 and 螺母 1/2'' x 2'' - 24 件
mh41.0NEEDS_REVIEW
9.5Manhole cover and renew oil resisten gasket
船用物料:Manhole cover and renew oil resisten gasket
set15.5.2NEEDS_REVIEW
9.6Labour to carry out pressure test on tanks. (Min. charge 5m³)
船用物料:Labour to carry out pressure test on tanks. (Min. charge 5m³)
m³15.4NEEDS_REVIEW
9.1Labour and material to renew and reistall inlet hose, overflow hose and oil level hose fuel tank port and stbd. Material: a. SST stop valve 50mm - 2 pcs b. SST Nipple - 2 Pcs c. Fuel Hose Dia 50mm - 2 Length d. SST hose clamp dia 50mm – 4 pcs
Labour and material to renew and reistall inlet 软管, overflow 软管 and oil level 软管 fuel tank port and stbd. Material: a. SST stop 阀门 50毫米 - 2 件 b. SST Nipple - 2 件 c. Fuel 软管 Dia 50毫米 - 2 Length d. SST 软管 clamp dia 50毫米 – 4 件
mh41.0NEEDS_REVIEW
9.11Labour and material to renew fuel hose from fuel tank to water separator filter engine port and stbd. Material: a. UNIGAWA Fuel hose 12mm x 7' - 12 meter b. SST hose clamp 15mm - 18pcs
Labour and material to renew fuel 软管 from fuel tank to water separator 滤芯 engine port and stbd. Material: a. UNIGAWA Fuel 软管 12毫米 x 7' - 12 meter b. SST 软管 clamp 15毫米 - 18pcs
mh41.0NEEDS_REVIEW
10.1Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
船用物料:Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
m236.1NEEDS_REVIEW
10.2Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
船用物料:Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
RM3.13(b)NEEDS_REVIEW
10.3Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcs
Labour and material to dismantle and install new bilges 泵. Material : a. 船用舱底泵 - 1 set b. Spring 软管 1'' - 12 Mtrs c. SST Clamp 30毫米 - 8 件 d. Seaflo Bilgest 泵 Switch 3 Ways - 1 件
mh41.0NEEDS_REVIEW
10.4Labour and materials to remove, renew and reinstall manual hand pump. Materials: a. Whale manual Hand pump 38mm - 2 set b. Hose spring 1 1/2" - 2 Mtr c. SST hose clamp dia 50mm - 4 pcs
Labour and materials to remove, renew and reinstall manual hand 泵. Materials: a. Whale manual Hand 泵 38毫米 - 2 set b. 软管 spring 1 1/2" - 2 Mtr c. SST 软管 clamp dia 50毫米 - 4 件
mh41.0NEEDS_REVIEW
11.1Labour and material to check, renew and install wiring (cabel 2.0mm - 60m) Material : a. Marine cable type 2.0mm - 60 meters b. Anchor light - 1 set c. Stern light - 1 unit d. Masthead light - 1 unit e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
Labour and material to check, renew and install wiring (cabel 2.0毫米 - 60米) Material : a. 船用 cable type 2.0毫米 - 60 meters b. Anchor light - 1 set c. Stern light - 1 个 d. Masthead light - 1 个 e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
m40.1NEEDS_REVIEW
11.2Labour and material to new wiring for spot light and install spot light.(Cable 2.5mm - 30meters) Material : a. Cable 2.5mm - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with bolt and nut - 5 pcs
Labour and material to new wiring for spot light and install spot light.(Cable 2.5毫米 - 30meters) Material : a. Cable 2.5毫米 - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with 螺栓 and 螺母 - 5 件
mtr40.1NEEDS_REVIEW
11.3Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
船用物料:Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
mh41.0NEEDS_REVIEW
11.4Labour and material to remove and renew battery and terminal battery engine port and stbd. Material : a. Free Maintanace battery AMARON N150 - 2 unit b. Free Maintanace battery AMARON N120 - 1 unit c. Terminal Battery - 6 pcs d. Battery cable 21mm - 14mtr e. Circuit breaker BEP - 3 sets
Labour and material to remove and renew 蓄电池 and terminal 蓄电池 engine port and stbd. Material : a. Free Maintanace 蓄电池 AMARON N150 - 2 个 b. Free Maintanace 蓄电池 AMARON N120 - 1 个 c. Terminal 蓄电池 - 6 件 d. 蓄电池 cable 21毫米 - 14mtr e. Circuit breaker BEP - 3 sets
mh41.0NEEDS_REVIEW
12.1Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
船用物料:Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
RM43.0NEEDS_REVIEW
12.2Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
船用物料:Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
RM43.0NEEDS_REVIEW
12.3Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
船用物料:Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
RM43.0NEEDS_REVIEW
13.1Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. Bolt and Nut 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. 螺栓 and 螺母 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
mh41.0NEEDS_REVIEW
13.2Labour and materials to service, install and setting 2 unit engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube motor oil 10W40 - 4 botol b. Oil filter - 2 pcs c. Fuel filter - 2 pcs d. Seal - 2 pc e. Yamaha water separator filter - 2 unit f. Spark plug NGK LFR6A-11 - 16 pcs g. Thermostart assy - 4 pcs h. Zinc anode - 2 pcs i. Belting - 2 pcs j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 pcs l. Flywheel - 2 unit m. Primer bulb - 2 pcs
Labour and materials to service, install and setting 2 个 engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube 电机 oil 10W40 - 4 botol b. Oil 滤芯 - 2 件 c. Fuel 滤芯 - 2 件 d. Seal - 2 件 e. Yamaha water separator 滤芯 - 2 个 f. Spark plug NGK LFR6A-11 - 16 件 g. Thermostart assy - 4 件 h. Zinc anode - 2 件 i. Belting - 2 件 j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 件 l. Flywheel - 2 个 m. 舷外机汽油手泵 - 2 件
RM46.0NEEDS_REVIEW
13.3Labour and material to remove, renew and install high and low pump engine port and stbd Material : a. Fuel pump comp 6AW-13907-11 - 2 unit b. Fuel pump assy 6CB-24410-01 - 2 unit
Labour and material to remove, renew and install high and low 泵 engine port and stbd Material : a. Fuel 泵 comp 6AW-13907-11 - 2 个 b. Fuel 泵 assy 6CB-24410-01 - 2 个
RM43.0NEEDS_REVIEW
13.4Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 unit
Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 个
RM46.0NEEDS_REVIEW
14.1Labour and material to fabricate new and install engine guard rail. Material : a. SST pipe 50mm - 12 meters b. SST elbow 50mm - 4 pcs c. SST bracket 0.1m - 8 pcs d. SST bolt and nut 1/2'' x 3'' - 16 pcs e. Repair kit- 4 set
Labour and material to fabricate new and install engine guard rail. Material : a. SST 管 50毫米 - 12 meters b. SST elbow 50毫米 - 4 件 c. SST bracket 0.1米 - 8 件 d. SST 螺栓 and 螺母 1/2'' x 3'' - 16 件 e. Repair kit- 4 set
mh41.0NEEDS_REVIEW
14.2Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
船用物料:Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
RM3.13 (a)NEEDS_REVIEW
15.1Labour and materials to renewal and reinstallation boat accessories on board. Material: a. Fire Extingusher 2 Kgs ABC - 2 Units b. Fire Extingusher 2 Kgs CO2 - 1 Unit c. Fender F3 - 4 pcs d. Japan rope soft type 16mm - 60m e. Bot Hook- 1 pcs f. Ring Buoy - 2 pcs g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 pcs j. Portable Search Light - 1 set k. Tool box Licota 143 Pcs - 1 set
Labour and materials to renewal and reinstallation boat accessories on board. Material: a. 灭火器 2 公斤 ABC - 2 个 b. 灭火器 2 公斤 CO2 - 1 个 c. 护舷材 F3 - 4 件 d. 日本 船用绳索 软质型 16毫米 - 60米 e. Bot Hook- 1 件 f. 救生圈 - 2 件 g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 件 j. Portable 船用探照灯 - 1 set k. 工具箱 Licota 143 件 - 1 set
RM42.0NEEDS_REVIEW

VIEW ALL 68 ITEMS
No.DescriptionQtyUnitRate RefRateCalculatedState
1.1To docking and undocking boat.
船用物料:To docking and undocking boat.
—RM2.11069.9—NEEDS_REVIEW
1.2Docking chargers 30 days.
船用物料:Docking chargers 30 days.
—RM2.286.9—NEEDS_REVIEW
1.3Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
船用物料:Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
—RM4.7.2——NEEDS_REVIEW
2.1To scrape marine growth,wash down and clean underwater hull with HP freshwater (22.66m²)
To scrape 船用 growth,wash down and clean underwater hull with HP freshwater (22.66m²)
—m23.37.26—NEEDS_REVIEW
2.2Labour to grinding underwater hull to bare fibre. (22.66m²)
船用物料:Labour to grinding underwater hull to bare fibre. (22.66m²)
—m23.6(a)——NEEDS_REVIEW
2.3Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 kg
Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 公斤
—mh41.038.0—NEEDS_REVIEW
2.4Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
船用物料:Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
—m23.6(a)——NEEDS_REVIEW
2.5To wash down after grinding and before painting underwater hull area.(22.66m2)
船用物料:To wash down after grinding and before painting underwater hull area.(22.66m2)
—m23.24.8—NEEDS_REVIEW
2.6Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
船用物料:Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
—RM3.13(a)——NEEDS_REVIEW
2.7Labour to reposition chock/block to complete coverage painting.
船用物料:Labour to reposition chock/block to complete coverage painting.
—block2.4——NEEDS_REVIEW
3.1Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
船用物料:Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
—m23.37.26—NEEDS_REVIEW
3.2To grinding the whole ship side area to sound paint. (14.24m²)
船用物料:To grinding the whole ship side area to sound paint. (14.24m²)
—m23.6(a)——NEEDS_REVIEW
3.3Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
船用物料:Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
—mh41.038.0—NEEDS_REVIEW
3.4Labour to grinding shipside to smooth before painting. (min. charge 10m²)
船用物料:Labour to grinding shipside to smooth before painting. (min. charge 10m²)
—m23.6(a)——NEEDS_REVIEW
3.5To wash down after grinding and before painting shipside area. (14.24m²)
船用物料:To wash down after grinding and before painting shipside area. (14.24m²)
—m23.24.8—NEEDS_REVIEW
3.6Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
船用物料:Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
—RM3.13(a)——NEEDS_REVIEW
4.1Fresh water clean transom and motor well (min.charge 10m²)
Fresh water clean transom and 电机 well (min.charge 10m²)
—m23.24.8—NEEDS_REVIEW
4.2Labour and material to cutting motor well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12mm - 6 sheet
Labour and material to cutting 电机 well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12毫米 - 6 sheet
—mh41.038.0—NEEDS_REVIEW
4.3To grinding the whole transom and motorwell area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 kg
To grinding the whole transom and 电机well area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 公斤
—m23.6(a)——NEEDS_REVIEW
4.4Cleaning the transom and motor well with HP fresh water before painting. (min.charge 10m²)
Cleaning the transom and 电机 well with HP fresh water before painting. (min.charge 10m²)
—m23.24.8—NEEDS_REVIEW
4.5Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
船用物料:Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
—RM3.13(a)——NEEDS_REVIEW
4.6Labour and material to respray paint motor well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
Labour and material to respray paint 电机 well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
—RM3.13(a)——NEEDS_REVIEW
4.7Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 pcs
Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 件
—mh41.038.0—NEEDS_REVIEW
4.8Labour and material to remove, renew and reinstall inspection cover motor well. Material : a. Deck Inspection Hatch 353mm X 606mm - 1 unit b. Deck Inspection Hatch round dia 8'' - 2 sets
Labour and material to remove, renew and reinstall inspection cover 电机 well. Material : a. Deck Inspection Hatch 353毫米 X 606毫米 - 1 个 b. Deck Inspection Hatch round dia 8'' - 2 sets
—mh41.038.0—NEEDS_REVIEW
5.1Labour and material to repair fender port and stbd. Material; a.. Hyphalon cloth 1.5mm - 26m b.. Rima Tic SC 2000 - 20 kg c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud Bolt and Nut 3/4" x 10" - 50 Sets
Labour and material to repair 护舷材 port and stbd. Material; a.. Hyphalon cloth 1.5毫米 - 26米 b.. Rima Tic SC 2000 - 20 公斤 c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud 螺栓 and 螺母 3/4" x 10" - 50 Sets
—mh41.038.0—NEEDS_REVIEW
5.2Labour and material to repair bracket fibreglass below fenders Material; a.. W/P plywood 12mm - 2 sheets b.. 3mm (T) x 25mm Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 kgs d.. Resin - 30 kgs e.. Hardener - 0.5 kg f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
Labour and material to repair bracket fibreglass below 护舷材s Material; a.. W/P plywood 12毫米 - 2 sheets b.. 3毫米 (T) x 25毫米 Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 公斤 d.. Resin - 30 公斤 e.. Hardener - 0.5 公斤 f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
—mh41.038.0—NEEDS_REVIEW
6.1Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
船用物料:Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
—m23.6(a)——NEEDS_REVIEW
6.2Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 kg
Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 公斤
—mh41.038.0—NEEDS_REVIEW
6.3Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
船用物料:Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
—m23.6(a)——NEEDS_REVIEW
6.4Fresh water cleaning before painting. (18m²)
船用物料:Fresh water cleaning before painting. (18m²)
—RM3.24.8—NEEDS_REVIEW
6.5To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
船用物料:To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
—RM3.13(a)——NEEDS_REVIEW
6.6Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST bolt and nut 1/4" x 2'' - 42 Sets
Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST 螺栓 and 螺母 1/4" x 2'' - 42 Sets
—mh41.038.0—NEEDS_REVIEW
6.8Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3mm 4'' x 8'' - 4 sheet b. SST Bolt and nut 1/2'' x 2 '' - 16 pcs
Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3毫米 4'' x 8'' - 4 sheet b. SST 螺栓 and 螺母 1/2'' x 2 '' - 16 件
—mh41.038.0—NEEDS_REVIEW
6.9Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
船用物料:Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
—mh41.038.0—NEEDS_REVIEW
7.1Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon rope 9mm - 20 meter
Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon 船用绳索 9毫米 - 20 meter
—mh41.038.0—NEEDS_REVIEW
7.2Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
船用物料:Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
—m23.6(a)——NEEDS_REVIEW
7.3Fresh water clean transom stand deck awning before painting (min.charge 10m²)
船用物料:Fresh water clean transom stand deck awning before painting (min.charge 10m²)
—m23.24.8—NEEDS_REVIEW
7.4Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
船用物料:Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
—RM3.13(a)——NEEDS_REVIEW
7.5Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8m x 1.5m - 1 sheet
Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8米 x 1.5米 - 1 sheet
—mh41.038.0—NEEDS_REVIEW
8.1Labour and material to repair mounting gpmg Material; a. SST Bolt Nut - 9 pcs b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
Labour and material to repair mounting gpmg Material; a. SST 螺栓 螺母 - 9 件 b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
—mh41.038.0—NEEDS_REVIEW
8.2Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
船用物料:Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
—m23.6(a)——NEEDS_REVIEW
8.3Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
船用物料:Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
—RM3.13(a)——NEEDS_REVIEW
9.1Labour to pump out fuel from the fuel tank before cleaning.
Labour to 泵 out fuel from the fuel tank before cleaning.
—mh41.038.0—NEEDS_REVIEW
9.2Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
船用物料:Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
—mh41.038.0—NEEDS_REVIEW
9.3Labour to remove the fuel tank bracket bolt and nuts, hoses, piping in the way of tank removal and fitting back after completion
Labour to remove the fuel tank bracket 螺栓 and 螺母s, 软管s, piping in the way of tank removal and fitting back after completion
—mh41.038.0—NEEDS_REVIEW
9.4Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3mm - 12m² b. SST plate 9mm - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST bolt and nut 1/2'' x 2'' - 24 pcs
Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3毫米 - 12m² b. SST plate 9毫米 - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST 螺栓 and 螺母 1/2'' x 2'' - 24 件
—mh41.038.0—NEEDS_REVIEW
9.5Manhole cover and renew oil resisten gasket
船用物料:Manhole cover and renew oil resisten gasket
—set15.5.280.85—NEEDS_REVIEW
9.6Labour to carry out pressure test on tanks. (Min. charge 5m³)
船用物料:Labour to carry out pressure test on tanks. (Min. charge 5m³)
—m³15.436.96—NEEDS_REVIEW
9.1Labour and material to renew and reistall inlet hose, overflow hose and oil level hose fuel tank port and stbd. Material: a. SST stop valve 50mm - 2 pcs b. SST Nipple - 2 Pcs c. Fuel Hose Dia 50mm - 2 Length d. SST hose clamp dia 50mm – 4 pcs
Labour and material to renew and reistall inlet 软管, overflow 软管 and oil level 软管 fuel tank port and stbd. Material: a. SST stop 阀门 50毫米 - 2 件 b. SST Nipple - 2 件 c. Fuel 软管 Dia 50毫米 - 2 Length d. SST 软管 clamp dia 50毫米 – 4 件
—mh41.038.0—NEEDS_REVIEW
9.11Labour and material to renew fuel hose from fuel tank to water separator filter engine port and stbd. Material: a. UNIGAWA Fuel hose 12mm x 7' - 12 meter b. SST hose clamp 15mm - 18pcs
Labour and material to renew fuel 软管 from fuel tank to water separator 滤芯 engine port and stbd. Material: a. UNIGAWA Fuel 软管 12毫米 x 7' - 12 meter b. SST 软管 clamp 15毫米 - 18pcs
—mh41.038.0—NEEDS_REVIEW
10.1Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
船用物料:Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
—m236.142.79—NEEDS_REVIEW
10.2Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
船用物料:Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
—RM3.13(b)——NEEDS_REVIEW
10.3Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcs
Labour and material to dismantle and install new bilges 泵. Material : a. 船用舱底泵 - 1 set b. Spring 软管 1'' - 12 Mtrs c. SST Clamp 30毫米 - 8 件 d. Seaflo Bilgest 泵 Switch 3 Ways - 1 件
—mh41.038.0—NEEDS_REVIEW
10.4Labour and materials to remove, renew and reinstall manual hand pump. Materials: a. Whale manual Hand pump 38mm - 2 set b. Hose spring 1 1/2" - 2 Mtr c. SST hose clamp dia 50mm - 4 pcs
Labour and materials to remove, renew and reinstall manual hand 泵. Materials: a. Whale manual Hand 泵 38毫米 - 2 set b. 软管 spring 1 1/2" - 2 Mtr c. SST 软管 clamp dia 50毫米 - 4 件
—mh41.038.0—NEEDS_REVIEW
11.1Labour and material to check, renew and install wiring (cabel 2.0mm - 60m) Material : a. Marine cable type 2.0mm - 60 meters b. Anchor light - 1 set c. Stern light - 1 unit d. Masthead light - 1 unit e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
Labour and material to check, renew and install wiring (cabel 2.0毫米 - 60米) Material : a. 船用 cable type 2.0毫米 - 60 meters b. Anchor light - 1 set c. Stern light - 1 个 d. Masthead light - 1 个 e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
—m40.160.06—NEEDS_REVIEW
11.2Labour and material to new wiring for spot light and install spot light.(Cable 2.5mm - 30meters) Material : a. Cable 2.5mm - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with bolt and nut - 5 pcs
Labour and material to new wiring for spot light and install spot light.(Cable 2.5毫米 - 30meters) Material : a. Cable 2.5毫米 - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with 螺栓 and 螺母 - 5 件
—mtr40.160.06—NEEDS_REVIEW
11.3Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
船用物料:Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
—mh41.038.0—NEEDS_REVIEW
11.4Labour and material to remove and renew battery and terminal battery engine port and stbd. Material : a. Free Maintanace battery AMARON N150 - 2 unit b. Free Maintanace battery AMARON N120 - 1 unit c. Terminal Battery - 6 pcs d. Battery cable 21mm - 14mtr e. Circuit breaker BEP - 3 sets
Labour and material to remove and renew 蓄电池 and terminal 蓄电池 engine port and stbd. Material : a. Free Maintanace 蓄电池 AMARON N150 - 2 个 b. Free Maintanace 蓄电池 AMARON N120 - 1 个 c. Terminal 蓄电池 - 6 件 d. 蓄电池 cable 21毫米 - 14mtr e. Circuit breaker BEP - 3 sets
—mh41.038.0—NEEDS_REVIEW
12.1Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
船用物料:Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
—RM43.015.0—NEEDS_REVIEW
12.2Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
船用物料:Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
—RM43.015.0—NEEDS_REVIEW
12.3Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
船用物料:Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
—RM43.015.0—NEEDS_REVIEW
13.1Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. Bolt and Nut 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. 螺栓 and 螺母 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
—mh41.038.0—NEEDS_REVIEW
13.2Labour and materials to service, install and setting 2 unit engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube motor oil 10W40 - 4 botol b. Oil filter - 2 pcs c. Fuel filter - 2 pcs d. Seal - 2 pc e. Yamaha water separator filter - 2 unit f. Spark plug NGK LFR6A-11 - 16 pcs g. Thermostart assy - 4 pcs h. Zinc anode - 2 pcs i. Belting - 2 pcs j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 pcs l. Flywheel - 2 unit m. Primer bulb - 2 pcs
Labour and materials to service, install and setting 2 个 engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube 电机 oil 10W40 - 4 botol b. Oil 滤芯 - 2 件 c. Fuel 滤芯 - 2 件 d. Seal - 2 件 e. Yamaha water separator 滤芯 - 2 个 f. Spark plug NGK LFR6A-11 - 16 件 g. Thermostart assy - 4 件 h. Zinc anode - 2 件 i. Belting - 2 件 j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 件 l. Flywheel - 2 个 m. 舷外机汽油手泵 - 2 件
—RM46.0——NEEDS_REVIEW
13.3Labour and material to remove, renew and install high and low pump engine port and stbd Material : a. Fuel pump comp 6AW-13907-11 - 2 unit b. Fuel pump assy 6CB-24410-01 - 2 unit
Labour and material to remove, renew and install high and low 泵 engine port and stbd Material : a. Fuel 泵 comp 6AW-13907-11 - 2 个 b. Fuel 泵 assy 6CB-24410-01 - 2 个
—RM43.015.0—NEEDS_REVIEW
13.4Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 unit
Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 个
—RM46.0——NEEDS_REVIEW
14.1Labour and material to fabricate new and install engine guard rail. Material : a. SST pipe 50mm - 12 meters b. SST elbow 50mm - 4 pcs c. SST bracket 0.1m - 8 pcs d. SST bolt and nut 1/2'' x 3'' - 16 pcs e. Repair kit- 4 set
Labour and material to fabricate new and install engine guard rail. Material : a. SST 管 50毫米 - 12 meters b. SST elbow 50毫米 - 4 件 c. SST bracket 0.1米 - 8 件 d. SST 螺栓 and 螺母 1/2'' x 3'' - 16 件 e. Repair kit- 4 set
—mh41.038.0—NEEDS_REVIEW
14.2Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
船用物料:Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
—RM3.13 (a)——NEEDS_REVIEW
15.1Labour and materials to renewal and reinstallation boat accessories on board. Material: a. Fire Extingusher 2 Kgs ABC - 2 Units b. Fire Extingusher 2 Kgs CO2 - 1 Unit c. Fender F3 - 4 pcs d. Japan rope soft type 16mm - 60m e. Bot Hook- 1 pcs f. Ring Buoy - 2 pcs g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 pcs j. Portable Search Light - 1 set k. Tool box Licota 143 Pcs - 1 set
Labour and materials to renewal and reinstallation boat accessories on board. Material: a. 灭火器 2 公斤 ABC - 2 个 b. 灭火器 2 公斤 CO2 - 1 个 c. 护舷材 F3 - 4 件 d. 日本 船用绳索 软质型 16毫米 - 60米 e. Bot Hook- 1 件 f. 救生圈 - 2 件 g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 件 j. Portable 船用探照灯 - 1 set k. 工具箱 Licota 143 件 - 1 set
—RM42.015.0—NEEDS_REVIEW
STEP 4 OF 7

Marketplace Research

Search each procurement item across Buyee Japan, Shopee, Lazada, Pinduoduo, Alibaba, AliExpress, Made-in-China and other suppliers. Saved direct links stay attached to the item and the board is auto-saved after processing.

1.1 · To docking and undocking boat.船用物料:To docking and undocking boat.
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
1.2 · Docking chargers 30 days.船用物料:Docking chargers 30 days.
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
1.3 · Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.船用物料:Crane charges to lift up bot from trailer to cradle & from cradle to trailer after completion of work.
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.1 · To scrape marine growth,wash down and clean underwater hull with HP freshwater (22.66m²)To scrape 船用 growth,wash down and clean underwater hull with HP freshwater (22.66m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.2 · Labour to grinding underwater hull to bare fibre. (22.66m²)船用物料:Labour to grinding underwater hull to bare fibre. (22.66m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.3 · Labour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 kgLabour and material to rebuilt powder at underwater hull pitted area. Material; a. Powder fibreglass - 0.5 公斤
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.4 · Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)船用物料:Labour to grinding underwater hull to smooth before painting. (min. charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.5 · To wash down after grinding and before painting underwater hull area.(22.66m2)船用物料:To wash down after grinding and before painting underwater hull area.(22.66m2)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.6 · Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin船用物料:Labour to paint the whole underwater hull according to specification layer coats by conventional spray method.(22.66m²) (4 coat) Material; a. Hemple paint undercoat red 5liter - 2 tin b. Hempadur Quattro - 2 tin c. Hemple paint yellowish 5liter - 2 tin d. Hemple paint black Antifouling 5liter - 2 tin e. Hemple thinner 08080 - 2 tin
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
2.7 · Labour to reposition chock/block to complete coverage painting.船用物料:Labour to reposition chock/block to complete coverage painting.
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
3.1 · Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)船用物料:Light scrape and throughly clean shipside hull and transom with HP freshwater (14.24m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
3.2 · To grinding the whole ship side area to sound paint. (14.24m²)船用物料:To grinding the whole ship side area to sound paint. (14.24m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
3.3 · Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin船用物料:Labour and material to rebuilt cement putty at shipside area. Material; a. Cement putty - 0.5 tin
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
3.4 · Labour to grinding shipside to smooth before painting. (min. charge 10m²)船用物料:Labour to grinding shipside to smooth before painting. (min. charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
3.5 · To wash down after grinding and before painting shipside area. (14.24m²)船用物料:To wash down after grinding and before painting shipside area. (14.24m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
3.6 · Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin船用物料:Labour and material to paint shipside and bracket 2 coat paint by spray. (14.24m²) Material; a. Hemple paint black color - 1 tin b. Hempel Thinner - 0.5 tin
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
4.1 · Fresh water clean transom and motor well (min.charge 10m²)Fresh water clean transom and 电机 well (min.charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
4.2 · Labour and material to cutting motor well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12mm - 6 sheetLabour and material to cutting 电机 well to give way renewal transom. Material; a. Fibreglass mat - 40kg b. Fibreglass resin - 80kg c. Hardener - 0.8kg d. W/proof plywood 12毫米 - 6 sheet
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
4.3 · To grinding the whole transom and motorwell area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 kgTo grinding the whole transom and 电机well area to sound paint. (min.charge 10m²) Material; a. Simen putty - 1 公斤
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
4.4 · Cleaning the transom and motor well with HP fresh water before painting. (min.charge 10m²)Cleaning the transom and 电机 well with HP fresh water before painting. (min.charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
4.5 · Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter船用物料:Labour and material to spray paint transom (min.charge 10m²)(4 coats) Material : a. Hempadur Red - 1 liter b. Hempadur Quattro - 1 liter c. Hempadur Yellowish - 1 liter d. Black Antifouling - 1 liter e. Hempel Thinner - 0.5 liter
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
4.6 · Labour and material to respray paint motor well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 literLabour and material to respray paint 电机 well (min.charge 10m²)(2 coats) Material : a. Hempathene Black - 2 liter b. Hempel Thinner - 0.5 liter
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
4.7 · Labour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 pcsLabour and material to remove, renew and reinstall outlet drain canvas . Material : a. Canvas - 2 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
4.8 · Labour and material to remove, renew and reinstall inspection cover motor well. Material : a. Deck Inspection Hatch 353mm X 606mm - 1 unit b. Deck Inspection Hatch round dia 8'' - 2 setsLabour and material to remove, renew and reinstall inspection cover 电机 well. Material : a. Deck Inspection Hatch 353毫米 X 606毫米 - 1 个 b. Deck Inspection Hatch round dia 8'' - 2 sets
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
5.1 · Labour and material to repair fender port and stbd. Material; a.. Hyphalon cloth 1.5mm - 26m b.. Rima Tic SC 2000 - 20 kg c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud Bolt and Nut 3/4" x 10" - 50 SetsLabour and material to repair 护舷材 port and stbd. Material; a.. Hyphalon cloth 1.5毫米 - 26米 b.. Rima Tic SC 2000 - 20 公斤 c.. Harderner UT-R 20 40 gram - 20 tin d.. Repair kit Flex - 10 set e.. Pentens 609 flex sauges - 25 tubes f.. SST Stud 螺栓 and 螺母 3/4" x 10" - 50 Sets
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
5.2 · Labour and material to repair bracket fibreglass below fenders Material; a.. W/P plywood 12mm - 2 sheets b.. 3mm (T) x 25mm Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 kgs d.. Resin - 30 kgs e.. Hardener - 0.5 kg f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 SetsLabour and material to repair bracket fibreglass below 护舷材s Material; a.. W/P plywood 12毫米 - 2 sheets b.. 3毫米 (T) x 25毫米 Aluminium Flat Bars - 20 Meters c.. Fibreglass mat - 15 公斤 d.. Resin - 30 公斤 e.. Hardener - 0.5 公斤 f.. S/S Tapping Screw 1/2" x 1 1/2" - 120 Sets
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
6.1 · Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)船用物料:Labour and materials to grinding smooth main deck surface in order for paint application. (18m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
6.2 · Labour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 kgLabour and material to rebuilt cement putty console panel, storage box, passengger seat, pilot seat and surrounding main deck. Material: a. Simen putty - 1 公斤
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
6.3 · Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)船用物料:Labour to grinding main deck, floorboard, console panel, passenger seat, pilot seat, and storage box to smooth before painting. (min.charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
6.4 · Fresh water cleaning before painting. (18m²)船用物料:Fresh water cleaning before painting. (18m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
6.5 · To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags船用物料:To repaint whole console panel, top side and main deck of the boat with finish coat black. (18m²)(2 coats) Material; a. Hemple paint undercoat 5 liter - 2 tin b. Hemple paint black color 5 liter - 2 tin c. Hemple thinner 08080 - 0.5 tin d. Anti Slint - 2 bags
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
6.6 · Labour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST bolt and nut 1/4" x 2'' - 42 SetsLabour and material to remove, renew and refit cushion cover pilot seat, OOW, gun man and passenger seat. Material: a. Super leather cover Pilot and OOW - 2 sets b. Super leather cover Passengger 40" x 10" -4 sets c. Super leather cover Gun man - 1 sets d. Super leather cover long bench 62"x38" -1 sets e. SST 螺栓 and 螺母 1/4" x 2'' - 42 Sets
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
6.8 · Labour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3mm 4'' x 8'' - 4 sheet b. SST Bolt and nut 1/2'' x 2 '' - 16 pcsLabour and material to remove, service and reinstall bollard and bracket after deck and forward deck Material : a. SST plate 3毫米 4'' x 8'' - 4 sheet b. SST 螺栓 and 螺母 1/2'' x 2 '' - 16 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
6.9 · Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets船用物料:Labour and material to new hatch cover at forward deck Material : b. Deck Inspection Hatch round dia 8'' - 4 sets
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
7.1 · Labour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon rope 9mm - 20 meterLabour and material to remove, renew and reinstall canvas awning main deck. Material :- a. Black canva awning 210" x 58" - 1 sheet b. Nylon 船用绳索 9毫米 - 20 meter
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
7.2 · Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)船用物料:Labour to grinding to smooth before painting stand deck awning. (min. charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
7.3 · Fresh water clean transom stand deck awning before painting (min.charge 10m²)船用物料:Fresh water clean transom stand deck awning before painting (min.charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
7.4 · Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters船用物料:Labour and material to spray paint stand deck awning. (min. charge 10m²)(2 coats) Material; a. Hempadur Red - 2 liter b. Hemple paint black color - 2 liters
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
7.5 · Labour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8m x 1.5m - 1 sheetLabour and material to remove, renew and install complete black canvas for main console panel Material : a. Black canvas cover 0.8米 x 1.5米 - 1 sheet
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
8.1 · Labour and material to repair mounting gpmg Material; a. SST Bolt Nut - 9 pcs b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kgLabour and material to repair mounting gpmg Material; a. SST 螺栓 螺母 - 9 件 b. Fibreglass matt - 5kg c. Fibreglass resin - 10kg d. Hardener - 0.1kg
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
8.2 · Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)船用物料:Labour to grinding to smooth mounting GPMG before painting (min. charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
8.3 · Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter船用物料:Labour and material to repaint mounting GPMG (min. charge 10m²)(2 coats) Material; a. Hemple paint undercoat - 1 liter b. Hemple paint black color - 1 liter
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
9.1 · Labour to pump out fuel from the fuel tank before cleaning.Labour to 泵 out fuel from the fuel tank before cleaning.
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
9.2 · Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes船用物料:Labour to remove floor board and refitting on completion. Material : a. Repair kit - 4 tubes
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
9.3 · Labour to remove the fuel tank bracket bolt and nuts, hoses, piping in the way of tank removal and fitting back after completionLabour to remove the fuel tank bracket 螺栓 and 螺母s, 软管s, piping in the way of tank removal and fitting back after completion
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
9.4 · Labour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3mm - 12m² b. SST plate 9mm - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST bolt and nut 1/2'' x 2'' - 24 pcsLabour and material to remove, fabricate and reinstall fuel tank. Material : a. SST plate 3毫米 - 12m² b. SST plate 9毫米 - 3m2 c. SST welding rod - 6kg d. Argon gas - 2 cylds e. SST 螺栓 and 螺母 1/2'' x 2'' - 24 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
9.5 · Manhole cover and renew oil resisten gasket船用物料:Manhole cover and renew oil resisten gasket
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
9.6 · Labour to carry out pressure test on tanks. (Min. charge 5m³)船用物料:Labour to carry out pressure test on tanks. (Min. charge 5m³)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
9.1 · Labour and material to renew and reistall inlet hose, overflow hose and oil level hose fuel tank port and stbd. Material: a. SST stop valve 50mm - 2 pcs b. SST Nipple - 2 Pcs c. Fuel Hose Dia 50mm - 2 Length d. SST hose clamp dia 50mm – 4 pcsLabour and material to renew and reistall inlet 软管, overflow 软管 and oil level 软管 fuel tank port and stbd. Material: a. SST stop 阀门 50毫米 - 2 件 b. SST Nipple - 2 件 c. Fuel 软管 Dia 50毫米 - 2 Length d. SST 软管 clamp dia 50毫米 – 4 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
9.11 · Labour and material to renew fuel hose from fuel tank to water separator filter engine port and stbd. Material: a. UNIGAWA Fuel hose 12mm x 7' - 12 meter b. SST hose clamp 15mm - 18pcsLabour and material to renew fuel 软管 from fuel tank to water separator 滤芯 engine port and stbd. Material: a. UNIGAWA Fuel 软管 12毫米 x 7' - 12 meter b. SST 软管 clamp 15毫米 - 18pcs
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
10.1 · Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)船用物料:Labour to clean bilges forward deck, after deck console panel and fuel tank compartment. (min.charge 10m²)
SERVICE_WORK · 0 link(s)

Service / work row — marketplace product search is not required.

SAVE VERIFIED MARKETPLACE RESULT
10.2 · Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin船用物料:Labour to painting scheme bilge section. (min.charge 10m²) Material: a. Hemple finish coat - 1 tin
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
10.3 · Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcsLabour and material to dismantle and install new bilges 泵. Material : a. 船用舱底泵 - 1 set b. Spring 软管 1'' - 12 Mtrs c. SST Clamp 30毫米 - 8 件 d. Seaflo Bilgest 泵 Switch 3 Ways - 1 件
Suggested seller: Marine Bilge Pump 2300GPH 12V & 24V, Manual (Non-Auto) · REVIEW · AVAILABLE · MYR 117.00 · OPEN SELLER
PRODUCT · 7 link(s)
PlatformProductVisible PriceLink
ShopeeMarine Bilge Pump 2300GPH 12V & 24V, Manual (Non-Auto)MYR 117.00BUY / OPEN
Shopee12V 2000GPH Bilge Pump MKBP-2000-12 Marine Boat Electric Bilge Water PumpMYR 122.76BUY / OPEN
Shopee01 Series SEAFLO Bilge Pump 3500GPH, 12V & 24V (Manual, Non-Auto)MYR 291.90BUY / OPEN
ShopeeRULE 27SA Fully Automatic Bilge Pump 1100GPH 12VMYR 1104.20BUY / OPEN
Made-in-China12V 600GPH Automatic Boat Bilge Water Pump—BUY / OPEN
Made-in-ChinaDC 12V 24V Portable Electrical Marine Boat Bilge Pump—BUY / OPEN
Made-in-ChinaLifesrc 2000 GPH Boat Marine Electric Submersible Bilge Pump—BUY / OPEN
SAVE VERIFIED MARKETPLACE RESULT
10.4 · Labour and materials to remove, renew and reinstall manual hand pump. Materials: a. Whale manual Hand pump 38mm - 2 set b. Hose spring 1 1/2" - 2 Mtr c. SST hose clamp dia 50mm - 4 pcsLabour and materials to remove, renew and reinstall manual hand 泵. Materials: a. Whale manual Hand 泵 38毫米 - 2 set b. 软管 spring 1 1/2" - 2 Mtr c. SST 软管 clamp dia 50毫米 - 4 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
11.1 · Labour and material to check, renew and install wiring (cabel 2.0mm - 60m) Material : a. Marine cable type 2.0mm - 60 meters b. Anchor light - 1 set c. Stern light - 1 unit d. Masthead light - 1 unit e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 setLabour and material to check, renew and install wiring (cabel 2.0毫米 - 60米) Material : a. 船用 cable type 2.0毫米 - 60 meters b. Anchor light - 1 set c. Stern light - 1 个 d. Masthead light - 1 个 e. 6 gang Switch panel with fuse - 1 set f. USB plug 12v - 1 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
11.2 · Labour and material to new wiring for spot light and install spot light.(Cable 2.5mm - 30meters) Material : a. Cable 2.5mm - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with bolt and nut - 5 pcsLabour and material to new wiring for spot light and install spot light.(Cable 2.5毫米 - 30meters) Material : a. Cable 2.5毫米 - 30 meter b. Sport light DC 12V - 5 set c. SST Bracket with 螺栓 and 螺母 - 5 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
11.3 · Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set船用物料:Labour and material to remove, renew and reinstall deck light. Material : a. Dome light dia 6'' DC 12V - 2 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
11.4 · Labour and material to remove and renew battery and terminal battery engine port and stbd. Material : a. Free Maintanace battery AMARON N150 - 2 unit b. Free Maintanace battery AMARON N120 - 1 unit c. Terminal Battery - 6 pcs d. Battery cable 21mm - 14mtr e. Circuit breaker BEP - 3 setsLabour and material to remove and renew 蓄电池 and terminal 蓄电池 engine port and stbd. Material : a. Free Maintanace 蓄电池 AMARON N150 - 2 个 b. Free Maintanace 蓄电池 AMARON N120 - 1 个 c. Terminal 蓄电池 - 6 件 d. 蓄电池 cable 21毫米 - 14mtr e. Circuit breaker BEP - 3 sets
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
12.1 · Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set船用物料:Labour and material to remove, renew and install new GPS, Radar, Echo sounder system on board. Functional test will be carry out after works completed Material : a. G3 card - 1 set b. Garmine GPS complete set with radar and transducer 3 in1 -1 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
12.2 · Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set船用物料:Labour and material to remove, renew and reinstall Whelen police light complete set. Materials:- a. Whelen police light complete set - 1 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
12.3 · Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set船用物料:Labour and material to remove and renew VHF Radio. Material: a. Icom model IC-M304 VHF c/w Power cable and Fold Down Mount Bracket - 1 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
13.1 · Labour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. Bolt and Nut 3/4" x 6" - 8pcs b. Repair kit - 2 tubesLabour and material to dismantle, remove and reinstall back engine port and stbd. Material : a. 螺栓 and 螺母 3/4" x 6" - 8pcs b. Repair kit - 2 tubes
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
13.2 · Labour and materials to service, install and setting 2 unit engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube motor oil 10W40 - 4 botol b. Oil filter - 2 pcs c. Fuel filter - 2 pcs d. Seal - 2 pc e. Yamaha water separator filter - 2 unit f. Spark plug NGK LFR6A-11 - 16 pcs g. Thermostart assy - 4 pcs h. Zinc anode - 2 pcs i. Belting - 2 pcs j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 pcs l. Flywheel - 2 unit m. Primer bulb - 2 pcsLabour and materials to service, install and setting 2 个 engine YAMAHA V8 350HP. Testing and commissioning will carry out after works completed. Material : a. Yamalube 电机 oil 10W40 - 4 botol b. Oil 滤芯 - 2 件 c. Fuel 滤芯 - 2 件 d. Seal - 2 件 e. Yamaha water separator 滤芯 - 2 个 f. Spark plug NGK LFR6A-11 - 16 件 g. Thermostart assy - 4 件 h. Zinc anode - 2 件 i. Belting - 2 件 j. Pulley tensioner - 2 sets k. Dipstick lub oil engine - 2 件 l. Flywheel - 2 个 m. 舷外机汽油手泵 - 2 件
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
13.3 · Labour and material to remove, renew and install high and low pump engine port and stbd Material : a. Fuel pump comp 6AW-13907-11 - 2 unit b. Fuel pump assy 6CB-24410-01 - 2 unitLabour and material to remove, renew and install high and low 泵 engine port and stbd Material : a. Fuel 泵 comp 6AW-13907-11 - 2 个 b. Fuel 泵 assy 6CB-24410-01 - 2 个
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
13.4 · Labour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 unitLabour and material to remove, renew and reinstall gearcase port. Material : a. Gearcase CXXL 30 inch - 1 个
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
14.1 · Labour and material to fabricate new and install engine guard rail. Material : a. SST pipe 50mm - 12 meters b. SST elbow 50mm - 4 pcs c. SST bracket 0.1m - 8 pcs d. SST bolt and nut 1/2'' x 3'' - 16 pcs e. Repair kit- 4 setLabour and material to fabricate new and install engine guard rail. Material : a. SST 管 50毫米 - 12 meters b. SST elbow 50毫米 - 4 件 c. SST bracket 0.1米 - 8 件 d. SST 螺栓 and 螺母 1/2'' x 3'' - 16 件 e. Repair kit- 4 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
14.2 · Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter船用物料:Labour and material to paint engine guard rail 2 coat paint by spray. (min. charge 10m²)(2 coats) Material : a. Hempadur Red - 2 liter b. Hempathene Black - 2 liter c. Hempel Thinner - 0.5 liter
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
15.1 · Labour and materials to renewal and reinstallation boat accessories on board. Material: a. Fire Extingusher 2 Kgs ABC - 2 Units b. Fire Extingusher 2 Kgs CO2 - 1 Unit c. Fender F3 - 4 pcs d. Japan rope soft type 16mm - 60m e. Bot Hook- 1 pcs f. Ring Buoy - 2 pcs g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 pcs j. Portable Search Light - 1 set k. Tool box Licota 143 Pcs - 1 setLabour and materials to renewal and reinstallation boat accessories on board. Material: a. 灭火器 2 公斤 ABC - 2 个 b. 灭火器 2 公斤 CO2 - 1 个 c. 护舷材 F3 - 4 件 d. 日本 船用绳索 软质型 16毫米 - 60米 e. Bot Hook- 1 件 f. 救生圈 - 2 件 g. First aid kit - 1 set h. Binacolar - 1 set i. Life jacket LALIZAS - 5 件 j. Portable 船用探照灯 - 1 set k. 工具箱 Licota 143 件 - 1 set
PRODUCT · 0 link(s)
SAVE VERIFIED MARKETPLACE RESULT
STEP 5 OF 7

Research Outcome

Each product/material item shows its suggested seller and every saved seller link. Aqua ranks available exact matches first, then comparable-spec/color/component alternatives, then price. Sold-out results stay visible for reference but are not preferred.

Product/material items32
Service/work rows36
Products researched1
Products still without seller link31
Direct seller links7
Visible prices4
STEP 6 OF 7

Supplier Comparison & Buyer Decision

Marketplace comparison ranks available exact matches first, then comparable alternatives. The imported Excel rate stays visible as the source baseline; a marketplace listing is not treated as a locked procurement price until selected.

Marketplace comparison coverage: 1 item(s) currently have two or more seller links.

10.3 · Labour and material to dismantle and install new bilges pump. Material : a. Bilge pump - 1 set b. Spring Hose 1'' - 12 Mtrs c. SST Clamp 30mm - 8 Pcs d. Seaflo Bilgest Pump Switch 3 Ways - 1 pcs
Required: — mh · Excel baseline rate: RM 38.00
7 seller link(s)
ResultMatchStatusSeller / ProductVisible PriceSource
SUGGESTEDREVIEWAVAILABLEShopee · Marine Bilge Pump 2300GPH 12V & 24V, Manual (Non-Auto)MYR 117.00OPEN SELLER
AlternativeREVIEWAVAILABLEShopee · 12V 2000GPH Bilge Pump MKBP-2000-12 Marine Boat Electric Bilge Water PumpMYR 122.76OPEN SELLER
AlternativeREVIEWAVAILABLEShopee · 01 Series SEAFLO Bilge Pump 3500GPH, 12V & 24V (Manual, Non-Auto)MYR 291.90OPEN SELLER
AlternativeREVIEWAVAILABLEShopee · RULE 27SA Fully Automatic Bilge Pump 1100GPH 12VMYR 1104.20OPEN SELLER
AlternativeREVIEWAVAILABLEMade-in-China · 12V 600GPH Automatic Boat Bilge Water PumpCheck sellerOPEN SELLER
AlternativeREVIEWAVAILABLEMade-in-China · DC 12V 24V Portable Electrical Marine Boat Bilge PumpCheck sellerOPEN SELLER
AlternativeREVIEWAVAILABLEMade-in-China · Lifesrc 2000 GPH Boat Marine Electric Submersible Bilge PumpCheck sellerOPEN SELLER

Locked Candidate Decision Layer

Use verified candidate rows below only when supplier rating, lead time, spec match, availability and risk have been confirmed for a purchasing decision.

No verified candidate rows have been saved yet. Marketplace direct links can exist before a comparison candidate is created.

STEP 7 OF 7

Purchase, PO & Final Output

Locked buyer decisions

0 / 68

PO

Not created

Workflow

NEEDS REVIEW

Template

RH47_LOCKED


Procurement outputs: PDF DOCX XLS XLSX

RH47 locked output: CELL MAP